| Title: | DEChub/HUBwatch/PROBEwatch CONFERENCE |
| Notice: | Firmware -2, Doc -3, Power -4, HW kits -5, firm load -6&7 |
| Moderator: | NETCAD::COLELLA DT |
| Created: | Wed Nov 13 1991 |
| Last Modified: | Fri Jun 06 1997 |
| Last Successful Update: | Fri Jun 06 1997 |
| Number of topics: | 4455 |
| Total number of notes: | 16761 |
HI,
I have had a query regarding the following configuration. The customer
already has DB90s connected on the workgroup side of another DB90 and
it works fine at this point. He now wishes to add more DB90s to the
workgroup side and wants to know if it is a supported configuration.
The number of nodes total on the workgroup side of the bridge in question
is only about 37 so the 200 node limit is not a problem.
The DB90 manual states that having a DB90 on the workgroup side is not
supported but it doesnt state the reasons. Are there any Spanning Tree
problems in doing this.?
Any help much appreciated.
Thanks in advance,
Steve Cooper
Sydney CSC
--------------------------------------------------------------------------
Network Diagram
Note: W = workgroup side
B = backbone side
| W | W
+-------+ +-------+
| DB90 | | DB90 |
+-------+ +-------+
| B | B
| |
+---+ +---+
|FOT| |FOT|
+---+ +---+
| |
+------------+ +--------------+
| |
+-----------+
| Fibre Hub |
+-----------+
|
+---+
|FOT|
+---+
|
+-----+
|DEMPR|
+-----+
||||
+----------+||+-------------------------+
| |+-----------+ |
| B | | B | B
+---------+ | +---------+ +---------+
|Proposed | | |Proposed | |Proposed |
| DB90 | | | DB90 | | DB90 |
+---------+ | +---------+ +---------+
| W | | W | W
LAVC (5 nodes) | LAVC (5 nodes) LAVC (5 nodes)
| W
+-----+
| DB90|
+-----+
| B
+-----+
|DEMPR|
+-----+
|||||
rest of network incuding translans to other sites
N.B. a translan is the root bridge
| T.R | Title | User | Personal Name | Date | Lines |
|---|---|---|---|---|---|
| 647.1 | QUIVER::SLAWRENCE | Mon Jan 24 1994 11:09 | 10 | ||
That configuration looks like it will work.
Be very carefull that the configuration remains a tree with no
redundant connections (no two DECbridge90 workgroup ports can reach one
another).
The problem with configurations like this one is that it becomes
increasingly difficult to keep track of the number of systems on the
workgroup side of the 'highest' DB90; keep an eye on the number of
addresses in its workgroup.
| |||||