TOPIC | 1.0 | Welcome/Set up |
| 1.1 | Tue Aug 11 1992 16:50 | Account name has changed | 4 lines |
TOPIC | 4.0 | SPONSOR INFORMATION |
| 4.7 | Wed Aug 04 1993 16:44 | Updated Sponsor list of European AIP-projects | 56 lines |
| 4.9 | Wed Aug 04 1993 16:53 | Updated list of AIP-sales representatives | 65 lines |
| 4.12 | Wed Mar 24 1993 11:23 | LETTER TO AIP SALES REPRESENTATIVES | 85 lines |
| 4.15 | Tue Jun 29 1993 15:12 | EERP-Model FY94 | 210 lines |
TOPIC | 9.0 | Tue Sep 08 1992 15:20 | AIP program status,pointers,minutes | 1 lines |
| 9.12 | Wed Jun 02 1993 15:35 | Porting Support from ARC`s for Researchers | 178 lines |
| 9.13 | Wed Jun 16 1993 11:40 | East-Europe AIP-project-status from Heinz Schrey | 69 lines |
| 9.14 | Wed Jun 16 1993 11:43 | AIP progress France/Gary's response to Albert Mallet | 60 lines |
| 9.16 | Wed Jul 21 1993 17:36 | Formletters to external researchers/Reminders/DEMO requests | 266 lines |
| 9.17 | Tue Aug 24 1993 18:32 | Thanks-letter to researcher | 65 lines |
| 9.19 | Wed Oct 20 1993 16:13 | Set of CD-ROM for Researcher/Formletter | 69 lines |
| 9.20 | Tue Nov 16 1993 15:40 | sw_not_received/AIP follow up list | 33 lines |
| 9.22 | Wed Mar 30 1994 17:05 | Outstanding AIP invoices (DEIL) | 220 lines |
| 9.23 | Thu Apr 07 1994 17:15 | Outstanding AIP invoices | 260 lines |
TOPIC | 10.0 | Distribution to ALPHA Interest groups |
| 10.59 | Thu Apr 21 1994 16:33 | Positive Info sur ALPHA | 246 lines |
TOPIC | 11.0 | A freeware CDROM for Alpha OSF/1 |
| 11.19 | Mon Aug 16 1993 17:16 | 1st Shipment CD-ROM Production to Galway | 101 lines |
| 11.20 | Mon Aug 16 1993 17:17 | 2nd Shipment for CD-ROM Production to Galway | 81 lines |
| 11.21 | Tue Aug 17 1993 16:37 | 3rd DEMO-shipment to GALWAY for CD production | 100 lines |
| 11.22 | Tue Aug 17 1993 18:15 | DEMO Porting of SERPENT UNI Leeds for CD production | 31 lines |
| 11.23 | Fri Aug 20 1993 12:18 | 3 late comer-DEMO's for our CD production sent to Galway | 11 lines |
| 11.24 | Wed Aug 18 1993 11:58 | Bob Jenefsky, Availability of CD-ROM | 32 lines |
| 11.25 | Fri Aug 20 1993 11:54 | Answer for Bob CD availability | 30 lines |
| 11.26 | Thu Aug 19 1993 14:51 | AIP Letter for CD-ROM | 64 lines |
| 11.27 | Fri Aug 20 1993 13:53 | AIP CD-ROM for KIEV/Manager's help required | 84 lines |
| 11.37 | Wed Feb 02 1994 11:40 | Statement from Galway because of missing software | 133 lines |
| 11.38 | Wed Feb 02 1994 11:55 | Clarification of missing software | 34 lines |
| 11.39 | Thu Mar 10 1994 14:21 | AIP CD-ROM's for Digital Consulting @MLN | 104 lines |
| 11.40 | Thu Mar 10 1994 14:24 | AIP CD-ROM'S FOR DECUS MARKETING, UK | 40 lines |
TOPIC | 16.0 | Tue Sep 08 1992 15:31 | A/UNI Salzburg/UPSTAIRS | 227 lines |
| 16.6 | Tue Nov 24 1992 10:14 | AIP-Submission to Alpha-Seed Database | 42 lines |
| 16.7 | Tue Dec 01 1992 13:02 | Salesman has changed | 4 lines |
| 16.9 | Thu Mar 25 1993 13:37 | Order/status info | 45 lines |
| 16.10 | Thu Dec 23 1993 10:32 | Final statement required | 4 lines |
| 16.11 | Wed Jan 19 1994 15:12 | Again final statement required | 4 lines |
| 16.12 | Thu Feb 10 1994 13:43 | Uncertain if sw delivery follows | 11 lines |
TOPIC | 17.0 | Tue Sep 08 1992 15:34 | CH/HCUG Geneva/OSIRIS | 271 lines |
| 17.7 | Thu Nov 26 1992 16:03 | Submission to Alpha Seeds Database | 43 lines |
| 17.9 | Thu Mar 25 1993 11:24 | Sales Representative has changed | 31 lines |
| 17.10 | Tue May 18 1993 16:06 | UA...we need contract back and more infor from YOU! | 46 lines |
| 17.11 | Wed Jun 09 1993 11:25 | UA... Can anyone else help? | 6 lines |
| 17.12 | Thu Jun 17 1993 14:19 | HELP...signed contract missed, order missed | 113 lines |
| 17.13 | Thu Jul 15 1993 11:41 | Salesman changed, signed contract on way | 4 lines |
| 17.14 | Tue Aug 10 1993 20:11 | Statement from Albert Ohayon | 36 lines |
| 17.15 | Thu Aug 19 1993 15:56 | Still waiting for original signed contract back to AIP office | 4 lines |
| 17.16 | Fri Aug 20 1993 13:44 | Refund Release/no original contract back to AIP YET! | 37 lines |
| 17.17 | Wed Aug 25 1993 11:20 | Signed original Cotract seems to on the way again | 29 lines |
TOPIC | 18.0 | Wed Sep 09 1992 12:31 | F/BRGM ORLEANS/GEOLOGIS | 202 lines |
| 18.5 | Mon Dec 21 1992 14:07 | Attention Non-PD-software | 4 lines |
| 18.7 | Thu May 13 1993 16:49 | UA... we need more information from Y O U | 401 lines |
| 18.8 | Tue Jul 27 1993 16:56 | Software received/Refund release/DEMO request to VB | 36 lines |
| 18.9 | Tue Aug 10 1993 19:48 | Memo from Claudia cannot get informations we need | 40 lines |
| 18.10 | Tue Aug 10 1993 19:55 | No DEMO on CD for BRGM | 38 lines |
TOPIC | 19.0 | Thu Sep 10 1992 14:46 | S/BIOMED UPPSALA/PCCE | 214 lines |
| 19.4 | Wed Oct 07 1992 12:13 | Technical/admin.contacts missing | 2 lines |
| 19.6 | Fri Nov 20 1992 09:46 | Acceptance acknowledge | 92 lines |
| 19.7 | Tue Nov 24 1992 10:13 | AIP-Submission to Alpha Seed Database | 47 lines |
| 19.12 | Thu Apr 01 1993 14:24 | Order/Status Info | 44 lines |
| 19.13 | Thu Apr 01 1993 15:11 | AIP did not receive signed contract | 40 lines |
| 19.14 | Thu Apr 08 1993 12:17 | Contract on the way to AIP | 25 lines |
| 19.15 | Thu Feb 10 1994 17:17 | software port still missing - final Statement required | 46 lines |
| 19.16 | Tue Feb 22 1994 16:07 | Status response as soon as possible | 4 lines |
TOPIC | 20.0 | Fri Sep 11 1992 17:57 | I/ENEA ROMA/EDI | 214 lines |
| 20.4 | Wed Oct 07 1992 11:58 | Contact' are missing | 2 lines |
| 20.5 | Tue Oct 27 1992 17:36 | complete Institution Name and contact | 56 lines |
| 20.8 | Thu Jan 07 1993 10:58 | System-Change? | 36 lines |
| 20.9 | Thu Jan 14 1993 14:39 | Answer for System Change | 33 lines |
| 20.10 | Thu Jan 14 1993 14:40 | contracting Cobra | 39 lines |
| 20.11 | Thu Jan 14 1993 14:44 | AIP-I-01/20 issued on January 14, 1993 | 1 lines |
| 20.12 | Tue May 18 1993 15:24 | UA...we need information from Y O U ! | 43 lines |
| 20.14 | Tue May 25 1993 14:27 | Project on HOLD??? | 160 lines |
| 20.15 | Tue May 25 1993 14:28 | Signed Contract under way/Waiting for order | 38 lines |
| 20.18 | Tue Jun 15 1993 14:46 | Contract/Order Status info | 53 lines |
| 20.19 | Tue Jun 15 1993 17:59 | Request for DEMO version | 47 lines |
| 20.20 | Wed Aug 25 1993 12:01 | Approval for freeware CD-ROM | 28 lines |
| 20.21 | Tue Mar 29 1994 17:50 | Reminder - Refund release | 43 lines |
| 20.22 | Thu Apr 07 1994 16:09 | HELP required, Replacement from Andrea Girardi???? | 68 lines |
TOPIC | 22.0 | Mon Sep 14 1992 17:09 | GB/ICRF South Mimms/IGD | 275 lines |
| 22.5 | Thu Oct 22 1992 14:15 | Legal contract partner | 70 lines |
| 22.7 | Wed Nov 04 1992 15:04 | System Choice and Port Category are missing | 1 lines |
| 22.8 | Tue Nov 24 1992 10:11 | AIP-Submission to Alpha Seed Database | 47 lines |
| 22.13 | Tue May 18 1993 16:19 | UA...we need more information from YOU! | 43 lines |
| 22.14 | Tue May 25 1993 14:15 | Order/Status Info | 49 lines |
| 22.15 | Tue Jun 08 1993 15:45 | Porting information - Thank you! | 48 lines |
| 22.16 | Wed Jun 09 1993 15:53 | Jonathan Charles`s status info | 48 lines |
| 22.17 | Tue Jun 15 1993 17:09 | Freeware CD info | 48 lines |
| 22.18 | Tue Jan 11 1994 14:09 | Request for final porting statement | 62 lines |
| 22.19 | Tue Jan 11 1994 14:57 | Final porting statement from research side | 21 lines |
TOPIC | 23.0 | Mon Sep 14 1992 17:21 | F/GENETHON PARIS/LINKAGE | 458 lines |
| 23.7 | Wed Nov 04 1992 15:05 | Port Category is missing | 1 lines |
| 23.8 | Tue Nov 24 1992 10:09 | AIP-Submission to Alpha Seed Database | 41 lines |
| 23.13 | Thu May 13 1993 16:50 | UA...we need more information from Y O U | 401 lines |
| 23.14 | Tue May 25 1993 15:42 | Status Info required | 42 lines |
| 23.15 | Wed Jun 16 1993 17:00 | Wish from Mr. Vaissex for demo on CD-ROM | 42 lines |
| 23.16 | Thu Jun 17 1993 11:16 | Frank's reply | 57 lines |
| 23.18 | Tue Jan 11 1994 12:42 | Request final porting statement | 61 lines |
TOPIC | 24.0 | Mon Sep 14 1992 18:19 | GB/SCFGR Cambridge/ACEDB | 297 lines |
| 24.5 | Wed Oct 07 1992 12:20 | Technical/admin.contacts missing | 2 lines |
| 24.7 | Wed Nov 04 1992 15:07 | Port category is missing | 2 lines |
| 24.8 | Tue Nov 24 1992 13:39 | AIP Submission to Alpha Seed Database | 47 lines |
| 24.10 | Wed Dec 16 1992 10:50 | Address and admin contact | 9 lines |
| 24.12 | Tue May 18 1993 16:28 | UA...we need more information from YOU! | 43 lines |
| 24.13 | Wed Jun 16 1993 16:32 | Reclamation order/status info | 82 lines |
| 24.14 | Tue Jan 11 1994 13:21 | Request of final porting statement | 61 lines |
TOPIC | 25.0 | Mon Sep 14 1992 18:23 | D/DKFZ Heidelberg/IGD | 285 lines |
| 25.6 | Tue Nov 03 1992 16:01 | Admin. and legal contact person | 71 lines |
| 25.8 | Tue Nov 24 1992 10:28 | AIP Submission to Alpha Seed Database | 52 lines |
| 25.9 | Tue Mar 09 1993 10:18 | AIP-D-01/25 contracted Dec.12,92 CLP DM 74.640,- | 1 lines |
| 25.10 | Thu May 13 1993 17:09 | UA...we need more information from Y O U | 33 lines |
| 25.11 | Thu Jun 17 1993 15:47 | ... in process, waiting for order/status info | 2 lines |
| 25.12 | Wed Aug 18 1993 15:23 | written approval for freeware will be send | 3 lines |
| 25.13 | Thu Oct 21 1993 15:28 | Phone- and FAX-numbers | 1 lines |
TOPIC | 26.0 | Mon Sep 14 1992 18:26 | GB/MRC Cambridge/STADEN | 285 lines |
| 26.6 | Tue Nov 24 1992 10:25 | AIP Submission to Alpha Seed Database | 37 lines |
| 26.7 | Wed Dec 16 1992 10:47 | Addresse and Admin Contact! | 8 lines |
| 26.16 | Thu Mar 18 1993 15:52 | Sales Representative changed | 36 lines |
| 26.17 | Tue May 18 1993 16:59 | UA...we need more information from YOU! | 45 lines |
| 26.18 | Wed Jun 16 1993 16:34 | Reclamation order/status info | 82 lines |
| 26.19 | Tue Jan 11 1994 13:20 | Request of final porting statement | 61 lines |
| 26.20 | Wed Jan 26 1994 11:47 | Refund release | 33 lines |
| 26.21 | Wed Mar 30 1994 14:24 | Reminder Refund release | 66 lines |
TOPIC | 27.0 | Mon Sep 14 1992 18:30 | GB/ICRF London/IGD | 281 lines |
| 27.5 | Thu Oct 22 1992 14:16 | Legal contract partner | 69 lines |
| 27.7 | Wed Nov 04 1992 17:00 | NO SYSTEM CHOICE | 1 lines |
| 27.8 | Thu Nov 26 1992 14:37 | Submission to Alpha Seeds Database | 42 lines |
| 27.9 | Thu Nov 26 1992 14:40 | Submission CC: Alpha Seeds MRO | 58 lines |
| 27.12 | Tue May 18 1993 16:19 | UA...we need more information from YOU! | 43 lines |
| 27.13 | Tue May 25 1993 14:16 | order/status info | 49 lines |
| 27.14 | Tue Jun 15 1993 17:10 | Freeware CD info | 48 lines |
| 27.15 | Tue Jun 15 1993 17:11 | Signed original contract still missed | 33 lines |
| 27.16 | Tue Jan 11 1994 13:06 | Request final porting statement | 61 lines |
| 27.17 | Tue Jan 11 1994 15:43 | software on the way | 2 lines |
| 27.18 | Thu Jan 13 1994 16:21 | REFUND RELEASE | 34 lines |
| 27.19 | Tue Jan 18 1994 11:30 | Salesman has changed - NN | 30 lines |
| 27.23 | Wed Mar 30 1994 14:34 | Reminder refund-release | 67 lines |
| 27.24 | Tue Apr 05 1994 15:10 | Reminder Refund to new Salesrep | 126 lines |
| 27.25 | Tue Apr 12 1994 16:13 | Refund release comes back to AIP??? | 30 lines |
| 27.27 | Tue Apr 12 1994 16:15 | Again - reminder for AIP Refund to sales people | 41 lines |
| 27.28 | Thu Apr 14 1994 11:01 | salesperson support | 49 lines |
| 27.29 | Tue Apr 19 1994 11:42 | answer new salesman | 24 lines |
TOPIC | 28.0 | Tue Sep 15 1992 12:02 | D/EMBL Heidelberg/EMBL Appl. | 378 lines |
| 28.5 | Wed Oct 07 1992 12:30 | Technical/admin.contacts missing | 2 lines |
| 28.7 | Tue Nov 03 1992 16:00 | Admin. and legal contact person | 71 lines |
| 28.8 | Tue Nov 24 1992 13:37 | AIP Submission to Alpha Seed Database | 42 lines |
| 28.9 | Tue Nov 24 1992 16:58 | Contact Person - Correction | 74 lines |
| 28.16 | Thu May 13 1993 16:43 | UA...we need more information from Y O U | 64 lines |
| 28.17 | Thu Jun 17 1993 15:49 | ...in process, waiting for order/status | 2 lines |
| 28.20 | Tue Dec 21 1993 17:32 | Final porting-statement | 12 lines |
| 28.22 | Thu Feb 03 1994 15:49 | DOCUMENTATION REQUEST INSTEAD OF SW DELIVERY | 27 lines |
| 28.24 | Tue Feb 08 1994 12:45 | Refund Release | 34 lines |
TOPIC | 29.0 | Tue Sep 15 1992 12:19 | F/CNRS Montpellier/ACEdb | 314 lines |
| 29.6 | Wed Nov 04 1992 15:20 | Port Category is missing | 2 lines |
| 29.7 | Tue Nov 24 1992 17:22 | Submission to Alpha Seed Database | 50 lines |
| 29.9 | Wed Mar 31 1993 15:38 | Original contract necessary for AIP-Project | 37 lines |
| 29.10 | Thu May 13 1993 16:50 | UA...we need more information from Y O U | 401 lines |
| 29.11 | Thu Jun 24 1993 14:59 | Completion of port but software not received | 38 lines |
| 29.13 | Thu Jul 15 1993 14:48 | Operating system problems | 57 lines |
| 29.16 | Wed Aug 11 1993 19:51 | Letter to researcher to provide us with pointer of source | 70 lines |
| 29.17 | Mon Aug 16 1993 15:32 | Nobody alive !!! | 39 lines |
| 29.18 | Wed Aug 18 1993 12:08 | Salesperson has changed | 32 lines |
| 29.19 | Fri Aug 27 1993 13:45 | CD PRODUCTION, FILE PROBLEMS SOLVED | 192 lines |
| 29.20 | Thu Oct 21 1993 17:53 | Refund release | 35 lines |
| 29.21 | Tue Jan 11 1994 10:18 | Distributed - Refund Release | 180 lines |
TOPIC | 30.0 | Tue Sep 15 1992 13:05 | GB/HERIOT-WATT Edinburgh/SPIRIT | 146 lines |
| 30.1 | Wed Sep 23 1992 12:28 | EXHIBIT A | 104 lines |
| 30.7 | Tue Nov 03 1992 13:45 | Institution address legal contact person | 35 lines |
| 30.8 | Thu Nov 26 1992 16:22 | Submission to Alpha Seeds Database | 43 lines |
| 30.10 | Thu Mar 25 1993 11:01 | Order/Status Info | 34 lines |
| 30.11 | Tue Jan 11 1994 12:49 | Request final porting statement | 65 lines |
TOPIC | 31.0 | Tue Sep 15 1992 13:35 | B/FUNDP Namur/LANCELOT | 244 lines |
| 31.1 | Tue Sep 22 1992 13:28 | More detailed Information | 2 lines |
| 31.6 | Wed Nov 04 1992 15:27 | Port Category is missing | 2 lines |
| 31.7 | Tue Nov 24 1992 13:57 | Submission to Alpha Seed Database | 44 lines |
| 31.9 | Thu May 13 1993 17:07 | AIP Office did not receive signed contract | 37 lines |
| 31.10 | Thu May 13 1993 17:22 | Port-Tape is under way | 37 lines |
| 31.11 | Wed Jun 23 1993 11:41 | Software port announced and received | 38 lines |
| 31.12 | Wed Jun 23 1993 12:48 | Approval and DEMO-Version required | 50 lines |
| 31.13 | Wed Jun 23 1993 16:52 | Refund release | 31 lines |
TOPIC | 32.0 | Tue Sep 15 1992 13:38 | B/FUNDP Namur/LSNNO | 232 lines |
| 32.1 | Tue Sep 22 1992 13:30 | More detailed Information | 2 lines |
TOPIC | 33.0 | Tue Sep 15 1992 13:57 | GB/AFRC Colney/GENSTAT | 304 lines |
| 33.6 | Wed Nov 04 1992 15:29 | Port category is missing | 2 lines |
| 33.7 | Thu Nov 26 1992 14:35 | Submission to Alpha Seeds Database | 41 lines |
| 33.8 | Tue Dec 01 1992 17:25 | Address has changed | 45 lines |
| 33.15 | Thu Mar 18 1993 15:51 | Sales Representative changed | 36 lines |
| 33.17 | Tue May 18 1993 16:28 | UA...we need more information from YOU! | 43 lines |
| 33.18 | Wed Jun 16 1993 16:34 | Reclamation order/status info | 82 lines |
| 33.19 | Wed Jun 16 1993 17:16 | Port is done - went well - happy with Alpha | 57 lines |
| 33.20 | Tue Jun 29 1993 14:49 | Port is done | 52 lines |
| 33.21 | Tue Jun 29 1993 14:51 | Refund release | 38 lines |
| 33.22 | Tue Jul 06 1993 13:53 | Software received | 33 lines |
| 33.23 | Tue Jul 06 1993 14:50 | DEMO request to researcher | 70 lines |
| 33.24 | Wed Mar 30 1994 14:56 | Reminder refund-release | 78 lines |
TOPIC | 34.0 | Tue Sep 15 1992 14:48 | B/UCL Louvain/MEDIMAN | 282 lines |
| 34.1 | Tue Sep 22 1992 13:17 | More detailed Information | 2 lines |
| 34.5 | Thu Oct 22 1992 12:23 | Institution contract-contact | 41 lines |
| 34.8 | Wed Nov 04 1992 15:33 | Port category is missing | 2 lines |
| 34.9 | Thu Nov 26 1992 14:17 | consolidates Notes 35 | 1 lines |
| 34.10 | Thu Nov 26 1992 15:26 | Submission to Alpha Seeds Database | 41 lines |
| 34.12 | Thu May 13 1993 17:08 | AIP Office did not receive signed contract | 37 lines |
| 34.13 | Thu May 13 1993 17:23 | Port-Tape is under way | 37 lines |
| 34.14 | Wed Jun 23 1993 11:43 | Software port announced and received | 38 lines |
| 34.15 | Wed Jun 23 1993 12:49 | Approval for DEMO on CD-ROM required | 51 lines |
| 34.16 | Wed Jun 23 1993 16:52 | Refund release | 31 lines |
| 34.17 | Wed Aug 18 1993 15:50 | Approval | 6 lines |
TOPIC | 35.0 | Tue Sep 15 1992 14:52 | B/UCL Louvain/Xinspec | 269 lines |
| 35.1 | Tue Sep 22 1992 13:24 | More detailed Information | 2 lines |
| 35.4 | Thu Nov 26 1992 14:52 | One maschine for 34 and 35 | 1 lines |
| 35.5 | Thu Nov 26 1992 15:00 | Message to Sponsor Martin Malina - please reply | 5 lines |
TOPIC | 36.0 | Tue Sep 15 1992 15:05 | GB/MRC-CRC Harrow/IGD | 266 lines |
| 36.6 | Wed Nov 04 1992 15:34 | Port Category is missing | 1 lines |
| 36.7 | Tue Nov 24 1992 10:15 | AIP-Submission to Alpha-Seed Database | 39 lines |
| 36.8 | Wed Dec 16 1992 10:42 | Address Change and Admin Person | 10 lines |
| 36.10 | Tue May 18 1993 16:28 | UA...we need more information from YOU1! | 43 lines |
| 36.11 | Tue May 18 1993 16:35 | UA...Original signed contract missed | 29 lines |
| 36.12 | Tue Jun 08 1993 15:03 | Order/Status info | 38 lines |
| 36.13 | Wed Jun 09 1993 15:48 | Bob Cox will take care of the status | 37 lines |
| 36.14 | Wed Jun 16 1993 16:35 | Reclamation signed contract/order/status info missed | 82 lines |
| 36.15 | Tue Jul 06 1993 13:53 | Request status info | 33 lines |
| 36.16 | Tue Jul 06 1993 13:54 | Contract not signed yet | 60 lines |
TOPIC | 37.0 | Tue Sep 15 1992 15:41 | D/PO UNI Kiel/FUZZY ECO-FUCS | 245 lines |
| 37.12 | Wed Feb 24 1993 16:26 | AIP-D-14/37 issued Feb.24,1993 CLP DM 55.950,-AIP-D-14/37 issued Febr.24,1993 CLP DM 50.950,-AIP-D-14/37 issued Febr.24,1993 - CLP DM 50.950,- | 1 lines |
| 37.13 | Thu May 13 1993 16:42 | UA...we need more information from Y O U | 43 lines |
| 37.14 | Tue May 18 1993 12:21 | Order/Status Info | 85 lines |
| 37.15 | Tue Jun 15 1993 17:29 | Signed contract still missed/DEMO-Version required | 10 lines |
| 37.16 | Thu Jun 17 1993 11:35 | Original signed contract lost | 37 lines |
| 37.17 | Thu Jun 17 1993 11:36 | Copy of contract requested | 35 lines |
| 37.18 | Wed Jul 28 1993 11:20 | Speed up delivery request from researcher | 7 lines |
| 37.21 | Wed Nov 03 1993 12:57 | Refund release | 34 lines |
| 37.23 | Thu Nov 04 1993 11:45 | Again Refund release - delivery failed | 77 lines |
TOPIC | 38.0 | Tue Sep 15 1992 16:05 | NL/TNO Delft/NEUR.NETW.SEISMIC SYS. | 116 lines |
| 38.4 | Thu Nov 05 1992 11:59 | Open questions, please answer! | 10 lines |
| 38.5 | Thu Jan 07 1993 14:44 | Exhibit A is missing | 1 lines |
| 38.6 | Thu Jan 07 1993 14:53 | Open questions | 68 lines |
| 38.7 | Tue Jan 19 1993 12:54 | Reclamation for Exhibit A | 141 lines |
TOPIC | 39.0 | Wed Sep 16 1992 14:24 | F/BUH Paris/HELIOS | 252 lines |
| 39.4 | Thu Oct 22 1992 14:26 | Legal Contract Partner | 50 lines |
| 39.9 | Thu May 13 1993 16:51 | UA...we need more information from Y O U | 401 lines |
TOPIC | 40.0 | Wed Sep 16 1992 14:28 | D/DKFZ Heidelberg/HELIOS-IRS | 292 lines |
| 40.1 | Wed Sep 23 1992 12:34 | PAULINE DEVOS BACKGROUND INFO | 136 lines |
| 40.5 | Thu Oct 22 1992 14:27 | Legal Contract Partner | 50 lines |
| 40.7 | Tue Nov 24 1992 14:18 | Submission to Alpha Seed Database | 46 lines |
| 40.11 | Tue Dec 22 1992 09:26 | Contracting on HOLD | 31 lines |
| 40.13 | Wed Mar 17 1993 15:15 | Reclamation rejected Flamingo-Contract not back | 28 lines |
| 40.15 | Thu Jun 17 1993 15:53 | order process running | 1 lines |
| 40.16 | Tue Aug 03 1993 12:33 | Delivery problems/Providing of DEMO version critical | 3 lines |
| 40.17 | Tue Oct 26 1993 15:33 | Porting is successfull finished | 2 lines |
| 40.20 | Tue Jan 11 1994 16:04 | Still waiting for software | 3 lines |
| 40.21 | Wed Feb 02 1994 10:57 | Refund release | 33 lines |
TOPIC | 41.0 | Wed Sep 16 1992 14:31 | CH/HCUG Geneva/Nat. Language Proc. | 312 lines |
| 41.6 | Thu Mar 25 1993 11:25 | Sales Representative has changed | 31 lines |
| 41.7 | Tue May 18 1993 16:06 | UA...we need contract back and more info from YOU | 46 lines |
| 41.8 | Wed Jun 09 1993 11:28 | UA... Can anyone else help? | 5 lines |
| 41.9 | Thu Jun 17 1993 14:26 | HELP...signed contract missed, order missed | 113 lines |
| 41.10 | Thu Jul 15 1993 11:43 | Salesman changed, signed contract on way | 4 lines |
| 41.11 | Tue Aug 10 1993 20:11 | Statement from Albert Ohayon | 36 lines |
| 41.12 | Thu Aug 19 1993 16:00 | Still waiting for original signed contract back to AIP office | 4 lines |
| 41.13 | Wed Aug 25 1993 11:22 | Signed original contract seems to on the way again | 29 lines |
| 41.19 | Wed Dec 22 1993 10:18 | Final Statement of porting required | 12 lines |
TOPIC | 42.0 | Wed Sep 16 1992 14:51 | CH/EPFL Lausanne/EMS | 241 lines |
| 42.7 | Tue Nov 24 1992 10:54 | AIP Submission to Alpha Seed Database | 51 lines |
| 42.8 | Tue Nov 24 1992 17:51 | Shipping Information from Galip Ozem | 52 lines |
| 42.9 | Wed Nov 25 1992 11:20 | Shipping address changed | 46 lines |
| 42.10 | Wed Dec 16 1992 10:24 | Adresses! | 62 lines |
| 42.12 | Thu Mar 25 1993 11:17 | Order/Status Info | 86 lines |
| 42.13 | Wed Jun 09 1993 11:33 | UA...Can anyone else help? | 6 lines |
| 42.14 | Thu Jun 17 1993 14:26 | Help...signed contract missed | 113 lines |
| 42.15 | Wed Jun 23 1993 14:41 | Port nearly ready/signed contract missed | 47 lines |
| 42.16 | Thu Jun 24 1993 15:29 | Status ionformation | 98 lines |
| 42.17 | Wed Jun 30 1993 16:00 | Porting Status information | 98 lines |
| 42.18 | Wed Jul 21 1993 14:35 | Porting completed/on way | 72 lines |
| 42.19 | Mon Aug 16 1993 16:11 | Refund release | 33 lines |
TOPIC | 43.0 | Wed Sep 16 1992 15:13 | D/UKH Eppendorf Hamburg/VOXELMAN | 285 lines |
| 43.5 | Tue Nov 24 1992 10:21 | AIP Submission to Alpha Seed Database | 42 lines |
| 43.8 | Tue Jan 12 1993 11:06 | Subsidiary Cost Center and Order-process | 69 lines |
| 43.10 | Tue Feb 09 1993 16:02 | Salesman has changed | 1 lines |
| 43.11 | Tue Feb 16 1993 14:26 | Change again to OSF/1 | 9 lines |
| 43.13 | Thu Mar 11 1993 13:37 | Change OpenVMS in OSF/1 Contract changed | 44 lines |
| 43.14 | Wed Apr 14 1993 13:55 | Porting successful, Flyer for inhouse-publication available | 10 lines |
| 43.15 | Thu May 13 1993 16:40 | UA...we need more information from Y O U | 62 lines |
| 43.16 | Thu May 13 1993 16:44 | UA...we need more information from Y O U | 64 lines |
| 43.17 | Wed Jun 02 1993 17:13 | Waiting for DEMO-Version for AIP | 4 lines |
| 43.18 | Fri Aug 20 1993 15:34 | Refund release has to be clarified | 40 lines |
| 43.19 | Tue Aug 24 1993 10:55 | CD for Researcher! Please approve | 8 lines |
| 43.21 | Tue Apr 12 1994 12:24 | Invoice message from CAS | 28 lines |
TOPIC | 44.0 | Wed Sep 16 1992 17:02 | F/GENETHON Paris/PMCALC | 280 lines |
| 44.3 | Wed Nov 11 1992 13:31 | Clarify with F/GENETHON Paris/LINKAGE Proposal | 9 lines |
TOPIC | 45.0 | Wed Sep 16 1992 17:04 | F/IAP Paris/MIDAS | 137 lines |
| 45.12 | Tue Feb 02 1993 15:03 | Missing Info by contracting Exhibit A Point 3 | 126 lines |
| 45.13 | Tue Mar 02 1993 16:33 | Again request on Exhibit A Point 3 | 49 lines |
| 45.14 | Wed Mar 03 1993 11:09 | French Status - MIDAS-Request | 94 lines |
| 45.15 | Thu Mar 04 1993 15:20 | AIP-F-05/45 issued March 3rd, 1993 CLP FF 190.780,- | 2 lines |
| 45.16 | Thu May 13 1993 16:52 | UA...we need more information from Y O U | 401 lines |
| 45.17 | Tue May 25 1993 15:42 | Status Info required | 42 lines |
| 45.18 | Wed Jun 09 1993 16:59 | Frank`s Answer to licensing | 62 lines |
| 45.19 | Wed Jun 16 1993 11:07 | Legal problem will be solved by addendum | 42 lines |
| 45.20 | Wed Jun 16 1993 11:09 | Non exclusive right within DEC an DEMO required | 42 lines |
| 45.21 | Wed Jun 16 1993 11:10 | Addendum and Licence for ESO MIDAS ok | 53 lines |
| 45.23 | Tue Jun 22 1993 16:42 | Waiting for paperwork and order/status info | 55 lines |
| 45.24 | Tue Aug 03 1993 12:44 | Addendum received/Waiting for Order//Status info | 2 lines |
| 45.26 | Tue Jan 11 1994 12:41 | Request final porting statement | 59 lines |
| 45.28 | Wed Apr 27 1994 11:54 | Refund release | 33 lines |
| 45.29 | Wed Apr 27 1994 12:27 | Address-change, Refund-release again to salesperson | 76 lines |
TOPIC | 46.0 | Wed Sep 16 1992 17:07 | F/02 Technology Versailles/02 | 143 lines |
| 46.6 | Tue Nov 03 1992 13:34 | More Info about businessplan and impact | 42 lines |
| 46.7 | Tue Nov 10 1992 09:51 | Commercial or/and PD-software? | 2 lines |
TOPIC | 47.0 | Wed Sep 16 1992 17:13 | F/CNAM Paris/R.D.P.S | 144 lines |
| 47.10 | Tue Feb 02 1993 12:23 | AIP-F-06/47 issued on February 2nd, 1993 | 1 lines |
| 47.11 | Thu May 13 1993 16:52 | UA...we need more information from Y O U | 401 lines |
| 47.12 | Tue May 25 1993 15:43 | Status Info required | 42 lines |
| 47.13 | Thu Jul 08 1993 10:31 | CNAM contract cancelled | 79 lines |
TOPIC | 48.0 | Wed Sep 16 1992 17:15 | F/IUT Cachan/GMP-2D | 146 lines |
| 48.5 | Tue Nov 10 1992 09:55 | Commercial software! | 2 lines |
| 48.10 | Tue Mar 02 1993 12:30 | AIP-F-14/48 issued March 2nd, 1993 CLP FF 190.780,- | 1 lines |
| 48.11 | Thu May 13 1993 16:52 | UA...we need more information from Y O U | 401 lines |
| 48.12 | Wed Jul 28 1993 14:33 | Refund release/Waiting for DEMO approval for CD-ROM | 39 lines |
| 48.13 | Wed Jul 28 1993 14:54 | DEMO software received/Waiting for approval CD-ROM from researcher | 68 lines |
| 48.14 | Tue Aug 10 1993 19:48 | Memo from Claudia cannot get informations we need | 40 lines |
| 48.15 | Tue Aug 10 1993 19:54 | Use of DEMO version as freeware for CD not clear | 38 lines |
| 48.16 | Wed Aug 18 1993 18:19 | | 2 lines |
TOPIC | 49.0 | Wed Sep 16 1992 17:23 | F/ESIGETEL Avon/DCE/DME | 138 lines |
TOPIC | 50.0 | Wed Sep 16 1992 17:26 | F/INRIA Le Chesnay/MAPLE | 138 lines |
TOPIC | 51.0 | Wed Sep 16 1992 17:29 | F/IN2P3/LAL Orsay/CCP | 100 lines |
| 51.15 | Wed Feb 03 1993 10:19 | Missing priorities of Ports 51-55 | 31 lines |
| 51.16 | Tue Mar 02 1993 16:19 | AIP-F-09/51 issued March 2nd, 1993 CLP FF 254.880,- | 2 lines |
| 51.17 | Thu Apr 08 1993 12:38 | AIP is waiting for Contract oncethey have been translated | 44 lines |
| 51.18 | Thu Apr 08 1993 15:08 | Contract Translation Agreement AIP | 52 lines |
| 51.19 | Thu May 13 1993 16:53 | UA...we need more information from Y O U | 401 lines |
TOPIC | 52.0 | Wed Sep 16 1992 17:34 | F/IN2P3/LAL Orsay/OnX | 104 lines |
| 52.1 | Tue Mar 02 1993 16:21 | see AIP-F-09/51 issued March 2nd, 1993 | 2 lines |
TOPIC | 53.0 | Wed Sep 16 1992 17:38 | F/IN2P3/LAL Orsay/Delphi OED | 108 lines |
| 53.1 | Tue Mar 02 1993 16:23 | see AIP-F-09/51 | 3 lines |
TOPIC | 54.0 | Wed Sep 16 1992 17:43 | F/IN2P3/LAL Orsay/PRIAM | 102 lines |
| 54.1 | Tue Mar 02 1993 16:27 | see AIP-F-09/51 | 2 lines |
TOPIC | 55.0 | Wed Sep 16 1992 17:45 | F/IN2P3/LAL Orsay/H1LOOK | 134 lines |
| 55.1 | Tue Mar 02 1993 16:28 | see AIP-F-09/51 | 4 lines |
TOPIC | 56.0 | Wed Sep 16 1992 17:48 | F/INRIA Le Chesnay/PREVISIA Audio-video | 134 lines |
| 56.5 | Thu Nov 05 1992 11:56 | No answer for open questions! | 5 lines |
| 56.6 | Thu Jan 07 1993 15:36 | Open questions not answered | 72 lines |
| 56.8 | Fri Jan 08 1993 09:29 | Answered Questions from Thierry Krzewina | 61 lines |
| 56.15 | Thu Mar 18 1993 11:22 | Addendum to AIP-F-07/56 new CLP FF 294.880,- | 3 lines |
| 56.16 | Thu May 13 1993 16:53 | UA...we need more information from Y O U | 401 lines |
| 56.17 | Tue May 25 1993 15:44 | Status Info required | 42 lines |
| 56.18 | Tue Jun 22 1993 16:41 | Signed contract received | 55 lines |
| 56.20 | Tue Jan 11 1994 12:39 | Request final porting statement | 60 lines |
TOPIC | 57.0 | Wed Sep 16 1992 17:53 | F/IN2P3 Villeurbanne/GALEPH | 221 lines |
| 57.4 | Thu Nov 05 1992 12:05 | Sponsor missing! No answer! | 8 lines |
| 57.8 | Tue Feb 02 1993 15:49 | Missing info by contracting Exhibit A Point3 a.s.o | 259 lines |
| 57.9 | Tue Feb 16 1993 12:56 | Adresse and legal contact person | 59 lines |
| 57.10 | Tue Feb 16 1993 14:03 | Open Questions Adresse | 38 lines |
| 57.11 | Tue Mar 02 1993 10:40 | AIP-F-08/57 issued February 25th, 1993 CLP FF254,880 | 2 lines |
| 57.12 | Thu Apr 08 1993 12:39 | AIP is waiting for contract once they have been translated | 44 lines |
| 57.13 | Thu Apr 08 1993 15:08 | Contract Translation Agreement AIP | 52 lines |
| 57.14 | Thu May 13 1993 16:54 | UA...we need more information from Y O U | 401 lines |
| 57.15 | Tue May 25 1993 17:10 | Missing signed contract | 29 lines |
| 57.16 | Tue Jun 22 1993 16:40 | reclamation of signed contract | 55 lines |
| 57.18 | Tue Jan 11 1994 12:37 | Request of final porting statement | 61 lines |
TOPIC | 58.0 | F/CNRS/IN2P3 Marseille/RETAP |
| 58.4 | Thu Nov 05 1992 12:07 | Open questions, no Sponsor! | 11 lines |
| 58.8 | Wed Feb 03 1993 13:49 | AIP-F-10/58 issued on February 3rd, 1993 | 1 lines |
| 58.9 | Thu Apr 08 1993 12:40 | AIP is waiting for Contract once they have been translated | 44 lines |
| 58.10 | Thu Apr 08 1993 15:09 | Contract Translation Agreement AIP | 52 lines |
| 58.11 | Thu May 13 1993 16:54 | UA...we need more information from Y O U | 401 lines |
| 58.16 | Thu Mar 17 1994 13:33 | Refund release - see file hardcopy-letter March 16, 1994 | 53 lines |
| 58.20 | Tue Apr 26 1994 16:40 | Again refund release | 149 lines |
TOPIC | 59.0 | Wed Sep 16 1992 18:37 | F/ESIM/IMT Marseille/GK | 280 lines |
| 59.4 | Wed Oct 21 1992 18:18 | Institution Info from Philippe Manin | 80 lines |
| 59.5 | Wed Oct 21 1992 18:22 | Sponsor-Name-Info from Philippe Manin | 28 lines |
| 59.12 | Wed Feb 03 1993 13:47 | AIP-F-11/59 issued on February 3rd, 1993 | 1 lines |
| 59.14 | Thu May 13 1993 16:55 | UA...we need more information from Y O U | 401 lines |
| 59.16 | Tue Jan 11 1994 11:46 | final porting statement required | 62 lines |
TOPIC | 60.0 | Wed Sep 16 1992 18:47 | D/MAX PLANCK Martinsried/PROTEIN | 195 lines |
| 60.5 | Thu Oct 22 1992 10:59 | Contract-partner of the Instituion | 32 lines |
| 60.8 | Fri Nov 20 1992 09:47 | Acceptance acknowledge | 91 lines |
| 60.9 | Tue Nov 24 1992 10:20 | AIP Submission to Alpha Seed Database | 36 lines |
| 60.10 | Tue Mar 09 1993 10:38 | AIP-D-02/60 contracted Dec.10,92 CLP DM 87.157,- | 1 lines |
| 60.11 | Thu Apr 08 1993 11:03 | Order/Status info | 51 lines |
| 60.15 | Wed Jun 23 1993 16:47 | Refund release | 3 lines |
| 60.16 | Wed Jun 23 1993 17:24 | Refund release/VAT clarification | 53 lines |
| 60.17 | Thu Jun 24 1993 15:23 | Credit note ./. charging | 203 lines |
| 60.18 | Wed Jun 30 1993 12:19 | Port received/Renewed submission for DEMO middle of July | 4 lines |
| 60.19 | Tue Aug 17 1993 16:53 | 2 DEMOS OpenVMS/OSF1 for CD/Researcher asked for a CD | 3 lines |
| 60.20 | Wed Aug 18 1993 18:13 | Approval on the documentation | 2 lines |
TOPIC | 61.0 | Wed Sep 16 1992 18:54 | D/DESY Hamburg/TROJAN | 278 lines |
| 61.4 | Wed Oct 21 1992 18:47 | Telefon-Notice Theo Kunstleben | 10 lines |
| 61.12 | Wed Jan 27 1993 14:50 | AIP-D-10/61 issued on January 28, 1993 | 1 lines |
| 61.13 | Thu May 13 1993 16:40 | UA...we need more information from Y O U | 62 lines |
| 61.14 | Wed Jun 02 1993 17:11 | Contract not signed/Order-process postponed | 6 lines |
| 61.15 | Tue Jun 08 1993 14:50 | Port is done - Waiting for signed contract | 7 lines |
| 61.16 | Wed Jun 30 1993 16:19 | Reminder demo-version | 6 lines |
| 61.17 | Thu Dec 23 1993 09:58 | Final Statement required | 7 lines |
| 61.18 | Tue Feb 01 1994 11:41 | No Refund because software missing | 45 lines |
TOPIC | 62.0 | Wed Sep 16 1992 19:01 | D/DKRZ Hamburg/HOPE | 282 lines |
| 62.4 | Wed Oct 21 1992 18:58 | Telefon-Notice Theo Kunstleben | 9 lines |
| 62.6 | Tue Nov 10 1992 14:06 | Acceptance-acknowledge | 3 lines |
| 62.7 | Tue Nov 24 1992 14:32 | Submission to Alpha Seed Database | 42 lines |
| 62.9 | Wed Apr 14 1993 13:42 | Order/Status Info | 2 lines |
| 62.10 | Thu May 13 1993 16:41 | UA...we need more information from Y O U | 62 lines |
| 62.11 | Wed Jun 02 1993 17:04 | Order-process postponed/Signed contract missing | 6 lines |
| 62.12 | Tue Jun 08 1993 14:44 | Port is done | 6 lines |
| 62.14 | Wed Jun 23 1993 17:22 | Refund release | 73 lines |
| 62.15 | Thu Jul 08 1993 10:17 | CAS information/Refund | 121 lines |
| 62.16 | Tue Oct 12 1993 14:25 | DEIL INVOICES | 34 lines |
| 62.17 | Tue Oct 12 1993 14:26 | Refund release to DEIL | 147 lines |
TOPIC | 63.0 | Wed Sep 16 1992 19:27 | CH/PSI Villigen/TANDEM | 741 lines |
| 63.11 | Thu Apr 08 1993 11:30 | Order/Status-Info | 44 lines |
| 63.12 | Thu Apr 08 1993 11:42 | signed contract missed | 34 lines |
| 63.13 | Wed Apr 14 1993 16:02 | Delivery- and Porting-dates | 44 lines |
| 63.14 | Wed Jun 09 1993 11:37 | Peter Heusi will help with DEMO-Version | 6 lines |
| 63.15 | Thu Jun 17 1993 14:29 | Please clarify the porting-deadline | 113 lines |
| 63.16 | Tue Jul 06 1993 17:10 | Porting difficulties/Manpower problems | 2 lines |
| 63.17 | Tue Dec 21 1993 17:07 | Final Statement of porting | 6 lines |
TOPIC | 64.0 | Wed Sep 16 1992 19:38 | D/EMBL-Heidelberg/WHATIF | 247 lines |
| 64.8 | Thu Oct 08 1992 10:40 | Angela Loh reply adress | 32 lines |
| 64.9 | Thu Oct 08 1992 10:45 | Angela Loh/Principal investigators | 29 lines |
| 64.11 | Tue Nov 03 1992 16:02 | Admin. and legal contact person | 71 lines |
| 64.12 | Fri Nov 20 1992 09:47 | Acceptance acknowledge | 92 lines |
| 64.13 | Tue Nov 24 1992 15:36 | Submission to Alpha Seed Database | 47 lines |
| 64.18 | Wed Apr 28 1993 11:32 | 2nd Certification of AIP-D-06/64 Contract | 57 lines |
| 64.19 | Wed Apr 28 1993 11:34 | Info an Sales Representative about Order process | 44 lines |
| 64.20 | Thu May 13 1993 16:44 | UA...we need more information from Y O U | 64 lines |
| 64.21 | Tue Jul 20 1993 12:21 | Order/Status info | 2 lines |
| 64.26 | Tue Oct 12 1993 14:25 | Deil Invoices | 34 lines |
| 64.27 | Tue Oct 12 1993 14:27 | Refund release to DEIL | 147 lines |
TOPIC | 65.0 | Wed Sep 16 1992 19:42 | GB/UNI Leeds/SERPENT | 221 lines |
| 65.6 | Wed Nov 04 1992 10:29 | Attention: Institution should not be contacted | 34 lines |
| 65.7 | Wed Nov 04 1992 10:31 | Submission on hold | 27 lines |
| 65.9 | Fri Nov 20 1992 09:49 | Submission "ON HOLD" see last paragraph | 92 lines |
| 65.18 | Thu Mar 04 1993 13:32 | AIP-GB-08/65 issued March 3rd, 1993 CLP � 31.223,60 | 1 lines |
| 65.43 | Thu Apr 01 1993 14:16 | Final contract AIP-GB-08/65 issued Mrch 31st/CLP �44000, | 1 lines |
| 65.45 | Wed Apr 14 1993 13:08 | Cross over Messages | 42 lines |
| 65.46 | Tue May 18 1993 16:44 | UA...we need more information from YOU! | 43 lines |
| 65.47 | Wed Jun 16 1993 16:36 | Reclamation order/status info | 82 lines |
| 65.48 | Thu Jun 17 1993 14:50 | Order info/Port for CD uncertain! | 36 lines |
| 65.53 | Wed Mar 30 1994 15:10 | Reminder refund release | 65 lines |
TOPIC | 66.0 | Wed Sep 16 1992 19:48 | GB/BIRKBECK COLLEGE London/HOMOLOGY MAPPING | 211 lines |
| 66.5 | Thu Oct 22 1992 14:24 | Legal contract person | 23 lines |
| 66.7 | Wed Nov 11 1992 13:46 | "HOLD" FOR THIS SUBMISSION | 68 lines |
| 66.8 | Fri Nov 20 1992 09:50 | Submission "ON HOLD" see last paragraph | 92 lines |
TOPIC | 67.0 | Wed Sep 16 1992 20:16 | F/CNRS/INSU Marseille/ESO-MIDAS | 477 lines |
| 67.6 | Thu Nov 05 1992 13:49 | Missing more information | 10 lines |
| 67.7 | Wed Mar 03 1993 14:51 | see AIP-F-13/90 | 1 lines |
TOPIC | 68.0 | Wed Sep 16 1992 20:27 | CH/EPFL Lausanne/NEWTON Concurrent | 29547 lines |
| 68.7 | Thu Dec 03 1992 15:57 | Address-Change an Operating-System-Change | 7 lines |
| 68.8 | Wed Dec 16 1992 11:03 | Platform and PI | 67 lines |
| 68.10 | Tue Dec 22 1992 09:53 | Note to Sponsor Flamingo contracted | 11 lines |
| 68.11 | Thu Mar 25 1993 11:21 | Order/Status Info | 86 lines |
| 68.12 | Wed Jun 09 1993 11:41 | Peter Heusi offered help | 6 lines |
| 68.13 | Thu Jun 17 1993 14:31 | Help...signed contract missed | 113 lines |
| 68.14 | Wed Jun 30 1993 15:59 | Porting status information | 98 lines |
| 68.15 | Wed Jul 21 1993 14:37 | Porting completed/on way | 72 lines |
| 68.16 | Tue Aug 10 1993 17:08 | DEMO and software received on one tape | 3 lines |
| 68.17 | Wed Aug 11 1993 12:56 | Refund Release | 33 lines |
TOPIC | 69.0 | Fri Sep 25 1992 14:38 | P/FCCN Lisboa/ AEDE,SISPLA,DYSE | 99 lines |
| 69.5 | Tue Nov 03 1992 17:23 | Applications list | 62 lines |
| 69.6 | Thu Nov 05 1992 13:53 | Missing answers | 6 lines |
| 69.7 | Thu Jan 07 1993 17:29 | John Kreatsoulas - can you help? | 11 lines |
| 69.11 | Tue Jan 19 1993 14:14 | Price Difference Cobra | 50 lines |
| 69.16 | Wed Feb 17 1993 19:11 | AIP-P-01/69 issued February 18th, 1993 | 1 lines |
| 69.17 | Thu Mar 25 1993 11:39 | Part of order/status info | 38 lines |
| 69.18 | Thu Apr 08 1993 12:25 | Order/Status info | 37 lines |
| 69.20 | Thu May 13 1993 16:47 | UA...we need more information from Y O U | 38 lines |
| 69.21 | Tue May 18 1993 12:28 | Requested Information from Sponsor | 85 lines |
| 69.22 | Tue May 25 1993 15:54 | Delivery delay due to Manufacturing problems | 33 lines |
| 69.24 | Wed May 04 1994 17:20 | Answering Francisca's memo | 35 lines |
TOPIC | 70.0 | PL/Univ.Warsaw/MOLEDIT/AVS/ACCIDE |
| 70.3 | Wed Sep 23 1992 11:58 | Bob Jenefsky further Background | 39 lines |
| 70.4 | Wed Sep 23 1992 12:17 | Heinz Schrey's Background info | 50 lines |
| 70.12 | Tue Nov 10 1992 12:21 | Contact? | 2 lines |
| 70.27 | Tue Feb 09 1993 15:34 | AIP-PL-01/70 issued on February 8th, 1993 | 1 lines |
| 70.30 | Wed Mar 17 1993 15:32 | AVS request sent to campusbased engineering center | 37 lines |
| 70.32 | Wed Mar 24 1993 13:37 | Heinz Schrey`s answer for Waclaw | 1284 lines |
| 70.39 | Thu May 13 1993 17:01 | Feedback from Waclaw required | 36 lines |
| 70.40 | Thu May 13 1993 17:02 | Required Status-report from sponsors | 117 lines |
| 70.41 | Thu May 13 1993 17:04 | Sponsor`s Status-reply | 36 lines |
| 70.45 | Tue Jun 15 1993 14:06 | Status message Heinz Schrey | 163 lines |
| 70.46 | Tue Jun 15 1993 15:18 | Signed original contract missed | 5 lines |
| 70.47 | Wed Jun 16 1993 16:54 | Signed original contract on the way | 48 lines |
| 70.51 | Tue Jun 29 1993 15:02 | Bob Jenefsky`s follow up eastern projects | 39 lines |
| 70.57 | Tue Apr 12 1994 16:58 | Reclamation fax from UNI Warsaw | 71 lines |
| 70.63 | Tue May 31 1994 17:50 | Again Reminder | 196 lines |
| 70.64 | Wed Jun 08 1994 14:26 | Help request to sponsor team for clarification | 214 lines |
| 70.65 | Wed Jun 08 1994 14:32 | Answer from Zbigniew now received | 83 lines |
| 70.66 | Wed Jun 08 1994 14:55 | Salesperson status an co-sponsor for comment | 110 lines |
TOPIC | 71.0 | Thu Sep 17 1992 11:19 | IS/HEBREW UNI Jerusalem/EX-Libris | 59 lines |
| 71.2 | Thu Nov 05 1992 13:57 | No response from Gil Paecht | 1 lines |
TOPIC | 72.0 | P/ITEC-SPIN Lisboa/Alphaseed2 |
| 72.4 | Tue Nov 03 1992 17:23 | Applications list not available | 62 lines |
| 72.5 | Thu Nov 05 1992 13:59 | No answer as requested | 4 lines |
TOPIC | 73.0 | Fri Sep 25 1992 14:26 | D/MAX PLANCK Heidelberg/XDS/XSCALE/COMBINE/DSSP | 211 lines |
| 73.9 | Fri Nov 20 1992 09:51 | Submission "ON HOLD" see last paragraph | 92 lines |
| 73.12 | Thu Jan 07 1993 13:31 | Customer complaint | 46 lines |
| 73.13 | Thu Jan 14 1993 10:03 | Maybe System Change | 10 lines |
| 73.14 | Tue Jan 19 1993 09:26 | System Change into Sandpiper from Angela Loh | 35 lines |
| 73.17 | Tue May 11 1993 11:19 | Order/Status Info | 136 lines |
| 73.18 | Thu May 13 1993 16:38 | UA... we need more information from Y O U | 43 lines |
| 73.19 | Thu Jun 17 1993 16:59 | Maschine delivered - Compiler problems | 8 lines |
| 73.20 | Tue Jul 20 1993 12:34 | Invoice/delivery dates | 2 lines |
| 73.21 | Wed Jul 21 1993 17:26 | Easy porting with ALPHA/DEMO for CD-ROM on way | 18 lines |
| 73.22 | Wed Jul 28 1993 12:07 | Refund release | 34 lines |
| 73.23 | Wed Jul 28 1993 12:28 | Freeware DEMO received/Thanks to researcher | 70 lines |
TOPIC | 74.0 | Tue Sep 22 1992 13:56 | D/RK UNI Heidelberg/JULIA-ALEPH | 308 lines |
| 74.11 | Wed Apr 28 1993 14:19 | Order/Status Info | 27 lines |
| 74.12 | Thu May 13 1993 16:46 | UA...we need more information from Y O U | 64 lines |
| 74.13 | Thu Jul 08 1993 17:05 | Porting problems | 59 lines |
| 74.14 | Tue Jul 13 1993 11:44 | Communication Tools not deliverable/DEMO request | 13 lines |
| 74.15 | Thu Jul 29 1993 17:36 | Freeware DEMO till 15th of August promised | 9 lines |
| 74.16 | Wed Aug 11 1993 12:12 | Refund Release | 34 lines |
| 74.17 | Wed Oct 20 1993 18:26 | SUMMARY OF PORTING EXPERIENCES | 183 lines |
TOPIC | 75.0 | H/MTA Sztaki Budapest/DORQC/ICMLDS/CRDB |
| 75.2 | Tue Nov 03 1992 14:46 | Message from Zoltan Kiss-Pal | 64 lines |
| 75.3 | Tue Nov 10 1992 16:09 | Proposal Summary | 359 lines |
| 75.13 | Wed Feb 10 1993 10:41 | AIP-H-01/75 issued February 9th, 1993 | 1 lines |
| 75.15 | Tue May 18 1993 14:37 | DEMO-Version Request | 38 lines |
| 75.17 | Tue Jun 15 1993 14:05 | Status message Heinz Schrey | 163 lines |
| 75.18 | Tue Jun 29 1993 15:01 | Bob Jenefsky`s follow up eastern projects | 39 lines |
| 75.19 | Thu Jul 29 1993 14:32 | Heinz Schrey's engagement to get DEMO for CD | 71 lines |
| 75.21 | Wed Aug 11 1993 20:20 | Letter from Heinz Schrey | 70 lines |
TOPIC | 76.0 | H/TU Budapest/TELEPRO/MULTIVOX-Edu |
| 76.3 | Tue Nov 03 1992 14:50 | Message from Zoltan Kiss-Pal | 62 lines |
| 76.15 | Wed Feb 10 1993 14:50 | AIP-H-02/76 issued February 9th, 1993 | 1 lines |
| 76.17 | Tue May 18 1993 14:38 | DEMO-Version Request | 38 lines |
| 76.19 | Tue Jun 15 1993 14:05 | Status message Heinz Schrey | 163 lines |
| 76.20 | Tue Jun 29 1993 15:02 | Bob Jenefsky's follow up eastern projects | 39 lines |
| 76.25 | Tue Oct 26 1993 14:57 | Refund Release | 35 lines |
| 76.26 | Tue Nov 02 1993 10:49 | Heinz Schrey's reply for ordering DECtalk | 73 lines |
TOPIC | 77.0 | H/ELTE Uni Budapest/PURKINJE |
| 77.3 | Tue Nov 03 1992 14:47 | Message from Zoltan Kiss-Pal | 61 lines |
| 77.16 | Thu Feb 11 1993 11:10 | Submission-close due to budget reasons | 2 lines |
TOPIC | 78.0 | PL/Warsaw WUT/UNIGRAPHICS |
| 78.10 | Thu Feb 11 1993 11:06 | Submission-Close due to Budget reasons | 2 lines |
TOPIC | 80.0 | Wed Oct 07 1992 15:16 | CS/CVUT Prague/CGP and EYE | 230 lines |
| 80.1 | Wed Oct 07 1992 15:13 | CS/CVUT Prague/??? | 7 lines |
| 80.6 | Thu Nov 05 1992 14:28 | Agreement Form missing | 2 lines |
| 80.17 | Wed Feb 17 1993 12:12 | AIP-CS-01/80 issued February 17th, 1993 | 1 lines |
| 80.22 | Wed Mar 17 1993 16:34 | Sending messages and addendum again | 429 lines |
| 80.23 | Thu Mar 25 1993 11:34 | Wrong Order/Status info | 112 lines |
| 80.24 | Thu Mar 25 1993 11:36 | Uncomplete order/status info | 41 lines |
| 80.25 | Wed Mar 31 1993 14:05 | Perhaps System-Change by mistake? | 35 lines |
| 80.26 | Wed Mar 31 1993 17:12 | License problems | 76 lines |
| 80.27 | Tue Apr 13 1993 11:37 | Order/Status Info | 79 lines |
| 80.28 | Tue Apr 13 1993 11:43 | Heinz Schrey's answer regarding the new submission | 66 lines |
| 80.30 | Tue Jun 08 1993 15:18 | Help required | 104 lines |
| 80.34 | Tue Jun 15 1993 13:47 | Bohuslav`s order placement problem with Finance | 103 lines |
| 80.35 | Tue Jun 15 1993 13:54 | Information Budget Status an Bohuslav by mail | 117 lines |
| 80.36 | Tue Jun 15 1993 13:57 | Status message Heinz Schrey | 163 lines |
| 80.37 | Wed Jun 16 1993 10:45 | Heinz`s/Gary`s commitment about order placement problems with finanace | 212 lines |
| 80.38 | Tue Jun 29 1993 14:57 | Bob Jenefsky`s follow up eastern projects | 39 lines |
TOPIC | 83.0 | Tue Sep 22 1992 16:53 | D/UNI Tuebingen/TUSTEP | 242 lines |
| 83.1 | Tue Sep 22 1992 16:55 | More detailed Information | 2 lines |
| 83.3 | Fri Sep 25 1992 15:50 | Product Description TUSTEP | 69 lines |
| 83.10 | Thu Nov 05 1992 14:42 | No Sponsor-Name | 3 lines |
TOPIC | 84.0 | Wed Sep 23 1992 11:25 | F/SIMULOG Valbonne/NS3T3CD/FLUID MECHANICS | 274 lines |
| 84.1 | Thu Sep 24 1992 12:11 | More detailed info | 3 lines |
| 84.8 | Tue Oct 27 1992 17:42 | More detailed info | 26 lines |
| 84.9 | Tue Oct 27 1992 17:43 | More detailed impact info | 34 lines |
| 84.10 | Thu Nov 05 1992 15:35 | Answers from Louis Pau | 66 lines |
| 84.29 | Thu Apr 08 1993 14:37 | Request for Original Contracts back due to cancellation | 29 lines |
| 84.30 | Thu May 27 1993 16:50 | Louis Pau`s reclamation Alpha machines | 151 lines |
| 84.31 | Thu May 27 1993 16:53 | AIP answer - no acceptance of new proposals | 90 lines |
| 84.32 | Tue Jul 20 1993 16:10 | Unsigned original contracts back to AIP | 1 lines |
TOPIC | 85.0 | Wed Sep 23 1992 14:52 | GR/FORTH Heraklion/FORTRAN-BASED BIOLOGY/BIOTECH PROGR. | 253 lines |
| 85.6 | Tue Nov 24 1992 10:18 | AIP Submission to Alpha Seed Database | 38 lines |
| 85.13 | Tue Mar 09 1993 10:52 | CLP DRACHMAS 15.352.140 AIP-GR-01/85 | 1 lines |
| 85.14 | Thu Mar 25 1993 13:03 | Order/status info | 52 lines |
| 85.15 | Wed Jun 09 1993 15:45 | New Porting-Deadline | 52 lines |
| 85.16 | Wed Aug 18 1993 15:29 | Approval for freeware | 3 lines |
| 85.17 | Thu Aug 19 1993 14:56 | Approval from Vangelis, Customer approval will follow | 27 lines |
TOPIC | 86.0 | A/JOANNEUM RESEARCH/FEJUX |
| 86.4 | Tue Nov 03 1992 15:12 | Further Info from Uwe Schmidt | 29 lines |
| 86.5 | Tue Nov 03 1992 15:14 | Further Info from Uwe Schmidt | 32 lines |
| 86.6 | Wed Nov 25 1992 15:47 | Message to "UWE" | 14 lines |
| 86.14 | Tue Feb 23 1993 10:17 | System Change into OSF/1 | 2 lines |
| 86.15 | Tue Feb 23 1993 12:57 | AIP-A-02/86 issued Feb.23rd,1993 CLP �S 549.031,- | 2 lines |
| 86.16 | Wed Apr 14 1993 16:05 | Order/Status Info | 71 lines |
| 86.17 | Tue Jun 15 1993 15:25 | Port finished | 102 lines |
| 86.18 | Tue Jun 15 1993 15:27 | Waiting for software/DEMO/Refund | 44 lines |
| 86.19 | Tue Jul 20 1993 15:31 | Software not received yet | 4 lines |
| 86.20 | Tue Aug 10 1993 16:52 | DEMO and completed software on one Tape received | 3 lines |
| 86.21 | Wed Aug 11 1993 12:45 | Refund Release | 33 lines |
TOPIC | 88.0 | CH/ETHZ Zuerich/GROMOS |
| 88.3 | Thu Oct 22 1992 11:14 | Institution address | 51 lines |
| 88.5 | Tue Oct 27 1992 17:49 | Institution "Eidgen�ssische Techn. Hochschule" | 44 lines |
| 88.7 | Fri Nov 20 1992 09:53 | Acceptance Acknowledge | 199 lines |
| 88.8 | Tue Nov 24 1992 16:43 | Submission to Alpha Seed Database | 45 lines |
| 88.11 | Thu Apr 08 1993 11:29 | Order/Status Info | 44 lines |
| 88.12 | Thu Apr 08 1993 11:40 | Signed contract missed | 34 lines |
| 88.13 | Wed Apr 14 1993 16:01 | Delivery and Porting-dates | 44 lines |
| 88.14 | Wed Jun 09 1993 11:44 | Peter Heusi`s Help for DEMO-Version | 3 lines |
| 88.15 | Thu Jun 17 1993 14:34 | New Status | 113 lines |
| 88.16 | Tue Jul 06 1993 17:18 | Description for CD-ROM | 6 lines |
| 88.17 | Tue Aug 10 1993 18:48 | Short Description for CD-ROM received | 3 lines |
TOPIC | 89.0 | CH/ETHZ Zuerich/3DQCT |
| 89.3 | Thu Oct 22 1992 11:15 | Instituion address | 51 lines |
| 89.5 | Tue Oct 27 1992 17:52 | Instituion "Eidgen�ssische Techn. Hochschule" | 44 lines |
| 89.7 | Thu Nov 05 1992 15:47 | Acceptance acknowledge - Info | 90 lines |
| 89.9 | Tue Nov 24 1992 10:17 | AIP-Submission to Alpha Seed Database | 43 lines |
| 89.11 | Thu Apr 08 1993 11:29 | Order/Status-Info | 44 lines |
| 89.12 | Thu Apr 08 1993 11:40 | Signed contract missed | 34 lines |
| 89.13 | Wed Apr 14 1993 16:01 | Delivery and Porting-dates | 44 lines |
| 89.14 | Thu May 06 1993 16:25 | Software received - Demo Version follows | 6 lines |
| 89.15 | Wed Jun 09 1993 11:47 | Peter Heusi`s Help | 4 lines |
| 89.16 | Thu Jun 17 1993 14:35 | New Status | 113 lines |
| 89.17 | Wed Jun 23 1993 17:13 | Refund release | 31 lines |
| 89.18 | Tue Jul 06 1993 17:22 | DEMO promised | 2 lines |
| 89.19 | Wed Jul 28 1993 12:47 | Freeware DEMO received/Thanks to researcher | 68 lines |
TOPIC | 90.0 | Wed Oct 21 1992 16:47 | F/IRCAM Paris/SVP | 147 lines |
| 90.1 | Wed Oct 21 1992 16:51 | Attention | 1 lines |
| 90.3 | Thu Nov 05 1992 14:49 | Open questions mail 13th oct. | 2 lines |
| 90.9 | Thu Jan 07 1993 16:40 | One Station for 90, 91 and 92 | 2 lines |
| 90.12 | Thu Feb 04 1993 15:53 | AIP-F-13/90 issued February 4th, 1993 | 1 lines |
| 90.13 | Thu May 13 1993 16:56 | UA...we need more information from Y O U | 401 lines |
| 90.14 | Tue May 25 1993 15:45 | Status info required | 42 lines |
| 90.16 | Mon Aug 16 1993 16:01 | Refund release | 34 lines |
| 90.17 | Thu Oct 21 1993 18:27 | Refund reminder to DEIL | 65 lines |
TOPIC | 91.0 | Wed Oct 21 1992 17:10 | F/IRCAM Paris/MAX | 141 lines |
| 91.1 | Wed Oct 21 1992 17:12 | Attention | 1 lines |
| 91.2 | Thu Nov 05 1992 14:51 | open questions mail 13th oct | 3 lines |
| 91.3 | Thu Jan 07 1993 16:41 | One Station for 90, 91 and 92 | 1 lines |
TOPIC | 92.0 | Wed Oct 21 1992 17:15 | F/IRCAM Paris/UDI | 204 lines |
| 92.1 | Wed Oct 21 1992 17:18 | Attention | 1 lines |
| 92.2 | Thu Nov 05 1992 14:53 | Open questions mail 13th oct | 2 lines |
| 92.3 | Thu Jan 07 1993 16:42 | One Station for 90, 91 and 92 | 2 lines |
TOPIC | 93.0 | Tue Oct 27 1992 18:13 | D/CIS Muenchen/SONIA and LEXICAL DATABASE | 138 lines |
| 93.1 | Wed Nov 11 1992 09:46 | Completed Agreement Form | 177 lines |
| 93.11 | Wed Jan 27 1993 17:42 | AIP-D-11/93 issued on January 28, 1993 | 1 lines |
| 93.12 | Thu Mar 18 1993 09:34 | Sales Rep has changed | 27 lines |
| 93.14 | Thu Apr 08 1993 10:59 | Order/Status Info | 31 lines |
| 93.16 | Mon Aug 16 1993 16:07 | Refund release | 32 lines |
| 93.17 | Tue Aug 24 1993 12:02 | CD for researcher, please approve | 1 lines |
TOPIC | 94.0 | Tue Nov 03 1992 18:59 | D/GMD St. Augustin/LISS | 239 lines |
| 94.1 | Tue Nov 10 1992 15:21 | Agreement Form | 244 lines |
| 94.10 | Tue Jan 12 1993 16:46 | System choice reclamation from Sponsor | 33 lines |
| 94.11 | Thu Jan 14 1993 16:09 | Sales Rep and System Choice | 4 lines |
| 94.14 | Thu Jan 28 1993 12:28 | AIP-D-12/94 issued on January 28, 1993 | 1 lines |
| 94.15 | Thu Mar 25 1993 11:31 | Order/Status info | 31 lines |
| 94.16 | Wed Apr 28 1993 14:17 | Order/Status Info | 2 lines |
| 94.17 | Tue Jun 29 1993 11:59 | Port is ready - will be sent til 12 of July | 8 lines |
| 94.19 | Tue Jul 13 1993 12:17 | DEMO request ok | 5 lines |
| 94.20 | Tue Jul 13 1993 14:53 | Refund release | 79 lines |
| 94.21 | Wed Jul 14 1993 10:46 | VB has changed | 30 lines |
| 94.22 | Wed Aug 18 1993 18:16 | extra approval not neccessary | 2 lines |
| 94.23 | Thu Nov 11 1993 15:23 | Complete LISS porting into DEC database for internal use only | 50 lines |
TOPIC | 95.0 | Thu Nov 05 1992 15:23 | CH/UNI Basel/HASSLE | 292 lines |
| 95.8 | Thu Feb 04 1993 15:46 | AIP-CH-07/95 issued February 4th, 1993 | 2 lines |
| 95.9 | Tue Feb 09 1993 11:11 | Peter Heusi to Sponsor | 128 lines |
| 95.10 | Thu Apr 08 1993 11:30 | Order/Status-Info | 44 lines |
| 95.11 | Thu Apr 08 1993 11:42 | signed Contract missed | 34 lines |
| 95.12 | Wed Apr 14 1993 16:02 | Delivery and Porting-dates | 44 lines |
| 95.13 | Wed Jun 09 1993 11:52 | Peter Heusi's Help | 6 lines |
| 95.14 | Thu Jun 17 1993 14:37 | New Status | 113 lines |
| 95.15 | Tue Jul 06 1993 17:24 | Customer agreed on DEMO-version | 2 lines |
| 95.16 | Tue Aug 24 1993 12:21 | Error on HASSLE port, clarification over Galway | 9 lines |
| 95.17 | Wed Mar 30 1994 13:47 | Reminder Refund release | 65 lines |
| 95.18 | Thu Apr 14 1994 14:45 | salesperson location change | 81 lines |
TOPIC | 96.0 | Wed Nov 11 1992 16:47 | CH/ETHZ Zuerich/ALPHA-OBERON | 135 lines |
| 96.1 | Wed Nov 11 1992 16:51 | Hale/Redner yes | 2 lines |
| 96.2 | Wed Nov 11 1992 16:55 | Exhibit A is missing | 3 lines |
TOPIC | 97.0 | Tue Nov 17 1992 09:23 | S/UNI Lund/JETNET | 231 lines |
| 97.8 | Thu Feb 04 1993 15:49 | AIP-S-02/97 issued February 4th, 1993 | 1 lines |
| 97.11 | Thu Mar 25 1993 11:42 | Order/Status info | 126 lines |
| 97.12 | Tue Aug 03 1993 15:01 | Refund release/Approval for DEMO on CD-ROM requested | 37 lines |
| 97.13 | Tue Aug 10 1993 17:17 | Software received, not clear if DEMO on tape | 4 lines |
| 97.14 | Wed Aug 11 1993 14:13 | Refund Release | 33 lines |
| 97.15 | Wed Aug 18 1993 18:22 | Tape is not marked, approval only f�r DEMO | 3 lines |
| 97.16 | Thu Aug 26 1993 12:43 | Approval for free Distribution | 1 lines |
| 97.17 | Thu Aug 26 1993 18:13 | Galway's controlling approval | 104 lines |
| 97.18 | Thu Aug 26 1993 18:14 | Answer from researcher | 45 lines |
TOPIC | 98.0 | Thu Nov 26 1992 10:53 | GB/Cambridge UNI/MULTIMEDIA | 125 lines |
| 98.1 | Thu Nov 26 1992 10:54 | Hale voting | 9 lines |
| 98.2 | Thu Nov 26 1992 10:54 | European submission | 12 lines |
| 98.4 | Tue Jan 12 1993 17:06 | Exhibit A missing - reclamation (Sponsor) | 31 lines |
TOPIC | 99.0 | D/UNI Karlsruhe/ODE |
| 99.6 | Fri Jan 08 1993 11:21 | Sales Rep responsibility | 2 lines |
| 99.11 | Thu May 13 1993 16:22 | UA...we need more information from Y O U | 48 lines |
| 99.12 | Tue May 25 1993 15:49 | UA - we need a definitiv Status info? | 75 lines |
| 99.13 | Thu May 27 1993 15:52 | ORDER/STATUS INFO/PORTING DAEDLINE PROB.OK | 37 lines |
| 99.15 | Wed Aug 11 1993 12:29 | Ported complete software as freeware for CD-ROM Production | 5 lines |
| 99.16 | Wed Aug 11 1993 15:16 | Refund Release | 33 lines |
| 99.17 | Wed Aug 18 1993 18:11 | separate approval not neccessary | 3 lines |
TOPIC | 100.0 | Tue Dec 01 1992 14:32 | D/UNI Armed Forces/NumSolv/GridGen | 303 lines |
| 100.6 | Thu Feb 25 1993 13:02 | AIP-D-16/100 issued Feb.25,1993 CLP DM 74.640,- | 1 lines |
| 100.7 | Thu Mar 11 1993 09:45 | Sales Rep | 2 lines |
| 100.8 | Tue May 18 1993 12:31 | UA... we need information from Y O U ! | 50 lines |
| 100.9 | Thu May 27 1993 15:54 | ORDER/STATUS INFO/DEMOVERSION TK50 OK | 78 lines |
| 100.10 | Wed Aug 18 1993 18:17 | Written Approval will follow | 2 lines |
TOPIC | 101.0 | CS/Bratislava,Comenius/8 ports |
| 101.16 | Wed Feb 17 1993 17:14 | AIP-CS-01/101 issued February 18th, 1993 | 2 lines |
| 101.17 | Thu Mar 25 1993 15:14 | No Mailcode available at the moment | 29 lines |
| 101.18 | Wed Mar 31 1993 13:15 | Please provide Status Info(evtl.System Change?) | 41 lines |
| 101.22 | Thu Apr 15 1993 14:03 | Addendum and Licence-Status required | 219 lines |
| 101.23 | Tue May 18 1993 15:37 | Addendum Request/Porting information to customer | 44 lines |
| 101.24 | Tue May 18 1993 15:39 | Addendum to contract AIP-CS-01/101 | 185 lines |
| 101.25 | Tue May 18 1993 15:47 | UA...we need more Information from Y O U! | 27 lines |
| 101.27 | Tue Jun 15 1993 14:06 | Status message Heinz Schrey | 163 lines |
| 101.30 | Tue Jun 29 1993 15:05 | Bob Jenefsky`s follow up eastern projects | 39 lines |
| 101.32 | Mon Aug 16 1993 16:19 | Refund release | 34 lines |
| 101.34 | Wed Mar 30 1994 13:31 | Reminder Refund release | 74 lines |
| 101.35 | Tue Apr 05 1994 15:24 | Refund Reminder failed message delivery, further try | 126 lines |
| 101.36 | Wed Apr 06 1994 13:02 | Reminder Refund to sales rep stand-in due to vacation | 191 lines |
| 101.37 | Thu Apr 07 1994 15:59 | Grant/Refund invoice reminder from DEIL - answer from CS | 30 lines |
| 101.38 | Thu Apr 14 1994 16:04 | Invoicing process seems to be ok | 101 lines |
TOPIC | 103.0 | Software received list, as of end of CY93. |
| 103.6 | Thu May 05 1994 16:56 | Update of "Software received list" as of May 1994 | 348 lines |