| 50.1 | Weekly PM Checksheet Template | SUBPAC::BJUBINVILLE | CMP-6 Equipment Engineering | Tue Jun 11 1996 23:04 | 26 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:__________   SYSTEM RTC CODE:__________  TECH. NAME:__________________
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:__________
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:__________
  6.1.3  Check the Drip Pan for contamination           Completed:___________
  6.1.4  Check all tubing/fittings for leaks		Completed:___________
  6.1.5  Check all wafer transport belts		Completed:___________
  6.1.6  Clean the Send module and Scrub modules  	Completed:___________
  6.1.7  Check scrub brushes for contamination		Completed:___________
  6.1.8  Check scrub brush height in both modules	Completed:___________
  Comments:__________________________________________________________________
           __________________________________________________________________
           __________________________________________________________________
 | 
| 50.2 | Quarterly PM Checksheet Template | SUBPAC::BJUBINVILLE | CMP-6 Equipment Engineering | Tue Jun 11 1996 23:06 | 36 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Quarterly Preventative Maintenance Check Sheet, Rev D
 DATE:__________   SYSTEM RTC CODE:__________  TECH. NAME:__________________
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:__________
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:__________
  6.1.3  Check the Drip Pan for contamination           Completed:___________
  6.1.4  Check all tubing/fittings for leaks		Completed:___________
  6.1.5  Check all wafer transport belts		Completed:___________
  6.1.6  Clean the Send module and Scrub modules  	Completed:___________
  6.1.7  Check scrub brushes for contamination		Completed:___________
  6.1.8  Check scrub brush height in both modules	Completed:___________
  6.3.1  Check muffin fans for functionality		Completed:___________
  6.3.2  Check motor drive belts for defects		Completed:___________
  6.3.3  Check the robot knife for loose hardware	Completed:___________
  6.3.4  Check the spin station grippers		Completed:___________
  6.3.5  Check the motor speed output readings		Completed:___________
  Comments:__________________________________________________________________
           __________________________________________________________________
           __________________________________________________________________
 | 
| 50.3 | Semi-Annual PM Checksheet Template | SUBPAC::BJUBINVILLE | CMP-6 Equipment Engineering | Tue Jun 11 1996 23:06 | 66 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
         Semi-Annual Preventative Maintenance Check Sheet, Rev D
 DATE:__________   SYSTEM RTC CODE:__________  TECH. NAME:__________________
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:__________
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:__________
  6.1.3  Check the Drip Pan for contamination           Completed:___________
  6.1.4  Check all tubing/fittings for leaks		Completed:___________
  6.1.5  Check all wafer transport belts		Completed:___________
  6.1.6  Clean the Send module and Scrub modules  	Completed:___________
  6.1.7  Check scrub brushes for contamination		Completed:___________
  6.1.8  Check scrub brush height in both modules	Completed:___________
  6.3.1  Check muffin fans for functionality		Completed:___________
  6.3.2  Check motor drive belts for defects		Completed:___________
  6.3.3  Check the robot knife for loose hardware	Completed:___________
  6.3.4  Check the spin station grippers		Completed:___________
  6.3.5  Check the motor speed output readings		Completed:___________
  6.4.1  Check all EMO's for functionality		Completed:___________
  6.4.2  Check all interlocks for functionality  	Completed:___________
  6.4.3  Check heat lamp housing/wiring for defects	Completed:___________
  6.4.4  Check the robot hardware/wiring for defects	Completed:___________
  6.4.5  Check the spindle bearings/bushings		Completed:___________
  6.4.6  Check the spin sta. rollers/bearings/bushings	Completed:___________
  6.4.7  Check the brush sta. drive bearings/bushings	Completed:___________
  6.4.8  Check the +5 VDC power supply			Pre-Adjust:__________
							Post-Adjust:_________
  6.4.9  Check the -12 VDC power supply			Pre-Adjust:__________
  6.4.10 Check the +12 VDC power supply			Pre-Adjust:__________
  6.4.11 Check the +24 VDC power supply			Pre-Adjust:__________
							Post-Adjust:_________
  6.4.12 Check the +48 VDC power supply			Pre-Adjust:__________
							Post-Adjust:_________
  Comments:__________________________________________________________________
           __________________________________________________________________
           __________________________________________________________________
 | 
| 50.4 | WW5 WEEKLY PM | FABSIX::L_SHKOLNIKOV |  | Wed Jul 31 1996 23:20 | 24 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:07/31/96    SYSTEM RTC CODE:CMP_SCRUB.B3  TECH. NAME:  D shift          
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:_50_ 
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:_34_
  6.1.3  Check the Drip Pan for contamination           Completed:__X__
  6.1.4  Check all tubing/fittings for leaks		Completed:__X__
  6.1.5  Check all wafer transport belts		Completed:__X__
  6.1.6  Clean the Send module and Scrub modules  	Completed:__X__
  6.1.7  Check scrub brushes for contamination		Completed:__X__
  6.1.8  Check scrub brush height in both modules	Completed:__X__
  Comments: BRUSH HEIGHTS    OB   IB
                          R  448  505
                          F  440  473
 | 
| 50.5 | WW06 Weekly PM | FABSIX::R_POIRIER |  | Mon Aug 05 1996 04:10 | 25 | 
|  | --------------------------------------------------------------------------------
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:08/05/96     SYSTEM RTC CODE:CMP_SCRUB.B3  TECH. NAME:  B shift          
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:_50_ 
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:_34_
  6.1.3  Check the Drip Pan for contamination           Completed:__X__
  6.1.4  Check all tubing/fittings for leaks		Completed:__X__
  6.1.5  Check all wafer transport belts		Completed:__X__
  6.1.6  Clean the Send module and Scrub modules  	Completed:__X__
  6.1.7  Check scrub brushes for contamination		Completed:__X__
  6.1.8  Check scrub brush height in both modules	Completed:__X__
  Comments: BRUSH HEIGHTS    OB   IB
                          R  448  505
                          F  440  473
 | 
| 50.6 | WW VII - Weekly version | SUBPAC::LANDRY |  | Sun Aug 11 1996 13:04 | 25 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:  08/11/96     SYSTEM RTC CODE: CMP_SCRUB.B3   TECH NAME:  A shift
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50 
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  33
  6.1.3  Check the Drip Pan for contamination           Completed:   X
  6.1.4  Check all tubing/fittings for leaks		Completed:   X
  6.1.5  Check all wafer transport belts		Completed:   X
  6.1.6  Clean the Send module and Scrub modules  	Completed:   X
  6.1.7  Check scrub brushes for contamination		Completed:   X
  6.1.8  Check scrub brush height in both modules	Completed:   X
  Comments: BRUSH HEIGHTS    OB   IB
                          R  435  487
                          F  440  473
    
 | 
| 50.7 | QUARTERLY PM FOR WW8 COMPLETED. | FABSIX::L_SHKOLNIKOV |  | Fri Aug 23 1996 07:18 | 39 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Quarterly Preventative Maintenance Check Sheet, Rev D
 DATE: 8/23/96   SYSTEM RTC CODE: CMP-SCRUB.A3  TECH/SHIFT: D
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 32   
  6.1.3  Check the Drip Pan for contamination           Completed:  __X__       
  6.1.4  Check all tubing/fittings for leaks		Completed:  __X__
  6.1.5  Check all wafer transport belts		Completed:  __X__
  6.1.6  Clean the Send module and Scrub modules  	Completed:  __X__
  6.1.7  Check scrub brushes for contamination		Completed:  __X__
  6.1.8  Check scrub brush height in both modules	Completed:  __X__ 
  6.3.1  Check muffin fans for functionality		Completed:  __X__  
     
  6.3.2  Check motor drive belts for defects		Completed:  __X__  
    
  6.3.3  Check the robot knife for loose hardware	Completed:  __X__ 
  6.3.4  Check the spin station grippers		Completed:  __X__
  6.3.5  Check the motor speed output readings		Completed:  __X__  
     
  Comments: Brush heights     O    I                                  
                           R 435  487
                           F 440  473                                 
    
            INSIDE BRUSH ST. FRONT LOWER ROLLER ARM BROKEN.WILL REPLACE IT
            TONIGHT.
 | 
| 50.8 | WW IX - Weekly version | SUBPAC::LANDRY |  | Sun Aug 25 1996 13:05 | 26 | 
|  |          OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 8/25/96      SYSTEM RTC CODE: CMP-SCRUB.A3    TECH. NAME: A shift
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  32
  6.1.3  Check the Drip Pan for contamination           Completed:   X
  6.1.4  Check all tubing/fittings for leaks		Completed:   X
  6.1.5  Check all wafer transport belts		Completed:   X
  6.1.6  Clean the Send module and Scrub modules  	Completed:   X
  6.1.7  Check scrub brushes for contamination		Completed:   X
  6.1.8  Check scrub brush height in both modules	Completed:   X
  Comments:  Found a puddle on frame underneath IB station.
                                 OB      IB
      	   Brush Heights: Front  435     473
                          Rear   435     487
 | 
| 50.9 | CMP-SCRUB.A3 SHUTDOWN CHECKSHEET | FABSIX::R_POIRIER |  | Mon Sep 02 1996 01:57 | 20 | 
|  | 
                CMP-SCRUB.A1/.A1/.A3/.C1-7 SHUTDOWN CHECKSHEET
                ----------------------------------------------
                                                        Tech.       Date
                                                       -------     -------
  1.  Close main incoming DI Water valve to each
      system and open the DI Water return valve
      (UDR).  This will allow all incoming DI Water
      to flow to UDR.                                  ___B___     _9/1/96_
  2.  Remove all PVA scrub brushes and submerge
      in DI water. Label each brush with the
      tool name.                                       ___B___     _9/1/96_
  3.  Perform a complete wipe down and dry of
      all wet surfaces.                                ___B___     _9/1/96_
  4.  Power down each system.                          ___B___     _9/1/96_
  5.  Enter checksheet into notesfile.                 ___B___     _9/1/96_
 | 
| 50.10 |  | FABSIX::B_FINN |  | Tue Sep 03 1996 19:18 | 24 | 
|  | 
                CMP-SCRUB.A3 STARTUP CHECKSHEET
                --------------------------------                
 DATE 9/3/96                                    TECH. NAME: A shift
  1.  Ensure that all necessary facilities are
      available and ready to use.                      ___X___
  2.  Power up system.                                 ___X___
  3.  Re-install PVA scrub brushes.                    ___X____
  4.  Open incoming DI Water Valve(s) 
      system.                                          ___X___
  5.  Close UDR valve at system.                       ___X___
  6.  Change RTC status to VERIFY and notify
      Operations that the systems are ready
      for MQC.                                         ___X___
                                      
 | 
| 50.11 | WW X - Weekly version | SUBPAC::LANDRY |  | Tue Sep 03 1996 19:29 | 25 | 
|  |          OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 9/3/96      SYSTEM RTC CODE: CMP-SCRUB.A3    TECH. NAME: A shift
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  30
  6.1.3  Check the Drip Pan for contamination           Completed:   X
  6.1.4  Check all tubing/fittings for leaks		Completed:   X
  6.1.5  Check all wafer transport belts		Completed:   X
  6.1.6  Clean the Send module and Scrub modules  	Completed:   X
  6.1.7  Check scrub brushes for contamination		Completed:   X
  6.1.8  Check scrub brush height in both modules	Completed:   X
  Comments:  
                                 OB      IB
      	   Brush Heights: Front  440     473
                          Rear   435     487
 | 
| 50.12 | WW XI - Weekly | SUBPAC::LANDRY |  | Sun Sep 08 1996 17:21 | 25 | 
|  |          OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 9/8/96      SYSTEM RTC CODE: CMP-SCRUB.A3    TECH. NAME: A shift
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  32
  6.1.3  Check the Drip Pan for contamination           Completed:   X
  6.1.4  Check all tubing/fittings for leaks		Completed:   X
  6.1.5  Check all wafer transport belts		Completed:   X
  6.1.6  Clean the Send module and Scrub modules  	Completed:   X
  6.1.7  Check scrub brushes for contamination		Completed:   X
  6.1.8  Check scrub brush height in both modules	Completed:   X
  Comments:  
                                 OB      IB
      	   Brush Heights: Front  440     473
                          Rear   435     487
 | 
| 50.13 | Scrub .A3 Weekly PM complete | FABSIX::O_WHITFORD |  | Wed Sep 18 1996 23:48 | 29 | 
|  |                                     -< CMP >-
================================================================================
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 9/18/96         SYSTEM RTC CODE: CMP-SCRUB.A3  TECH. NAME:Dave Whitford
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 32
  6.1.3  Check the Drip Pan for contamination           Completed:  DW 
  6.1.4  Check all tubing/fittings for leaks		Completed:  DW
  6.1.5  Check all wafer transport belts		Completed:  DW
  6.1.6  Clean the Send module and Scrub modules  	Completed:  DW
  6.1.7  Check scrub brushes for contamination		Completed:  DW
  6.1.8  Check scrub brush height in both modules	Completed:  DW
  Comments: Outer Brush height     .440"
              
            Inner Brush height     .473"
P.M. Copmplete    
    
 | 
| 50.14 | WW XIII - Weekly | SUBPAC::LANDRY |  | Mon Sep 23 1996 16:26 | 24 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 9/23/96         SYSTEM RTC CODE: CMP-SCRUB.A3  TECH. NAME: A shift
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 30
  6.1.3  Check the Drip Pan for contamination           Completed:  X 
  6.1.4  Check all tubing/fittings for leaks		Completed:  X
  6.1.5  Check all wafer transport belts		Completed:  X
  6.1.6  Clean the Send module and Scrub modules  	Completed:  X
  6.1.7  Check scrub brushes for contamination		Completed:  X
  6.1.8  Check scrub brush height in both modules	Completed:  X
  Comments: 	OB =  Front  440	IB =  Front 473
                       Rear  435               Rear 487
    
 | 
| 50.15 | Weekly PM completed for WW14 | FABSIX::B_JUBINVILLE |  | Fri Oct 04 1996 05:17 | 33 | 
|  |     
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 10/3/96   SYSTEM RTC CODE: CMP-SCRUB.A3    TECH. NAME: D. Whitford
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50 PSI
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  27 PSI
  6.1.3  Check the Drip Pan for contamination           Completed:    DW
  6.1.4  Check all tubing/fittings for leaks		Completed:    DW
  6.1.5  Check all wafer transport belts		Completed:    DW
  6.1.6  Clean the Send module and Scrub modules  	Completed:    DW
                                             
  6.1.7  Check scrub brushes for contamination		Completed:    DW 
  6.1.8  Check scrub brush height in both modules	Completed:    DW
  Comments: Outer Brush Station Brush height  F-440     R-435
            Inner Brush Station brush height  F-473     R-487
           Incoming DI supply is @ 13 PSI lower than spec.  Re-filled
           gauge gaurd and PSI went to 37 PSI
           __________________________________________________________________
           __________________________________________________________________
Weekly PM complete              Dave Whitford
 | 
| 50.16 | WW XV - Weekly completed | SUBPAC::LANDRY |  | Wed Oct 09 1996 10:55 | 27 | 
|  |     
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 10/9/96   SYSTEM RTC CODE: CMP-SCRUB.A3    TECH. NAME: A shift
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  35
  6.1.3  Check the Drip Pan for contamination           Completed:    X
  6.1.4  Check all tubing/fittings for leaks		Completed:    X
  6.1.5  Check all wafer transport belts		Completed:    X
  6.1.6  Clean the Send module and Scrub modules  	Completed:    X
                                             
  6.1.7  Check scrub brushes for contamination		Completed:    X
  6.1.8  Check scrub brush height in both modules	Completed:    X
  Comments: 
      			OB	IB
      		Rear   435	487
      		Front  440	473
 | 
| 50.17 | WW 16 weekly p.m. completed | FABSIX::R_GEE |  | Mon Oct 14 1996 17:35 | 27 | 
|  |     
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 10/14/96   SYSTEM RTC CODE: CMP-SCRUB.A3    TECH. NAME: A shift
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  35
  6.1.3  Check the Drip Pan for contamination           Completed:    X
  6.1.4  Check all tubing/fittings for leaks		Completed:    X
  6.1.5  Check all wafer transport belts		Completed:    X
  6.1.6  Clean the Send module and Scrub modules  	Completed:    X
                                             
  6.1.7  Check scrub brushes for contamination		Completed:    X
  6.1.8  Check scrub brush height in both modules	Completed:    X
  Comments: 
      			OB	IB
      		Rear   435	487
      		Front  440	473
 | 
| 50.18 | WW XVII - Weekly completed | SUBPAC::LANDRY |  | Sun Oct 20 1996 17:19 | 27 | 
|  |     
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 10/20/96   SYSTEM RTC CODE: CMP-SCRUB.A3    TECH. NAME: Gee / Landry
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  34
  6.1.3  Check the Drip Pan for contamination           Completed:    X
  6.1.4  Check all tubing/fittings for leaks		Completed:    X
  6.1.5  Check all wafer transport belts		Completed:    X
  6.1.6  Clean the Send module and Scrub modules  	Completed:    X
                                             
  6.1.7  Check scrub brushes for contamination		Completed:    X
  6.1.8  Check scrub brush height in both modules	Completed:    X
  Comments: 
      			OB	IB
      		Rear   435	487
      		Front  440	473
 | 
| 50.19 | WW XVIII - Weekly Completed | SUBPAC::LANDRY |  | Sun Oct 27 1996 10:16 | 26 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 10/27/96   SYSTEM RTC CODE: CMP-SCRUB.A3    TECH. NAME:  Landry
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  35
  6.1.3  Check the Drip Pan for contamination           Completed:    X
  6.1.4  Check all tubing/fittings for leaks		Completed:    X
  6.1.5  Check all wafer transport belts		Completed:    X
  6.1.6  Clean the Send module and Scrub modules  	Completed:    X
                                             
  6.1.7  Check scrub brushes for contamination		Completed:    X
  6.1.8  Check scrub brush height in both modules	Completed:    X
  Comments: 
      			OB	IB
      		Rear   435	487
      		Front  440	473
 | 
| 50.20 | WW 19 - Weekly completed | SUBPAC::LANDRY |  | Tue Nov 05 1996 13:09 | 26 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 11/5/96   SYSTEM RTC CODE: CMP-SCRUB.A3    TECH. NAME: Gee / Landry
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  34
  6.1.3  Check the Drip Pan for contamination           Completed:    X
  6.1.4  Check all tubing/fittings for leaks		Completed:    X
  6.1.5  Check all wafer transport belts		Completed:    X
  6.1.6  Clean the Send module and Scrub modules  	Completed:    X
                                             
  6.1.7  Check scrub brushes for contamination		Completed:    X
  6.1.8  Check scrub brush height in both modules	Completed:    X
  Comments: 
      			OB	IB
      		Rear   435	487
      		Front  440	473
 | 
| 50.21 | WEEKLY PM FOR WW20 COMPLETED | SUBPAC::BJUBINVILLE | CMP-6 Equipment Engineering | Tue Nov 12 1996 21:23 | 31 | 
|  | 
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 11/12/96   SYSTEM RTC CODE: CMP-SCRUB.A3   TECH. NAME: Jubinville BJ
          
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  34/34 BJ
  6.1.3  Check the Drip Pan for contamination           Completed:   BJ
  6.1.4  Check all tubing/fittings for leaks		Completed:   BJ
  6.1.5  Check all wafer transport belts		Completed:   BJ
  6.1.6  Clean the Send module and Scrub modules  	Completed:   BJ
  6.1.7  Check scrub brushes for contamination		Completed:   BJ
  6.1.8  Check scrub brush height in both modules	Completed:   BJ
  Comments:	    
                                  OB      IB
      	   Brush Heights: Front   440     473
                          Rear    435     487
     BRUSHES CHANGED ON 10/21 HENCE THE DIFFERENCE IN BRUSH
     HEIGHTS FROM LAST WEEKS WEEKLY PM. 
           ----------------------------------
 | 
| 50.22 | SEMI PM WW21 | FABSIX::M_RIDLON | Eliminate the oblivious | Wed Nov 20 1996 01:08 | 91 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 11/20/96  SYSTEM RTC CODE: CMP-SCRUB.A3  TECH. NAME: R.Poirier, Ridlon
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 43
  6.1.3  Check the Drip Pan for contamination           Completed:  XX
  6.1.4  Check all tubing/fittings for leaks		Completed:  XX
  6.1.5  Check all wafer transport belts		Completed:  XX
  6.1.6  Clean the Send module and Scrub modules  	Completed:  XX
  6.1.7  Check scrub brushes for contamination		Completed:  XX
  6.1.8  Check scrub brush height in both modules	Completed: SEE BELOW
  Comments: IF = 473     IB = 487
            OF = 440     OB = 425
           __________________________________________________________________
           __________________________________________________________________
           OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
             Quarterly Preventative Maintenance Check Sheet, Rev D
 
  6.1    Perform Weekly PM                              Completed:  XX
  6.3.1  Check muffin fans for functionality		Completed:  XX
  6.3.2  Check motor drive belts for defects		Completed:  XX
  6.3.3  Check the robot knife for loose hardware	Completed:  XX
  6.3.4  Check the spin station grippers		Completed:  XX
  6.3.5  Check the motor speed output readings		Completed:  XX
  Comments:__________________________________________________________________
           __________________________________________________________________
           __________________________________________________________________
           OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
            Semi-Annual Preventative Maintenance Check Sheet, Rev D
  6.1    Perform Weekly PM                              Completed:  XX
                                                        
  6.3    Perform Quarterly PM                           Completed:  XX
  6.4.1  Check all EMO's for functionality		Completed:  XX
  6.4.2  Check all interlocks for functionality  	Completed:  XX
  6.4.3  Check heat lamp housing/wiring for defects	Completed:  XX
  6.4.4  Check the robot hardware/wiring for defects	Completed:  XX
  6.4.5  Check the spindle bearings/bushings		Completed:  XX
  6.4.6  Check the spin sta. rollers/bearings/bushings	Completed:  XX
  6.4.7  Check the brush sta. drive bearings/bushings	Completed:  XX
  6.4.8  Check the +5 VDC power supply			Pre-Adjust:  4.94
							Post-Adjust:
  6.4.9  Check the -12 VDC power supply			Pre-Adjust: -13.01
  6.4.10 Check the +12 VDC power supply			Pre-Adjust:  12.94
  6.4.11 Check the +24 VDC power supply			Pre-Adjust:  24.35
							Post-Adjust:
  6.4.12 Check the +48 VDC power supply			Pre-Adjust:  48.2
							Post-Adjust:
  Comments:__________________________________________________________________
           __________________________________________________________________
           __________________________________________________________________
 | 
| 50.23 | WW 22 - Weekly completed | SUBPAC::LANDRY |  | Sun Nov 24 1996 13:33 | 27 | 
|  | 
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 11/24/96   SYSTEM RTC CODE: CMP-SCRUB.A3   TECH. NAME: Finn, Landry
          
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  34
  6.1.3  Check the Drip Pan for contamination           Completed:   X
  6.1.4  Check all tubing/fittings for leaks		Completed:   X
  6.1.5  Check all wafer transport belts		Completed:   X
  6.1.6  Clean the Send module and Scrub modules  	Completed:   X
  6.1.7  Check scrub brushes for contamination		Completed:   X
  6.1.8  Check scrub brush height in both modules	Completed:   X
  Comments:	    
                                  OB      IB
      	   Brush Heights: Front   440     473
                          Rear    435     487
 | 
| 50.24 | WW 23 - Weekly completed | SUBPAC::LANDRY |  | Sun Dec 01 1996 18:35 | 27 | 
|  | 
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 12/1/96   SYSTEM RTC CODE: CMP-SCRUB.A3   TECH. NAME: Landry/Finn/Gee
          
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  33
  6.1.3  Check the Drip Pan for contamination           Completed:   X
  6.1.4  Check all tubing/fittings for leaks		Completed:   X
  6.1.5  Check all wafer transport belts		Completed:   X
  6.1.6  Clean the Send module and Scrub modules  	Completed:   X
  6.1.7  Check scrub brushes for contamination		Completed:   X
  6.1.8  Check scrub brush height in both modules	Completed:   X
  Comments:	    
                                  OB      IB
      	   Brush Heights: Front   440     473
                          Rear    435     487
 | 
| 50.25 | WEEKLY PM FOR WW24 COMPLETED | SUBPAC::BJUBINVILLE | CMP-6 Equipment Engineering | Wed Dec 11 1996 00:19 | 28 | 
|  | 
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 12/11/96   SYSTEM RTC CODE: CMP-SCRUB.A3   TECH. NAME: JUBINVILLE
          
  6.1.1  Check the CDA pressure for 50 PSI             Pre-Adjust: 50 JUBINVILLE
  6.1.2  Check the D.I. Water pressure for 40 PSI      Pre-Adjust: 33 JUBINVILLE
  6.1.3  Check the Drip Pan for contamination          Completed: JUBINVILLE  
                                                      
  6.1.4  Check all tubing/fittings for leak            Completed: JUBINVILLE  
  6.1.5  Check all wafer transport belts	       Completed: JUBINVILLE 
  6.1.6  Clean the Send module and Scrub modules       Completed: JUBINVILLE  
  6.1.7  Check scrub brushes for contamination	       Completed: JUBINVILLE   
  6.1.8  Check scrub brush height in both modules      Completed: JUBINVILLE  
  Comments: Replaced the rear (left) roller arm in the OUTSIDE brush
            station.	    
                                      OB      IB
       	       Brush Heights: Front   440     473
                              Rear    435     487
 | 
| 50.26 | WW XXV - Weekly completed | SUBPAC::LANDRY |  | Sun Dec 15 1996 14:44 | 32 | 
|  | 
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 12/15/96   SYSTEM RTC CODE: CMP-SCRUB.A3   TECH. NAME: Finn / Landry
          
  6.1.1  Check the CDA pressure for 50 PSI             Pre-Adjust: 50 
  6.1.2  Check the D.I. Water pressure for 40 PSI      Pre-Adjust: 32
  6.1.3  Check the Drip Pan for contamination          Completed:   X
                                                      
  6.1.4  Check all tubing/fittings for leak            Completed:   X
  6.1.5  Check all wafer transport belts	       Completed:   X
  6.1.6  Clean the Send module and Scrub modules       Completed:   X
  6.1.7  Check scrub brushes for contamination	       Completed:   X
  6.1.8  Check scrub brush height in both modules      Completed:   X
  Comments:  Found water in the drip pan in several places.  Tightened fittings
             on distribution manifold.  Also noticed water dripping from the 
             send station, location is on the wafer exit side.  Water appears 
             to be coming from the wafer exit slot.
                                      OB      IB
                                     ----    ----
       	       Brush Heights: Front   440     473
                              Rear    435     487
 | 
| 50.27 | weekly ww26 | FABSIX::M_RIDLON | Eliminate the oblivious | Mon Dec 23 1996 01:58 | 29 | 
|  | 
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 12/23/96   SYSTEM RTC CODE: CMP-SCRUB.A3   TECH. NAME: Ridlon 
          
  6.1.1  Check the CDA pressure for 50 PSI             Pre-Adjust: 50 
  6.1.2  Check the D.I. Water pressure for 40 PSI      Pre-Adjust: 32.5
  6.1.3  Check the Drip Pan for contamination          Completed:   X
                                                      
  6.1.4  Check all tubing/fittings for leak            Completed:   X
  6.1.5  Check all wafer transport belts	       Completed:   X
  6.1.6  Clean the Send module and Scrub modules       Completed:   X
  6.1.7  Check scrub brushes for contamination	       Completed:   X
  6.1.8  Check scrub brush height in both modules      Completed:   X 
                                      OB      IB
                                     ----    ----
       	       Brush Heights: Front   440     473
                              Rear    435     487
  Comments:  Found and repaired a small leak coming from the union fitting on  
             NH4OH pressure gauge. 
 | 
| 50.28 | cmp-scrub.a3 shutdown checksheet completed | FABSIX::R_GEE |  | Tue Dec 31 1996 16:01 | 23 | 
|  | 
                CMP-SCRUB.A1/.A2/.A3/.C1-7 SHUTDOWN CHECKSHEET  Tech: Tim Landry
                ----------------------------------------------        Bob Gee
                                                        Tech.       Date
                                                       -------     -------
  1.  Close main incoming DI Water valve(s) to each
      system and open the DI Water return valve
      (UDR).  This will allow all incoming DI Water
      to flow to UDR.                                  Tim Landry  12/31/96
  2.  Remove all PVA scrub brushes and submerge        Bob Gee     12/31/96
      in a mixture of DI water and H2O2.  Label 
      each brush with the tool name and brush box
      location.
  3.  Perform a complete wipe down and dry of
      all wet surfaces.                                Tim Landry  12/31/96
  4.  Power down each system.                          Tim Landry  12/31/96
  5.  Enter checksheet into notesfile.                 Bob Gee     12/31/96
 | 
| 50.29 | WEEKLY PM  COMPLETED FOR WW27 | SUBPAC::BJUBINVILLE | CMP-6 Equipment Engineering | Thu Jan 02 1997 07:40 | 29 | 
|  | 
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 1/1/97   SYSTEM RTC CODE: CMP-SCRUB.A3   TECH. NAME: Olin Whitford (OW)
                                                         Brian Jubinville (BJ)
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:   50/OW
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  40/38/BJ
  6.1.3  Check the Drip Pan for contamination           Completed:     BJ
  6.1.4  Check all tubing/fittings for leaks		Completed:     BJ
  6.1.5  Check all wafer transport belts		Completed:     BJ
  6.1.6  Clean the Send module and Scrub modules  	Completed:     BJ
  6.1.7  Check scrub brushes for contamination		Completed:     BJ
  6.1.8  Check scrub brush height in both modules	Completed:     OW
                                 OB      IB
                                ----    ----
      	   Brush Heights: Front  440     473    
                          Rear   435     488
  Comments:  
 | 
| 50.30 | weekly ww28 | FABSIX::M_RIDLON | Eliminate the oblivious | Tue Jan 07 1997 02:23 | 30 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 1/7/97   SYSTEM RTC CODE:CMP-SCRUB.A3  TECH. NAME: Mitch Ridlon
                                                          Albert Quillen
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:____52____
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:____34____
  6.1.3  Check the Drip Pan for contamination           Completed:___MR,AQ___
  6.1.4  Check all tubing/fittings for leaks		Completed:___MR,AQ___
  6.1.5  Check all wafer transport belts		Completed:___MR,AQ___
  6.1.6  Clean the Send module and Scrub modules  	Completed:___MR,AQ___
  6.1.7  Check scrub brushes for contamination		Completed:___MR,AQ___
  6.1.8  Check scrub brush height in both modules	Completed:___MR,AQ___
                                    OUTSIDE  INSIDE
                             FRONT    440     473
                             REAR     435     487
  Comments:
6.1.2 The DI water gauge was replaced due to nonfunctionality.
ENGINEER INFORMED.
 | 
| 50.31 | Weekly PM complete for WW29 | FABSIX::O_WHITFORD | Quticherwhinin' | Wed Jan 15 1997 21:22 | 32 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 1/15/1997   SYSTEM RTC CODE: CMP-SCRUB.A3  TECH. NAME: DAVE WHITFORD (DW)
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50   DW
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 36*  DW
  6.1.3  Check the Drip Pan for contamination           Completed:  DW
  6.1.4  Check all tubing/fittings for leaks		Completed:  DW
  6.1.5  Check all wafer transport belts		Completed:  DW
  6.1.6  Clean the Send module and Scrub modules  	Completed:  DW
  6.1.7  Check scrub brushes for contamination		Completed:  DW
  6.1.8  Check scrub brush height in both modules	Completed:  DW
  Comments:  BRUSH HEIGHTS
                   OUTER STATION
                                  INSIDE = .430
                                 OUTSIDE = .435
                   INNER STATION  
                                  INSIDE = .473
                                 OUTSIDE = .487
NOTE: EE WAS NOTIFIED OF DI WATER PRESSURE DISCREPANCY  
 | 
| 50.32 | WW30 WEEKLY PM COMPLETED | FABSIX::R_POIRIER |  | Mon Jan 20 1997 21:41 | 33 | 
|  | --------------------------------------------------------------------------------
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 1/20/97   SYSTEM RTC CODE: CMP-SCRUB.A3  TECH. NAME: ROGER POIRIER(RP)
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50  RP
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 33* RP 
  6.1.3  Check the Drip Pan for contamination           Completed:  RP
  6.1.4  Check all tubing/fittings for leaks		Completed:  RP
  6.1.5  Check all wafer transport belts		Completed:  RP
  6.1.6  Clean the Send module and Scrub modules  	Completed:  RP
  6.1.7  Check scrub brushes for contamination		Completed:  RP
  6.1.8  Check scrub brush height in both modules	Completed:  RP
  Comments:  BRUSH HEIGHTS
                   OUTER STATION
                                  FRONT  = .435
                                  BACK   = .430
                   INNER STATION  
                                  FRONT  = .473
                                  BACK   = .487
* NOTE: 6.1.2 EE HAS BEEN NOTIFIED OF DI WATER PRESSURE DISCREPANCY  
 | 
| 50.33 | WW31 Weekly PM | FABSIX::R_POIRIER |  | Wed Jan 29 1997 07:12 | 37 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 1/28/97   SYSTEM RTC CODE: CMP-SCRUB.A3  TECH. NAME: ROGER POIRIER(RP)
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50  RP
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 32* RP 
  6.1.3  Check the Drip Pan for contamination           Completed:  RP/MR
  6.1.4  Check all tubing/fittings for leaks		Completed:  RP
  6.1.5  Check all wafer transport belts		Completed:  RP
  6.1.6  Clean the Send module and Scrub modules  	Completed:  RP
  6.1.7  Check scrub brushes for contamination		Completed:  RP
  6.1.8  Check scrub brush height in both modules	Completed:  RP
  Comments:  BRUSH HEIGHTS
                   OUTER STATION
                                  FRONT  = .440
                                  BACK   = .435
                   INNER STATION  
                                  FRONT  = .473
                                  BACK   = .487
* NOTE: 6.1.2 EE HAS BEEN NOTIFIED OF DI WATER PRESSURE DISCREPANCY  
  NOTE: Small water leak found under Outside Brush Exit Pneumatic valve.
	Tightened teflon screw and leak stopped. Wiped up excess water.
 | 
| 50.34 | WW32 WEEKLY PM | FABSIX::J_SADIN | Freedom isn't free. | Sun Feb 02 1997 18:02 | 37 | 
|  |     
    
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 2/2/97   SYSTEM RTC CODE: CMP-SCRUB.A3  TECH. NAME: JIM SADIN
    							   DOC LANDRY
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50  JS
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 32* JS 
  6.1.3  Check the Drip Pan for contamination           Completed:  TL/JS
  6.1.4  Check all tubing/fittings for leaks		Completed:  TL/JS
  6.1.5  Check all wafer transport belts		Completed:  JS
  6.1.6  Clean the Send module and Scrub modules  	Completed:  JS
  6.1.7  Check scrub brushes for contamination		Completed:  JS
  6.1.8  Check scrub brush height in both modules	Completed:  TL
  Comments:  BRUSH HEIGHTS
                   OUTER STATION
                                  FRONT  = 440
                                  BACK   = 435
                   INNER STATION  
                                  FRONT  = 473
                                  BACK   = .87
    
    
    * ENG NOTIFIED
 | 
| 50.35 | WW #33 weekly PM | FABSIX::O_WHITFORD | Lead, follow or step aside. | Thu Feb 13 1997 06:01 | 39 | 
|  |               
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 2/13/95   SYSTEM RTC CODE: CMP-SCRUB.A3  TECH. NAME: Dave Whitford
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50  DW
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 32* DW
  6.1.3  Check the Drip Pan for contamination           Completed: DW
  6.1.4  Check all tubing/fittings for leaks		Completed: DW
  6.1.5  Check all wafer transport belts		Completed: DW
  6.1.6  Clean the Send module and Scrub modules  	Completed: DW
  6.1.7  Check scrub brushes for contamination		Completed: DW
  6.1.8  Check scrub brush height in both modules	Completed: DW
  Comments:
          Brush heights
                
                Outer Station
                      Inside = .441
                      Outside= .435
                Inner Station
                      Inside = .473
                      Outside= .435
* Equipment engineer has been made aware that the DI pressure cannot be 
adjusted up to the specified 40 PSI
              
 | 
| 50.36 | ww34 Quarterly PM completed. | FABSIX::L_SHKOLNIKOV |  | Wed Feb 19 1997 01:52 | 45 | 
|  |            OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
             Quarterly Preventative Maintenance Check Sheet, Rev D
 DATE: 02/19/97   SYSTEM RTC CODE: CMP-SCRUB.A3  TECH. NAME: Leon Shkolnikov LS
  6.1    Perform Weekly PM                              Completed: LS
  6.3.1  Check muffin fans for functionality		Completed: LS
  6.3.2  Check motor drive belts for defects		Completed: LS
  6.3.3  Check the robot knife for loose hardware	Completed: LS
  6.3.4  Check the spin station grippers		Completed: LS
  6.3.5  Check the motor speed output readings		Completed: LS
  Comments: Outside brush station: Roller motor speed has been adjusted.      
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 02/19/96   SYSTEM RTC CODE: CMP-SCRUB.A3  TECH. NAME: Leon Shkolnikov LS
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 psi
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 40 psi
  6.1.3  Check the Drip Pan for contamination           Completed: LS
  6.1.4  Check all tubing/fittings for leaks		Completed: LS
  6.1.5  Check all wafer transport belts		Completed: LS
  6.1.6  Clean the Send module and Scrub modules  	Completed: LS
  6.1.7  Check scrub brushes for contamination		Completed: LS
  6.1.8  Check scrub brush height in both modules	Completed: LS
  Comments:          Inside Brush  F-440 R-435
                    Outside Brush  F-473 R-487
 | 
| 50.37 | ww35 weekly p.m. completed | FABSIX::R_GEE |  | Mon Feb 24 1997 18:15 | 42 | 
|  |               
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 2/24/95   SYSTEM RTC CODE: CMP-SCRUB.A3  TECH. NAME:Brendan Finn (BF)
							   Tim Landry   (TL) 
							   Jim Sadin    (JS)
                                                           Bob Gee      (BG)
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50  BG
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 32* BG
  6.1.3  Check the Drip Pan for contamination           Completed: JS
  6.1.4  Check all tubing/fittings for leaks		Completed: JS
  6.1.5  Check all wafer transport belts		Completed: TL
  6.1.6  Clean the Send module and Scrub modules  	Completed: TL
  6.1.7  Check scrub brushes for contamination		Completed: BF
  6.1.8  Check scrub brush height in both modules	Completed: BF
  Comments:
          Brush heights
                
                Outer Station
                      Front = .441
                      back  = .435
                Inner Station
                      Front = .473
                      Back  = .487
* Equipment engineer has been made aware that the DI pressure cannot be 
  adjusted up to the specified 40 PSI
              
 | 
| 50.38 | ww36 weekly | FABSIX::J_SADIN | Freedom isn't free. | Sun Mar 02 1997 16:55 | 38 | 
|  |               
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 03/02/97   SYSTEM RTC CODE: CMP-SCRUB.A3  TECH. NAME:Brendan Finn (BF)
							   Tim Landry   (TL) 
							   Jim Sadin    (JS)
                                                           Bob Gee      (BG)
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50  BG
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 37  BG
  6.1.3  Check the Drip Pan for contamination           Completed: JS
  6.1.4  Check all tubing/fittings for leaks		Completed: JS
  6.1.5  Check all wafer transport belts		Completed: TL
  6.1.6  Clean the Send module and Scrub modules  	Completed: TL
  6.1.7  Check scrub brushes for contamination		Completed: BF
  6.1.8  Check scrub brush height in both modules	Completed: BF
  Comments:
          Brush heights
                
                Outer Station
                      Front = .440
                      back  = .435
                Inner Station
                      Front = .473
                      Back  = .487
 | 
| 50.39 | WEEKLY PM FOR WW37 COMPLETED | SUBPAC::BJUBINVILLE | CMP Equipment Engineering | Thu Mar 13 1997 21:29 | 31 | 
|  | 
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:03/13/97   SYSTEM RTC CODE: CMP-SCRUB.A3 TECH: Brian Jubinville  (BJ)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 BJ
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  * 36 BJ
  6.1.3  Check the Drip Pan for contamination           Completed: BJ
  6.1.4  Check all tubing/fittings for leaks		Completed: BJ
  6.1.5  Check all wafer transport belts		Completed: BJ
  6.1.6  Clean the Send module and Scrub modules  	Completed: BJ
  6.1.7  Check scrub brushes for contamination		Completed: BJ
  6.1.8  Check scrub brush height in both modules	Completed: BJ
                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 440      475
                          Rear  435      487
  Comments: 6.1.2 * EE has been notified that DI water pressure can't be 
            adjusted up to 40 psi.
                                                                        
 | 
| 50.40 | ww38 weekly pm. | FABSIX::L_SHKOLNIKOV |  | Wed Mar 19 1997 04:55 | 32 | 
|  | 
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:03/19/97  SYSTEM RTC CODE: CMP-SCRUB.A3  TECH: Leon Shkolnikov - (ls)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 ls
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  * 36 ls
  6.1.3  Check the Drip Pan for contamination           Completed: ls
  6.1.4  Check all tubing/fittings for leaks		Completed: ls
  6.1.5  Check all wafer transport belts		Completed: ls
  6.1.6  Clean the Send module and Scrub modules  	Completed: ls
  6.1.7  Check scrub brushes for contamination		Completed: ls
  6.1.8  Check scrub brush height in both modules	Completed: ls
                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 440      475
                          Rear  435      487
  Comments: 6.1.2 * EE has been notified that DI water pressure can't be 
            adjusted up to 40 psi.
                                                                        
                                                                 
 | 
| 50.41 | ww39 weekly p.m. completed | FABSIX::R_GEE |  | Mon Mar 24 1997 08:40 | 32 | 
|  | 
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:03/24/97  SYSTEM RTC CODE: CMP-SCRUB.A3  TECH: Bob Gee  - (BG)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 BG
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  * 34 BG
  6.1.3  Check the Drip Pan for contamination           Completed: BG
  6.1.4  Check all tubing/fittings for leaks		Completed: BG
  6.1.5  Check all wafer transport belts		Completed: BG
  6.1.6  Clean the Send module and Scrub modules  	Completed: BG
  6.1.7  Check scrub brushes for contamination		Completed: BG
  6.1.8  Check scrub brush height in both modules	Completed: BG
                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 440      475
                          Rear  435      487
  Comments: 6.1.2 * EE has been notified that DI water pressure can't be 
            adjusted up to 40 psi.
                                                                        
                                                                 
 | 
| 50.42 | WW40 weekly pm completed. | FABSIX::J_SADIN | Freedom isn't free. | Mon Mar 31 1997 09:55 | 32 | 
|  |                                                              
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:03/31/97   SYSTEM RTC CODE: CMP-SCRUB.A3 TECH: Timothy Landry (TL)
                                                     James Sadin    (JS)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 JS
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  * 34 JS
  6.1.3  Check the Drip Pan for contamination           Completed: TL
  6.1.4  Check all tubing/fittings for leaks		Completed: TL
  6.1.5  Check all wafer transport belts		Completed: JS
  6.1.6  Clean the Send module and Scrub modules  	Completed: TL/JS
  6.1.7  Check scrub brushes for contamination		Completed: TL
  6.1.8  Check scrub brush height in both modules	Completed: JS
                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 440      475
                          Rear  435      487
  Comments: 6.1.2 * EE has been notified that DI water pressure can't be 
            adjusted up to 40 psi.
                                                                        
 | 
| 50.43 | WW41 weekly pm completed | FABSIX::J_SADIN | Freedom isn't free. | Wed Apr 09 1997 09:59 | 34 | 
|  |              OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:04/09/97   SYSTEM RTC CODE: CMP-SCRUB.A3 TECH: Timothy Landry (TL)
                                                     James Sadin    (JS)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 JS
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  * 34 JS
  6.1.3  Check the Drip Pan for contamination           Completed: TL
  6.1.4  Check all tubing/fittings for leaks		Completed: TL
  6.1.5  Check all wafer transport belts		Completed: JS
  6.1.6  Clean the Send module and Scrub modules  	Completed: TL/JS
  6.1.7  Check scrub brushes for contamination		Completed: TL
  6.1.8  Check scrub brush height in both modules	Completed: JS
                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 440      475
                          Rear  435      487
  Comments: 6.1.2 * EE has been notified that DI water pressure can't be 
            adjusted up to 40 psi.
                                                                        
    
           
 | 
| 50.44 | WEEKLY PM COMPLETED FOR WW42 | SUBPAC::BJUBINVILLE | CMP Equipment Engineering | Thu Apr 17 1997 04:30 | 34 | 
|  |              OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:04/17/97   SYSTEM RTC CODE: CMP-SCRUB.A3 TECH: Brian Jubinville (BJ)
                                                    
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 BJ
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  * 34 BJ 
  6.1.3  Check the Drip Pan for contamination           Completed: BJ
  6.1.4  Check all tubing/fittings for leaks		Completed: BJ
  6.1.5  Check all wafer transport belts		Completed: BJ
  6.1.6  Clean the Send module and Scrub modules  	Completed: BJ
  6.1.7  Check scrub brushes for contamination		Completed: BJ
  6.1.8  Check scrub brush height in both modules	Completed: BJ
                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 440      475
                          Rear  435      487
              
  Comments: 6.1.2 * EE has been notified that DI water pressure can't be 
            adjusted up to 40 psi.
                                                                        
    
           
 | 
| 50.45 | WEEKLY PM COMPLETED FOR WW43 | SUBPAC::BJUBINVILLE | CMP Equipment Engineering | Wed Apr 23 1997 21:46 | 35 | 
|  |              OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:04/23/97   SYSTEM RTC CODE: CMP-SCRUB.A3 TECH: Brian Jubinville (BJ)
                                                    
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 BJ
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  * 36 BJ 
  6.1.3  Check the Drip Pan for contamination           Completed: BJ
  6.1.4  Check all tubing/fittings for leaks		Completed: BJ
  6.1.5  Check all wafer transport belts		Completed: BJ
  6.1.6  Clean the Send module and Scrub modules  	Completed: BJ
  6.1.7  Check scrub brushes for contamination		Completed: BJ
  6.1.8  Check scrub brush height in both modules	Completed: BJ
                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 440      475
                          Rear  435      487
              
  Comments: 6.1.2 * EE has been notified that DI water pressure can't be 
            adjusted up to 40 psi.
                                                                        
    
           
                                                   
 | 
| 50.46 | WW44 weekly pm completed | FABSIX::B_JUBINVILLE |  | Wed Apr 30 1997 05:30 | 37 | 
|  |              OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:04/30/97   SYSTEM RTC CODE: CMP-SCRUB.A3 TECH: Brian Jubinville (BJ)
                                                    
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 BJ
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  36 BJ
    * 
  6.1.3  Check the Drip Pan for contamination           Completed: BJ
  6.1.4  Check all tubing/fittings for leaks		Completed: BJ
  6.1.5  Check all wafer transport belts		Completed: BJ
  6.1.6  Clean the Send module and Scrub modules  	Completed: BJ
  6.1.7  Check scrub brushes for contamination		Completed: BJ
  6.1.8  Check scrub brush height in both modules	Completed: BJ
                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 440      475
                          Rear  435      487
              
  Comments: 6.1.2 * EE has been notified that DI water pressure can't be 
            adjusted up to 40 psi.
                                                                        
    
           
                                                   
     
 | 
| 50.47 | WW45 WEEKLY PM COMPLETED | FABSIX::J_SADIN | Freedom isn't free. | Tue May 06 1997 12:17 | 32 | 
|  |              OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:05/06/97   SYSTEM RTC CODE: CMP-SCRUB.A3 TECH: JAMES SADIN 
                                                     TIMOTHY LANDRY
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  36 
    * 
  6.1.3  Check the Drip Pan for contamination           Completed: JS
  6.1.4  Check all tubing/fittings for leaks		Completed: TL
  6.1.5  Check all wafer transport belts		Completed: JS
  6.1.6  Clean the Send module and Scrub modules  	Completed: TL
  6.1.7  Check scrub brushes for contamination		Completed: JS
  6.1.8  Check scrub brush height in both modules	Completed: TL
                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 440      475
                          Rear  435      487
              
  Comments: 6.1.2 * EE has been notified that DI water pressure can't be 
            adjusted up to 40 psi.
                                                                       
 | 
| 50.48 | WW46 weekly pm completed. | FABSIX::J_SADIN | Freedom isn't free. | Tue May 13 1997 09:16 | 35 | 
|  |              OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:05/13/97   SYSTEM RTC CODE: CMP-SCRUB.A3 TECH: JAMES SADIN 
                                                     TIMOTHY LANDRY
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  34 
    * 
  6.1.3  Check the Drip Pan for contamination           Completed: JS
  6.1.4  Check all tubing/fittings for leaks		Completed: TL
  6.1.5  Check all wafer transport belts		Completed: JS
  6.1.6  Clean the Send module and Scrub modules  	Completed: TL
  6.1.7  Check scrub brushes for contamination		Completed: JS
  6.1.8  Check scrub brush height in both modules	Completed: TL
                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 440      475
                          Rear  435      487
              
  Comments: 6.1.2 * EE has been notified that DI water pressure can't be 
            adjusted up to 40 psi.
                                                                       
                Found mucho water in drip pan (due to known leak between send
        station and outside brush station). Cleaned up water and notified
        EE of situation.
 | 
| 50.49 | CMP-SCRUB.A3 SHUTDOWN AND STARTUP CHECKSHEETS | FABSIX::J_SADIN | Freedom isn't free. | Tue May 27 1997 10:11 | 57 | 
|  | 
				Scrub.A3
          CMP-SCRUB.A1/.A2/.A3/.C1 SHUTDOWN CHECKSHEET FOR 5/26/97
          --------------------------------------------------------
                                                        Tech.       Date
                                                       -------     -------
  1.  Change Workstream tool status to NON_SCHEDULED  
      DOWN.  If Workstream will not let the tools go
      to NON-SCHEDULED, leave the tools at UP IDLE.
      DO NO put any tools to SCHEDULED or UNSCHEDULED     RP        5-26-97
       DOWN.                                            _______     _______
  2.  Close main incoming DI Water valve(s) to each
      system and open the DI Water return valve
      (UDR).  This will allow all incoming DI Water       RP        5-26-97
      to flow to UDR.                                  _______     _______
  3.  Remove all PVA scrub brushes and submerge
      in a mixture of DI water and H2O2.  Label 
      each brush with the tool name and brush box         RP        5-26-97
      location.                                        _______     _______
  4.  Perform a complete wipe down and dry of             RP       5-26-97
      all wet surfaces.                                _______     _______
              						  RP       5-26-97
  5.  Power down each system.                          _______     _______
  6.  Enter checksheet into notesfile.
           CMP-SCRUB.A1/.A2/.A3/.C1-7 STARTUP CHECKSHEET FOR 5/27/97
           ---------------------------------------------------------
                                                        Tech.       Date
                                                       -------     -------
  1.  Ensure that all necessary facilities are           tl        5/27
      available and ready to use.                      _______     _______
                                                         tl        5/27
  2.  Power up each system.                            _______     _______
                                                         tl        5/27
  3.  Re-install PVA scrub brushes.                    _______     _______
  4.  Open incoming DI Water Valve(s) to each            tl        5/27
      system.                                          _______     _______  
                                                         tl        5/27
  5.  Close UDR valve at each system.                  _______     _______
  6.  Cycle a minimum of 25 wafers through each          tl        5/27
      tool to verify proper operation.                 _______     _______
  7.  Notify Operations that the systems are ready       tl        5/27
      for MQC.                                         _______     _______
  8.  Enter checksheet into notesfile.                   tl        5/27
 | 
| 50.50 | SEMI-ANNUAL PM FOR WW47 COMPLETED | SUBPAC::BJUBINVILLE | CMP Equipment Engineering | Wed May 28 1997 06:27 | 47 | 
|  |            OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
            Semi-Annual Preventative Maintenance Check Sheet, Rev D
 DATE:5/28/97     TOOL: :CMP-SCRUB.A3  TECH. NAME: John Poirier (JP)
                                                   Brian Jubinville (BJ)
                                                            
  6.1    Perform Weekly PM                              Completed: BJ
                                                        
  6.3    Perform Quarterly PM                           Completed: BJ
  6.4.1  Check all EMO's for functionality		Completed: JP
  6.4.2  Check all interlocks for functionality  	Completed: JP
  6.4.3  Check heat lamp housing/wiring for defects	Completed: JP
  6.4.4  Check the robot hardware/wiring for defects	Completed: BJ
  6.4.5  Check the spindle bearings/bushings		Completed: BJ
  6.4.6  Check the spin sta. rollers/bearings/bushings	Completed: BJ
  6.4.7  Check the brush sta. drive bearings/bushings	Completed: BJ
  6.4.8  Check the +5 VDC power supply			Pre-Adjust: 5.01 BJ
							Post-Adjust: 5.01 BJ
  6.4.9  Check the -12 VDC power supply			Pre-Adjust: -12.6 BJ
  6.4.10 Check the +12 VDC power supply			Pre-Adjust: 12.6 BJ
  6.4.11 Check the +24 VDC power supply			Pre-Adjust: 23.7 BJ
							Post-Adjust: 23.7 BJ
  6.4.12 Check the +48 VDC power supply			Pre-Adjust: 48.3 BJ
							Post-Adjust: 48.3 BJ
  Comments:__________________________________________________________________
           __________________________________________________________________
           __________________________________________________________________
 | 
| 50.51 | WEEKLY PM FOR WW48 COMPLETED | SUBPAC::BJUBINVILLE | CMP Equipment Engineering | Wed May 28 1997 06:32 | 31 | 
|  |              OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:05/28/97   SYSTEM RTC CODE: CMP-SCRUB.A3 TECH: Brian Jubinville (BJ)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 BJ
                                                 
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: * 34 * BJ
  6.1.3  Check the Drip Pan for contamination           Completed: BJ    
  6.1.4  Check all tubing/fittings for leaks		Completed: BJ
  6.1.5  Check all wafer transport belts		Completed: BJ
  6.1.6  Clean the Send module and Scrub modules  	Completed: BJ
  6.1.7  Check scrub brushes for contamination		Completed: BJ
  6.1.8  Check scrub brush height in both modules	Completed: BJ
                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 440      475
                          Rear  435      487
              
  Comments: 6.1.2 * EE has been notified that DI water pressure can't be 
            adjusted up to 40 psi.
                                                                       
 
 | 
| 50.52 | WW49 weekly pm completed. | FABSIX::J_SADIN | Freedom isn't free. | Mon Jun 02 1997 09:36 | 33 | 
|  |              OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:06/02/97   SYSTEM RTC CODE: CMP-SCRUB.A3 TECH: JAMES SADIN 
                                                     TIMOTHY LANDRY
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  34 
    * 
  6.1.3  Check the Drip Pan for contamination           Completed: JS
  6.1.4  Check all tubing/fittings for leaks		Completed: TL
  6.1.5  Check all wafer transport belts		Completed: JS
  6.1.6  Clean the Send module and Scrub modules  	Completed: TL
  6.1.7  Check scrub brushes for contamination		Completed: JS
  6.1.8  Check scrub brush height in both modules	Completed: TL
                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 440      475
                          Rear  435      487
              
  Comments: 6.1.2 * EE has been notified that DI water pressure can't be 
            adjusted up to 40 psi.
                                                                       
           
 |