| 55.2 | WW9 WEEKLY PM CHECKSHEET | ASDG::POIRIER |  | Sat Aug 31 1996 16:44 | 31 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 8/31/96     SYSTEM RTC CODE: CMP-SCRUB.C1-7    TECH NAME: J.P.
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:___49_____
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:___40_____
  6.1.3  Check the Drip Pan for contamination           Completed:____X______
  6.1.4  Check all tubing/fittings for leaks		Completed:____X______
  6.1.5  Check all wafer transport belts		Completed:____X______
  6.1.6  Clean the Send module and Scrub modules  	Completed:____X______
  6.1.7  Check scrub brushes for contamination		Completed:____X______
  6.1.8  Check scrub brush height in both modules	Completed:____X______
  Comments:__________________________________________________________________
            BRUSH HEIGHTS:  OUTSIDE BRUSH STATION 
                            FRONT = .336"  REAR = .407"
        
                            INSIDE BRUSH STATION
                            FRONT = .334"  REAR = .365"
           
 | 
| 55.3 | CMP-SCRUB.C1-7 SHUTDOWN CHECKSHEET | FABSIX::R_POIRIER |  | Mon Sep 02 1996 01:57 | 20 | 
|  | 
                CMP-SCRUB.A1/.A1/.A3/.C1-7 SHUTDOWN CHECKSHEET
                ----------------------------------------------
                                                        Tech.       Date
                                                       -------     -------
  1.  Close main incoming DI Water valve to each
      system and open the DI Water return valve
      (UDR).  This will allow all incoming DI Water
      to flow to UDR.                                  ___B___     _9/1/96_
  2.  Remove all PVA scrub brushes and submerge
      in DI water. Label each brush with the
      tool name.                                       ___B___     _9/1/96_
  3.  Perform a complete wipe down and dry of
      all wet surfaces.                                ___B___     _9/1/96_
  4.  Power down each system.                          ___B___     _9/1/96_
  5.  Enter checksheet into notesfile.                 ___B___     _9/1/96_
 | 
| 55.4 | startup | FABSIX::B_FINN |  | Tue Sep 03 1996 19:19 | 24 | 
|  | 
                CMP-SCRUB.C1-7 STARTUP CHECKSHEET
                --------------------------------                
 DATE 9/3/96                                    TECH. NAME: A shift
  1.  Ensure that all necessary facilities are
      available and ready to use.                      ___X___
  2.  Power up system.                                 ___X___
  3.  Re-install PVA scrub brushes.                    ___X____
  4.  Open incoming DI Water Valve(s) 
      system.                                          ___X___
  5.  Close UDR valve at system.                       ___X___
  6.  Change RTC status to VERIFY and notify
      Operations that the systems are ready
      for MQC.                                         ___X___
                                      
 | 
| 55.5 | WEEKLY PM COMPLETED | FABSIX::B_FINN |  | Tue Sep 03 1996 19:33 | 30 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 9/3/96     SYSTEM RTC CODE: CMP-SCRUB.C1-7    TECH NAME: A SHIFT
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:___49_____
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:___40_____
  6.1.3  Check the Drip Pan for contamination           Completed:____X______
  6.1.4  Check all tubing/fittings for leaks		Completed:____X______
  6.1.5  Check all wafer transport belts		Completed:____X______
  6.1.6  Clean the Send module and Scrub modules  	Completed:____X______
  6.1.7  Check scrub brushes for contamination		Completed:____X______
  6.1.8  Check scrub brush height in both modules	Completed:____X______
  Comments:__________________________________________________________________
            BRUSH HEIGHTS:  OUTSIDE BRUSH STATION 
                            FRONT = 341  REAR = 407
                            INSIDE BRUSH STATION
                            FRONT = 334  REAR = 365
           
 | 
| 55.6 | WW 11 weekly p.m. | FABSIX::R_GEE |  | Wed Sep 11 1996 05:16 | 30 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 9/11/96     SYSTEM RTC CODE: CMP-SCRUB.C1-7    TECH NAME: A SHIFT
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:___50_____
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:___40_____
  6.1.3  Check the Drip Pan for contamination           Completed:____X______
  6.1.4  Check all tubing/fittings for leaks		Completed:____X______
  6.1.5  Check all wafer transport belts		Completed:____X______
  6.1.6  Clean the Send module and Scrub modules  	Completed:____X______
  6.1.7  Check scrub brushes for contamination		Completed:____X______
  6.1.8  Check scrub brush height in both modules	Completed:____X______
  Comments:__________________________________________________________________
            BRUSH HEIGHTS:  OUTSIDE BRUSH STATION 
                            FRONT = 435  REAR = 345
                            INSIDE BRUSH STATION
                            FRONT = 350  REAR = 375
           
 | 
| 55.7 | ww12 weekly pm | FABSIX::L_SHKOLNIKOV |  | Wed Sep 18 1996 04:59 | 29 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 9/18/96     SYSTEM RTC CODE: CMP-SCRUB.C1-7    TECH NAME: D SHIFT
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:__50__   
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:__42__   
  6.1.3  Check the Drip Pan for contamination           Completed:___X___
  6.1.4  Check all tubing/fittings for leaks		Completed:___X___
  6.1.5  Check all wafer transport belts		Completed:___X___
  6.1.6  Clean the Send module and Scrub modules  	Completed:___X___
  6.1.7  Check scrub brushes for contamination		Completed:___X___
  6.1.8  Check scrub brush height in both modules	Completed:___X___
  Comments: The brush heights has been changed since last week.
            The new numbers are listed below.
            BRUSH HEIGHTS:    O    I
                          R  345  375
                          F  443  375
           
 | 
| 55.8 | WW XIII - Weekly | SUBPAC::LANDRY |  | Mon Sep 23 1996 17:17 | 27 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 9/23/96     SYSTEM RTC CODE: CMP-SCRUB.C1-7    TECH NAME: A shift
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50   
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  41
  6.1.3  Check the Drip Pan for contamination           Completed:   X
  6.1.4  Check all tubing/fittings for leaks		Completed:   X
  6.1.5  Check all wafer transport belts		Completed:   X
  6.1.6  Clean the Send module and Scrub modules  	Completed:   X
  6.1.7  Check scrub brushes for contamination		Completed:   X
  6.1.8  Check scrub brush height in both modules	Completed:   X
  Comments:    
      	Brush Heights:    OB =  Front 443      IB =  Front 375
                                 Rear 345             Rear 375
           
 | 
| 55.9 | ww14 weekly pm | FABSIX::L_SHKOLNIKOV |  | Fri Oct 04 1996 05:01 | 28 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 10/04/96     SYSTEM RTC CODE: CMP-SCRUB.C1-7    TECH NAME: D shift
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50   
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  42
  6.1.3  Check the Drip Pan for contamination           Completed:   X **
  6.1.4  Check all tubing/fittings for leaks		Completed:   X
  6.1.5  Check all wafer transport belts		Completed:   X
  6.1.6  Clean the Send module and Scrub modules  	Completed:   X
  6.1.7  Check scrub brushes for contamination		Completed:   X
  6.1.8  Check scrub brush height in both modules	Completed:   X
  Comments:    
      	Brush Heights:       OB        IB
                     Rear    345      375
                     Front   445      375
**  A lot of wafer pieces was found in and around spin station. 
 | 
| 55.10 | Weekly Pm WW#15 complete | FABSIX::O_WHITFORD |  | Thu Oct 10 1996 04:23 | 28 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 10/10/96   SYSTEM RTC CODE: CMP-SCRUB.C1-7 TECH. NAME: D. Whitford
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50 PSI
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  42 PSI
  6.1.3  Check the Drip Pan for contamination           Completed:    DW
  6.1.4  Check all tubing/fittings for leaks		Completed:    DW
  6.1.5  Check all wafer transport belts		Completed:    DW
  6.1.6  Clean the Send module and Scrub modules  	Completed:    DW
  6.1.7  Check scrub brushes for contamination		Completed:    DW
  6.1.8  Check scrub brush height in both modules	Completed:    DW
  Comments:
          Brush heights:                   Front         Rear
                Outer brush station         .445         .345
                Inner brush station         .375         .375
 | 
| 55.11 | ww16 weekly pm. | FABSIX::L_SHKOLNIKOV |  | Tue Oct 15 1996 22:53 | 26 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 10/15/96     SYSTEM RTC CODE: CMP-SCRUB.C1-7    TECH NAME: D shift 
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50   
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  42
  6.1.3  Check the Drip Pan for contamination           Completed:   X   
  6.1.4  Check all tubing/fittings for leaks		Completed:   X
  6.1.5  Check all wafer transport belts		Completed:   X
  6.1.6  Clean the Send module and Scrub modules  	Completed:   X
  6.1.7  Check scrub brushes for contamination		Completed:   X
  6.1.8  Check scrub brush height in both modules	Completed:   X
  Comments:    
      	Brush Heights:       OB        IB
                     Rear    345      375
                     Front   445      375
 | 
| 55.12 | ww17 weekly pm. | FABSIX::L_SHKOLNIKOV |  | Wed Oct 23 1996 23:16 | 26 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 10/23/96     SYSTEM RTC CODE: CMP-SCRUB.C1-7    TECH NAME: D shift 
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50   
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  40
  6.1.3  Check the Drip Pan for contamination           Completed:   X   
  6.1.4  Check all tubing/fittings for leaks		Completed:   X
  6.1.5  Check all wafer transport belts		Completed:   X
  6.1.6  Clean the Send module and Scrub modules  	Completed:   X
  6.1.7  Check scrub brushes for contamination		Completed:   X
  6.1.8  Check scrub brush height in both modules	Completed:   X
  Comments:    
      	Brush Heights:       OB        IB
                     Rear    345      375
                     Front   445      375
 | 
| 55.13 | WW XVIII - Weekly Completed | SUBPAC::LANDRY |  | Sun Oct 27 1996 14:29 | 26 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 10/27/96     SYSTEM RTC CODE: CMP-SCRUB.C1-7    TECH NAME:   Landry 
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50   
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  39
  6.1.3  Check the Drip Pan for contamination           Completed:   X   
  6.1.4  Check all tubing/fittings for leaks		Completed:   X
  6.1.5  Check all wafer transport belts		Completed:   X
  6.1.6  Clean the Send module and Scrub modules  	Completed:   X
  6.1.7  Check scrub brushes for contamination		Completed:   X
  6.1.8  Check scrub brush height in both modules	Completed:   X
  Comments:    
      	Brush Heights:       OB        IB
                     Rear    345      375
                     Front   445      375
 | 
| 55.14 | WW 19 - Weekly completed | SUBPAC::LANDRY |  | Wed Nov 06 1996 19:13 | 26 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 11/06/96     SYSTEM RTC CODE: CMP-SCRUB.C1-7    TECH NAME: Gee/Landry 
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50   
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 29 / 28
  6.1.3  Check the Drip Pan for contamination           Completed:   X   
  6.1.4  Check all tubing/fittings for leaks		Completed:   X
  6.1.5  Check all wafer transport belts		Completed:   X
  6.1.6  Clean the Send module and Scrub modules  	Completed:   X
  6.1.7  Check scrub brushes for contamination		Completed:   X
  6.1.8  Check scrub brush height in both modules	Completed:   X
  Comments:    
      	Brush Heights:       OB        IB
                     Rear    345      375
                     Front   445      375
 | 
| 55.15 | WEEKLY PM COMPLETED FOR WW20 | SUBPAC::BJUBINVILLE | CMP-6 Equipment Engineering | Tue Nov 12 1996 21:00 | 27 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 11/12/96     SYSTEM RTC CODE: CMP-SCRUB.C1-7    TECH NAME: Jubinville
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50 BJ  
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 30/30 BJ
  6.1.3  Check the Drip Pan for contamination           Completed:   BJ  
  6.1.4  Check all tubing/fittings for leaks		Completed:   BJ
  6.1.5  Check all wafer transport belts		Completed:   BJ
  6.1.6  Clean the Send module and Scrub modules  	Completed:   BJ
  6.1.7  Check scrub brushes for contamination		Completed:   BJ
  6.1.8  Check scrub brush height in both modules	Completed:   BJ
  Comments:    
      	Brush Heights:       OB        IB
                     Rear    345      375
                     Front   445      375
                                   
 | 
| 55.16 | WEEKLY PM FOR WW21 COMPLETED | SUBPAC::BJUBINVILLE | CMP-6 Equipment Engineering | Wed Nov 20 1996 23:06 | 27 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 11/20/96     SYSTEM RTC CODE: CMP-SCRUB.C1-7    TECH NAME: Shkolnikov
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50 LS  
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 40/40 LS
  6.1.3  Check the Drip Pan for contamination           Completed: LS *  
  6.1.4  Check all tubing/fittings for leaks		Completed: LS
  6.1.5  Check all wafer transport belts		Completed: LS
  6.1.6  Clean the Send module and Scrub modules  	Completed: LS
  6.1.7  Check scrub brushes for contamination		Completed: LS
  6.1.8  Check scrub brush height in both modules	Completed: LS
  Comments:  * Found small puddle of water in drip pan under solenoid valves.  
      	Brush Heights:       OB        IB
                     Rear    345      375
                     Front   445      375
                                   
 | 
| 55.17 | ww22 weekly PM. | FABSIX::L_SHKOLNIKOV |  | Wed Nov 27 1996 04:32 | 26 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 11/27/96     SYSTEM RTC CODE: CMP-SCRUB.C1-7    TECH NAME: Leon      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50 LS  
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 40/40 LS
  6.1.3  Check the Drip Pan for contamination           Completed: LS    
  6.1.4  Check all tubing/fittings for leaks		Completed: LS
  6.1.5  Check all wafer transport belts		Completed: LS
  6.1.6  Clean the Send module and Scrub modules  	Completed: LS
  6.1.7  Check scrub brushes for contamination		Completed: LS
  6.1.8  Check scrub brush height in both modules	Completed: LS
  Comments: 
      	Brush Heights:       OB        IB
                     Rear    345      375
                     Front   445      375
                                   
 | 
| 55.18 | ww23 weekly PM. | FABSIX::L_SHKOLNIKOV |  | Thu Dec 05 1996 00:13 | 26 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 12/05/96     SYSTEM RTC CODE: CMP-SCRUB.C1-7    TECH NAME: Leon      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50 LS  
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 40/40 LS
  6.1.3  Check the Drip Pan for contamination           Completed: LS    
  6.1.4  Check all tubing/fittings for leaks		Completed: LS
  6.1.5  Check all wafer transport belts		Completed: LS
  6.1.6  Clean the Send module and Scrub modules  	Completed: LS
  6.1.7  Check scrub brushes for contamination		Completed: LS
  6.1.8  Check scrub brush height in both modules	Completed: LS
  Comments: 
      	Brush Heights:       OB        IB
                     Rear    345      375
                     Front   445      375
                                   
 | 
| 55.19 | ww24 weekly p.m. completed | FABSIX::R_GEE |  | Sun Dec 08 1996 13:40 | 26 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 12/08/96     SYSTEM RTC CODE: CMP-SCRUB.C1-7    TECH NAME: A shift  
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50   
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 40/40 
  6.1.3  Check the Drip Pan for contamination           Completed: TL
  6.1.4  Check all tubing/fittings for leaks		Completed: TL
  6.1.5  Check all wafer transport belts		Completed: BG
  6.1.6  Clean the Send module and Scrub modules  	Completed: BG
  6.1.7  Check scrub brushes for contamination		Completed: BG
  6.1.8  Check scrub brush height in both modules	Completed: TL
  Comments: 
      	Brush Heights:       OB        IB
                     Rear    345      375
                     Front   445      375
                                   
 | 
| 55.20 | cmp-scrub.c7 weekly PM | FABSIX::O_WHITFORD | Quticherwhinin' | Wed Dec 18 1996 22:20 | 33 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
                             <WW25>
 DATE: 12/18/96      SYSTEM RTC CODE:CMP-SCRUB.C7  TECH. NAME:  Dave Whitford
  6.1.1  Check the CDA pressure for 50 PSI           Pre-Adjust:  50 Whitford
  6.1.2  Check the D.I. Water pressure for 40 PSI    Pre-Adjust:  40 Whitford
  6.1.3  Check the Drip Pan for contamination           Completed:   Whitford
  6.1.4  Check all tubing/fittings for leaks		Completed:   Whitford
  6.1.5  Check all wafer transport belts		Completed:   Whitford
  6.1.6  Clean the Send module and Scrub modules  	Completed:   Whitford
  6.1.7  Check scrub brushes for contamination		Completed:   Whitford
  6.1.8  Check scrub brush height in both modules	Completed:   Whitford
  Comments: Outer brush station outer mic = .345
                                inner mic = .445
            Inner brush station outer mic = .375
                                inner mic = .375
PM complete
                                                                    
 | 
| 55.21 | ww 26 quarterly p.m. completed | FABSIX::R_GEE |  | Sun Dec 22 1996 16:40 | 37 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Quarterly Preventative Maintenance Check Sheet, Rev D
 DATE:12/22/96   SYSTEM RTC CODE: CMP-SCRUB.C1-7  TECH/SHIFT:  LANDRY / GEE
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 42
  6.1.3  Check the Drip Pan for contamination           Completed:  __X__       
  6.1.4  Check all tubing/fittings for leaks		Completed:  __X__
  6.1.5  Check all wafer transport belts		Completed:  __X__
  6.1.6  Clean the Send module and Scrub modules  	Completed:  __X__
  6.1.7  Check scrub brushes for contamination		Completed:  __X__
  6.1.8  Check scrub brush height in both modules	Completed:  __X__ 
  6.3.1  Check muffin fans for functionality		Completed:  __X__  
     
  6.3.2  Check motor drive belts for defects		Completed:  __X__  
    
  6.3.3  Check the robot knife for loose hardware	Completed:  __X__ 
  6.3.4  Check the spin station grippers		Completed:  __X__
  6.3.5  Check the motor speed output readings		Completed:  __X__  
     
  Comments: Brush heights     O    I                                  
                           R 345  375
                           F 445  375                                 
    
     
 | 
| 55.22 | cmp-scrub.c1-7 shutdown checksheet completed | FABSIX::R_GEE |  | Tue Dec 31 1996 16:03 | 23 | 
|  | 
                CMP-SCRUB.A1/.A2/.A3/.C1-7 SHUTDOWN CHECKSHEET  Tech: Tim Landry
                ----------------------------------------------        Bob Gee
                                                        Tech.       Date
                                                       -------     -------
  1.  Close main incoming DI Water valve(s) to each    Bob Gee     12/31/96
      system and open the DI Water return valve
      (UDR).  This will allow all incoming DI Water
      to flow to UDR.                                 
  2.  Remove all PVA scrub brushes and submerge        Tim Landry  12/31/96
      in a mixture of DI water and H2O2.  Label 
      each brush with the tool name and brush box
      location.
  3.  Perform a complete wipe down and dry of
      all wet surfaces.                                Bob Gee     12/31/96
  4.  Power down each system.                          Bob Gee     12/31/96
  5.  Enter checksheet into notesfile.                 Tim Landry  12/31/96
 | 
| 55.23 | WEEKLY PM COMPLETED FOR WW27 | SUBPAC::BJUBINVILLE | CMP-6 Equipment Engineering | Thu Jan 02 1997 22:01 | 30 | 
|  | 
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 1/2/97   SYSTEM RTC CODE: CMP-SCRUB.C1-7 TECH: Leon Shkolnikov (LS)
                                                      Brian Jubinville (BJ)
                                                      Brad Westphal (BW)
    
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:   50/LS
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:   42/BW
  6.1.3  Check the Drip Pan for contamination           Completed:     LS
  6.1.4  Check all tubing/fittings for leaks		Completed:     LS
  6.1.5  Check all wafer transport belts		Completed:     LS
  6.1.6  Clean the Send module and Scrub modules  	Completed:     LS
  6.1.7  Check scrub brushes for contamination		Completed:     BW
  6.1.8  Check scrub brush height in both modules	Completed:     BW
                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 445      375
                          Rear  345      375
  Comments:  
 | 
| 55.24 | WEEKLY PM COMPLETED FOR WW28 | SUBPAC::BJUBINVILLE | CMP-6 Equipment Engineering | Wed Jan 08 1997 05:43 | 29 | 
|  | 
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 1/8/97   SYSTEM RTC CODE: CMP-SCRUB.C1-7 TECH: Leon Shkolnikov (LS)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:   50/LS
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  * 30/LS
  6.1.3  Check the Drip Pan for contamination           Completed:     LS
  6.1.4  Check all tubing/fittings for leaks		Completed:     LS
  6.1.5  Check all wafer transport belts		Completed:     LS
  6.1.6  Clean the Send module and Scrub modules  	Completed:     LS
  6.1.7  Check scrub brushes for contamination		Completed:     LS
  6.1.8  Check scrub brush height in both modules	Completed:     LS
                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 445      375
                          Rear  345      375
  Comments:  6.1.2 - Engineer notified
 | 
| 55.25 | ww29 weekly pm completed. | FABSIX::L_SHKOLNIKOV |  | Fri Jan 17 1997 00:41 | 29 | 
|  | 
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 1/17/97   SYSTEM RTC CODE: CMP-SCRUB.C1-7 TECH: Leon Shkolnikov (LS)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:   50/LS
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  * 30/LS
  6.1.3  Check the Drip Pan for contamination           Completed:     LS
  6.1.4  Check all tubing/fittings for leaks		Completed:     LS
  6.1.5  Check all wafer transport belts		Completed:     LS
  6.1.6  Clean the Send module and Scrub modules  	Completed:     LS
  6.1.7  Check scrub brushes for contamination		Completed:     LS
  6.1.8  Check scrub brush height in both modules	Completed:     LS
                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 445      375
                          Rear  345      375
  Comments:  6.1.2 - Engineer notified
 | 
| 55.26 | WW30 weekly PM completed | FABSIX::B_WESTPHAL |  | Fri Jan 24 1997 16:26 | 33 | 
|  | 
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 24 JAN 97 SYSTEM RTC CODE: SCRUB-CMP.C1-7 TECH. NAME: Bradley J. Westphal
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:_49 BW____
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:_30_BW *__
  6.1.3  Check the Drip Pan for contamination           Completed:_BW________
  6.1.4  Check all tubing/fittings for leaks		Completed:_BW________
  6.1.5  Check all wafer transport belts		Completed:_BW________
  6.1.6  Clean the Send module and Scrub modules  	Completed:_BW________
  6.1.7  Check scrub brushes for contamination		Completed:_BW________
  6.1.8  Check scrub brush height in both modules	Completed:_BW________
                             Front    Back 
                        IBS   375      375
			OBS   470      370
  Comments:  * Found that the pressure was at only 30 PSI and that is all that
	       the room is being supplied with.  Informed the Engineer.
 | 
| 55.27 | WEEKLY PM FOR WW31 COMPLETED | SUBPAC::BJUBINVILLE | CMP-6 Equipment Engineering | Wed Jan 29 1997 21:09 | 30 | 
|  | 
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 1/29/97   SYSTEM RTC CODE: CMP-SCRUB.C1 TECH: Brian Jubinville (BJ)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:   50/BJ
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  * 30/BJ
  6.1.3  Check the Drip Pan for contamination           Completed:     BJ
  6.1.4  Check all tubing/fittings for leaks		Completed:     BJ
  6.1.5  Check all wafer transport belts		Completed:     BJ
  6.1.6  Clean the Send module and Scrub modules  	Completed:     BJ
  6.1.7  Check scrub brushes for contamination		Completed:     BJ
  6.1.8  Check scrub brush height in both modules	Completed:     BJ
                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 445      375
                          Rear  345      375
  Comments:  6.1.2 - Engineer notified
                                                                         
 | 
| 55.1 | CMP-SCRUB.C1 EE/PE PASSDOWNS | SUBPAC::BJUBINVILLE | CMP-6 Equipment Engineering | Wed Jan 29 1997 21:12 | 5 | 
|  | 
        THIS NOTE IS DESIGNATED FOR THE EQUIPMENT AND PROCESS
      ENGINEERING PASSDOWNS FOR:
    
                                         CMP-SCRUB.C1
 | 
| 55.28 | WW32 WEEKLY PM COMPLETED. | FABSIX::L_SHKOLNIKOV |  | Wed Feb 05 1997 06:02 | 30 | 
|  | 
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:02/05/97   SYSTEM RTC CODE: CMP-SCRUB.C1 TECH: Leon shkolnikov  (LS)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:   50/BJ
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  * 30/BJ
  6.1.3  Check the Drip Pan for contamination           Completed:     LS
  6.1.4  Check all tubing/fittings for leaks		Completed:     LS
  6.1.5  Check all wafer transport belts		Completed:     LS
  6.1.6  Clean the Send module and Scrub modules  	Completed:     LS
  6.1.7  Check scrub brushes for contamination		Completed:     LS
  6.1.8  Check scrub brush height in both modules	Completed:     LS
                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 345      375
                          Rear  445      375
  Comments:  6.1.2 - Engineer notified
                                                                         
 | 
| 55.29 | WW33 weekly pm. | FABSIX::L_SHKOLNIKOV |  | Thu Feb 13 1997 06:06 | 33 | 
|  | 
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:02/13/97   SYSTEM RTC CODE: CMP-SCRUB.C1 TECH: Leon shkolnikov  (LS)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:   50   
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  * 30   
  6.1.3  Check the Drip Pan for contamination           Completed:     LS
  6.1.4  Check all tubing/fittings for leaks		Completed:  ** LS
  6.1.5  Check all wafer transport belts		Completed:     LS
  6.1.6  Clean the Send module and Scrub modules  	Completed:     LS
  6.1.7  Check scrub brushes for contamination		Completed:     LS
  6.1.8  Check scrub brush height in both modules	Completed:     LS
                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 345      375
                          Rear  445      375
  Comments: * 6.1.2 - Engineer notified
           **                                                            
              6.1.4 - Outside brush station - Water coming out through
                      the motor shafts (front and rear). Will try to get
                      it fixed ASAP.
 | 
| 55.30 | ww34 weekly pm. | FABSIX::L_SHKOLNIKOV |  | Wed Feb 19 1997 22:22 | 30 | 
|  | 
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:02/19/97   SYSTEM RTC CODE: CMP-SCRUB.C1 TECH: Leon shkolnikov  (LS)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:    50   
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:    40   
  6.1.3  Check the Drip Pan for contamination           Completed:     LS
  6.1.4  Check all tubing/fittings for leaks		Completed:     LS
  6.1.5  Check all wafer transport belts		Completed:     LS
  6.1.6  Clean the Send module and Scrub modules  	Completed:     LS
  6.1.7  Check scrub brushes for contamination		Completed:     LS
  6.1.8  Check scrub brush height in both modules	Completed:     LS
                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 345      375
                          Rear  445      375
  Comments: Outside brush station, rear roller shaft has been replaced last
            week, no leaks so far.
 | 
| 55.31 | ww35 weekly pm. | FABSIX::L_SHKOLNIKOV |  | Thu Feb 27 1997 05:06 | 31 | 
|  | 
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:02/27/97   SYSTEM RTC CODE: CMP-SCRUB.C1 TECH: Leon shkolnikov  (LS)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:    50   
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:    30   
  6.1.3  Check the Drip Pan for contamination           Completed:     LS
  6.1.4  Check all tubing/fittings for leaks		Completed:     LS
  6.1.5  Check all wafer transport belts		Completed:     LS
  6.1.6  Clean the Send module and Scrub modules  	Completed:     LS
  6.1.7  Check scrub brushes for contamination		Completed:     LS
  6.1.8  Check scrub brush height in both modules	Completed:     LS
                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 345      375
                          Rear  445      375
  Comments:  EE has been notified that DI water pressure can't be 
             adjusted up to 40 psi.
                                                                        
 | 
| 55.32 | ww36 weekly pm completed. | FABSIX::L_SHKOLNIKOV | No more experiments with freedom | Tue Mar 04 1997 23:16 | 29 | 
|  |            
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:03/04/97   SYSTEM RTC CODE: CMP-SCRUB.C1 TECH: Leon shkolnikov  (LS)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:    50   
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:    40   
  6.1.3  Check the Drip Pan for contamination           Completed:     LS
  6.1.4  Check all tubing/fittings for leaks		Completed:     LS
  6.1.5  Check all wafer transport belts		Completed:     LS
  6.1.6  Clean the Send module and Scrub modules  	Completed:     LS
  6.1.7  Check scrub brushes for contamination		Completed:     LS
  6.1.8  Check scrub brush height in both modules	Completed:     LS
                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 345      375
                          Rear  445      375
  Comments:
 | 
| 55.33 | ww37 weekly pm | FABSIX::L_SHKOLNIKOV |  | Thu Mar 13 1997 22:54 | 29 | 
|  |            
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:03/13/97   SYSTEM RTC CODE:CMP-SCRUB.C1  TECH: Leon shkolnikov  (LS)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:    50   
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:    40   
  6.1.3  Check the Drip Pan for contamination           Completed:     LS
  6.1.4  Check all tubing/fittings for leaks		Completed:     LS
  6.1.5  Check all wafer transport belts		Completed:     LS
  6.1.6  Clean the Send module and Scrub modules  	Completed:     LS
  6.1.7  Check scrub brushes for contamination		Completed:     LS
  6.1.8  Check scrub brush height in both modules	Completed:     LS
                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 345      375
                          Rear  445      375
  Comments:
 | 
| 55.34 | ww38 weekly pm. | FABSIX::L_SHKOLNIKOV |  | Tue Mar 18 1997 21:34 | 29 | 
|  |            
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:03/18/97   SYSTEM RTC CODE:CMP-SCRUB.C1  TECH: Leon shkolnikov  (LS)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:    50   
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:    40   
  6.1.3  Check the Drip Pan for contamination           Completed:     LS
  6.1.4  Check all tubing/fittings for leaks		Completed:     LS
  6.1.5  Check all wafer transport belts		Completed:     LS
  6.1.6  Clean the Send module and Scrub modules  	Completed:     LS
  6.1.7  Check scrub brushes for contamination		Completed:     LS
  6.1.8  Check scrub brush height in both modules	Completed:     LS
                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 345      375
                          Rear  445      375
  Comments:
 | 
| 55.35 | SEMI-ANNUAL PM COMPLETED FOR WW39 | SUBPAC::BJUBINVILLE | CMP Equipment Engineering | Thu Mar 27 1997 06:55 | 96 | 
|  |            OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
            Semi-Annual Preventative Maintenance Check Sheet, Rev D
 DATE: 3/27/97   SYSTEM RTC CODE: CMP-SCRUB.C1  TECH. NAME: Dave Whitford (DW)
                                                         Brian Jubinville (BJ)
  6.1    Perform Weekly PM                              Completed: DW/BJ
                                                        
  6.3    Perform Quarterly PM                           Completed: DW/BJ
  6.4.1  Check all EMO's for functionality		Completed: DW
  6.4.2  Check all interlocks for functionality  	Completed: DW
  6.4.3  Check heat lamp housing/wiring for defects	Completed: DW
  6.4.4  Check the robot hardware/wiring for defects	Completed: DW
  6.4.5  Check the spindle bearings/bushings		Completed: DW
  6.4.6  Check the spin sta. rollers/bearings/bushings	Completed: DW
  6.4.7  Check the brush sta. drive bearings/bushings	Completed: DW
  6.4.8  Check the +5 VDC power supply			Pre-Adjust: +5.1 DW
							Post-Adjust: +5.1 DW
  6.4.9  Check the -12 VDC power supply			Pre-Adjust: -12.6 DW
  6.4.10 Check the +12 VDC power supply			Pre-Adjust: +12.4 DW
  6.4.11 Check the +24 VDC power supply			Pre-Adjust: +23.94 DW
							Post-Adjust: +24.2 DW
  6.4.12 Check the +48 VDC power supply			Pre-Adjust:  +48.4 DW
							Post-Adjust: +48.4 DW
           OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
             Quarterly Preventative Maintenance Check Sheet, Rev D
 DATE: 3/27/97   SYSTEM RTC CODE: CMP-SCRUB.C1  TECH. NAME: Dave Whitford (DW)
                                                         Brian Jubinville (BJ)
  6.1    Perform Weekly PM                              Completed: DW   
  6.3.1  Check muffin fans for functionality		Completed: DW
  6.3.2  Check motor drive belts for defects		Completed: DW
  6.3.3  Check the robot knife for loose hardware	Completed: DW
  6.3.4  Check the spin station grippers		Completed: DW
  6.3.5  Check the motor speed output readings		Completed: DW/BJ
  Comments:__________________________________________________________________
           __________________________________________________________________
           __________________________________________________________________
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 3/27/97   SYSTEM RTC CODE: CMP-SCRUB.C1  TECH. NAME: Dave Whitford (DW)
                                                         Brian Jubinville (BJ)
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 DW
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 32.5 * DW
  6.1.3  Check the Drip Pan for contamination           Completed:  DW
  6.1.4  Check all tubing/fittings for leaks		Completed: DW
  6.1.5  Check all wafer transport belts		Completed: DW
  6.1.6  Clean the Send module and Scrub modules  	Completed: DW
  6.1.7  Check scrub brushes for contamination		Completed: DW
  6.1.8  Check scrub brush height in both modules	Completed: BJ
=============================================================================
   6.1.2 - DI pressure below spec.  E.E. notified.... 
 | 
| 55.36 | WW40 Weekly PM Completed | FABSIX::R_POIRIER |  | Tue Apr 01 1997 01:22 | 32 | 
|  |            
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:04/01/97   SYSTEM RTC CODE:CMP-SCRUB.C1  TECH: Roger Poirier (RP)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:    50 RP
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:    32 RP   
  6.1.3  Check the Drip Pan for contamination           Completed:     RP
  6.1.4  Check all tubing/fittings for leaks		Completed:     RP
  6.1.5  Check all wafer transport belts		Completed:     RP
  6.1.6  Clean the Send module and Scrub modules  	Completed:     RP
  6.1.7  Check scrub brushes for contamination		Completed:     RP
  6.1.8  Check scrub brush height in both modules	Completed:     RP
                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 318      375
                          Rear  360      375
  Comments: 6.1.2 Water Pressure low. Engineer informed.
	    Found small puddle of water. Cleaned it up. Tightened
	    Sender spray connector. Engineer informed.
 | 
| 55.37 | WEEKLY PM FOR WW41 COMPLETED | SUBPAC::BJUBINVILLE | CMP Equipment Engineering | Thu Apr 10 1997 05:07 | 30 | 
|  |           
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:04/10/97   SYSTEM RTC CODE:CMP-SCRUB.C1  TECH: Brian Jubinville (BJ)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50 BJ
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: *  34 BJ    
  6.1.3  Check the Drip Pan for contamination           Completed: BJ    
  6.1.4  Check all tubing/fittings for leaks		Completed: BJ   
  6.1.5  Check all wafer transport belts		Completed: BJ   
  6.1.6  Clean the Send module and Scrub modules  	Completed: BJ   
  6.1.7  Check scrub brushes for contamination		Completed: BJ   
  6.1.8  Check scrub brush height in both modules	Completed: BJ
                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 335      375
                          Rear  395      390
  Comments: 6.1.2 Water Pressure low. Engineer informed.
                                            
 | 
| 55.38 | WEEKLY PM COMPLETED FOR WW42 | SUBPAC::BJUBINVILLE | CMP Equipment Engineering | Thu Apr 17 1997 04:33 | 28 | 
|  |           
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:04/17/97   SYSTEM RTC CODE:CMP-SCRUB.C1  TECH: Brian Jubinville (BJ)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50 BJ
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  40 BJ    
  6.1.3  Check the Drip Pan for contamination           Completed: BJ    
  6.1.4  Check all tubing/fittings for leaks		Completed: BJ   
  6.1.5  Check all wafer transport belts		Completed: BJ   
  6.1.6  Clean the Send module and Scrub modules  	Completed: BJ   
  6.1.7  Check scrub brushes for contamination		Completed: BJ   
  6.1.8  Check scrub brush height in both modules	Completed: BJ
                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 335      375
                          Rear  400      395
                                            
 | 
| 55.39 | WEEKLY PM FOR WW43 COMPLETED | SUBPAC::BJUBINVILLE | CMP Equipment Engineering | Wed Apr 23 1997 21:17 | 29 | 
|  |           
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:04/23/97   SYSTEM RTC CODE:CMP-SCRUB.C1  TECH: Brian Jubinville (BJ)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50 BJ
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  40 BJ    
  6.1.3  Check the Drip Pan for contamination           Completed: BJ    
  6.1.4  Check all tubing/fittings for leaks		Completed: BJ   
  6.1.5  Check all wafer transport belts		Completed: BJ   
  6.1.6  Clean the Send module and Scrub modules  	Completed: BJ   
  6.1.7  Check scrub brushes for contamination		Completed: BJ   
  6.1.8  Check scrub brush height in both modules	Completed: BJ
                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 335      375
                          Rear  400      390
                                            
                                            
 | 
| 55.40 | ww44 weekly pm completed. | FABSIX::L_SHKOLNIKOV |  | Tue Apr 29 1997 21:41 | 32 | 
|  |               
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:04/29/97   SYSTEM RTC CODE:CMP-SCRUB.C1  TECH: Leon Shkolnikov  (ls)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50 ls
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  40 ls    
  6.1.3  Check the Drip Pan for contamination           Completed: ls    
  6.1.4  Check all tubing/fittings for leaks		Completed: ls*  
  6.1.5  Check all wafer transport belts		Completed: ls   
  6.1.6  Clean the Send module and Scrub modules  	Completed: ls   
  6.1.7  Check scrub brushes for contamination		Completed: ls   
  6.1.8  Check scrub brush height in both modules	Completed: ls
                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 335      375
                          Rear  400      390
                                            
                                            
  * Found small amount of DI water under the rear shaft of the outside
    brush station. Will notify EE in the morning to schedule down time for
    repair.
 | 
| 55.41 | Weekly PM completed for WW45 | SUBPAC::BJUBINVILLE | CMP Equipment Engineering | Wed May 07 1997 22:43 | 37 | 
|  |               
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:05/7/97   SYSTEM RTC CODE:CMP-SCRUB.C1  TECH: Brian Jubinville (BJ)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50 BJ
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  40 BJ   
  6.1.3  Check the Drip Pan for contamination           Completed: BJ      
  6.1.4  Check all tubing/fittings for leaks		Completed: BJ     
  6.1.5  Check all wafer transport belts		Completed: BJ     
  6.1.6  Clean the Send module and Scrub modules  	Completed: BJ     
  6.1.7  Check scrub brushes for contamination		Completed: BJ     
  6.1.8  Check scrub brush height in both modules	Completed: * BJ *   
                                 OB      IB
                                ----    ----
               were at:   Front 335      390
                          Rear  400      440
                                            
               now back   Front 335      375
               at:        Rear  400      390
                                                  
      * alot of wafer debris found in the spin station.  It was
        was definetly an un-document crash in the spin station.
        All of the wafer pieces were removed and spin are cleaned.
    
      
     * this checksheet was forwarded to Jim T., E.E.
 | 
| 55.42 | Weekly pm completed for ww46 | FABSIX::R_GEE |  | Tue May 13 1997 09:24 | 29 | 
|  |               
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:05/13/97   SYSTEM RTC CODE:CMP-SCRUB.C1  TECH: Bob Gee (BG)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50 BG
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  40 BG   
  6.1.3  Check the Drip Pan for contamination           Completed: BG
  6.1.4  Check all tubing/fittings for leaks		Completed: BG     
  6.1.5  Check all wafer transport belts		Completed: BG     
  6.1.6  Clean the Send module and Scrub modules  	Completed: BG     
  6.1.7  Check scrub brushes for contamination		Completed: BG     
  6.1.8  Check scrub brush height in both modules	Completed: BG   
                                 OB      IB
                                ----    ----
                          Front 335      395
                          Rear  400      390
                                                  
 
 | 
| 55.43 | ww47 weekly pm. | FABSIX::L_SHKOLNIKOV |  | Wed May 21 1997 22:58 | 30 | 
|  |               
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:05/21/97   SYSTEM RTC CODE:CMP-SCRUB.C1  TECH: Leon Shkolnikov  ls
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50 ls
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  40 ls   
  6.1.3  Check the Drip Pan for contamination           Completed: ls
  6.1.4  Check all tubing/fittings for leaks		Completed: ls     
  6.1.5  Check all wafer transport belts		Completed: ls     
  6.1.6  Clean the Send module and Scrub modules  	Completed: ls     
  6.1.7  Check scrub brushes for contamination		Completed: ls     
  6.1.8  Check scrub brush height in both modules	Completed: ls   
                                 OB      IB
                                ----    ----
                          Front 335      395
                          Rear  400      390
                                                  
 
                                 
 | 
| 55.44 | WW48 weekly PM completed | FABSIX::R_GEE |  | Tue May 27 1997 13:09 | 29 | 
|  |             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:05/27/97   SYSTEM RTC CODE:CMP-SCRUB.C1  TECH: Bob Gee  bg
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50 bg
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  40 bg   
  6.1.3  Check the Drip Pan for contamination           Completed: bg
  6.1.4  Check all tubing/fittings for leaks		Completed: bg     
  6.1.5  Check all wafer transport belts		Completed: bg     
  6.1.6  Clean the Send module and Scrub modules  	Completed: bg     
  6.1.7  Check scrub brushes for contamination		Completed: bg     
  6.1.8  Check scrub brush height in both modules	Completed: bg   
                                 OB      IB
                                ----    ----
                          Front 337      396
                          Rear  400      390
                                                  
 
                                 
 | 
| 55.45 | scruber c1 start up | FABSIX::B_FINN |  | Tue May 27 1997 18:38 | 26 | 
|  | 
           CMP-SCRUB.A1/.A2/.A3/.C1-7 STARTUP CHECKSHEET FOR 5/27/97
           ---------------------------------------------------------
                                                        Tech.       Date
                                                       -------     -------
  1.  Ensure that all necessary facilities are
      available and ready to use.                       BF/TL      5/27/97
  2.  Power up each system.                             BF/TL	   5/27/97
  3.  Re-install PVA scrub brushes.                     BF/TL	   5/27/97     
  4.  Open incoming DI Water Valve(s) to each
      system.                                           BF/TL	   5/27/97
  5.  Close UDR valve at each system.                   BF/TL	   5/27/97
  6.  Cycle a minimum of 25 wafers through each
      tool to verify proper operation.                  BF/TL	   5/27/97
  7.  Notify Operations that the systems are ready
      for MQC.                                          BF/TL	   5/27/97
  8.  Enter checksheet into notesfile.                  BF/TL	   5/27/97
 | 
| 55.46 | WW49 WEEKLY P.M. COMPLETED | FABSIX::R_GEE |  | Tue Jun 03 1997 18:18 | 29 | 
|  |             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:06/03/97   SYSTEM RTC CODE:CMP-SCRUB.C1  TECH: Bob Gee  bg
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50 bg
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  40 bg   
  6.1.3  Check the Drip Pan for contamination           Completed: bg
  6.1.4  Check all tubing/fittings for leaks		Completed: bg     
  6.1.5  Check all wafer transport belts		Completed: bg     
  6.1.6  Clean the Send module and Scrub modules  	Completed: bg     
  6.1.7  Check scrub brushes for contamination		Completed: bg     
  6.1.8  Check scrub brush height in both modules	Completed: bg   
                                 OB      IB
                                ----    ----
                          Front 337      396
                          Rear  400      390
                                                  
 
                                 
 |