| T.R | Title | User | Personal Name
 | Date | Lines | 
|---|
| 46.4 | PM of the week | SUBPAC::LANDRY |  | Sun Nov 05 1995 18:22 | 23 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:  11/05/95   SYSTEM RTC CODE:  CMP-SCRUB.A1  TECH. NAME:  Landry/Finn
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:____50____
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:__22/32___
  6.1.3  Check the Drip Pan for contamination           Completed:____X______
  6.1.4  Check all tubing/fittings for leaks		Completed:____X______
  6.1.5  Check all wafer transport belts		Completed:____X______
  6.1.6  Clean the Send module and Scrub modules  	Completed:____X______
  6.1.7  Check scrub brushes for contamination		Completed:____X______
  6.1.8  Check scrub brush height in both modules	Completed:____X______
  Comments:  
 | 
| 46.5 | WW19 Semi-Annual PM | FABSIX::R_POIRIER |  | Sun Nov 05 1995 23:08 | 87 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:  11/05/95   SYSTEM RTC CODE:  CMP-SCRUB.A1  TECH. NAME:  Landry/Finn
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:____50____
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:__22/32___
  6.1.3  Check the Drip Pan for contamination           Completed:____X______
  6.1.4  Check all tubing/fittings for leaks		Completed:____X______
  6.1.5  Check all wafer transport belts		Completed:____X______
  6.1.6  Clean the Send module and Scrub modules  	Completed:____X______
  6.1.7  Check scrub brushes for contamination		Completed:____X______
  6.1.8  Check scrub brush height in both modules	Completed:____X______
  Comments:  Brush heights  Out Front - 360 Rear - 370
			    In  Front - 340 Rear - 350
           OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
             Quarterly Preventative Maintenance Check Sheet, Rev D
 DATE: 11-05-95    SYSTEM RTC CODE: CMP-SCRUB.A1     TECH. NAME: GEE/POIRIER
  6.3.1  Check muffin fans for functionality		Completed:__DONE_____
  6.3.2  Check motor drive belts for defects		Completed:__DONE_____
  6.3.3  Check the robot knife for loose hardware	Completed:__DONE_____
  6.3.4  Check the spin station grippers		Completed:__DONE_____
  6.3.5  Check the motor speed output readings		Completed:__DONE_____
  Comments:__________________________________________________________________
           __________________________________________________________________
           __________________________________________________________________
           OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
            Semi-Annual Preventative Maintenance Check Sheet, Rev D
 DATE:_11-05-95  SYSTEM RTC CODE: CMP-SCRUB.A1 TECH. NAME:__GEE/POIRIER______
  6.4.1  Check all EMO's for functionality		Completed:__DONE_____
  6.4.2  Check all interlocks for functionality  	Completed:__DONE_____
  6.4.3  Check heat lamp housing/wiring for defects	Completed:__DONE_____
  6.4.4  Check the robot hardware/wiring for defects	Completed:__DONE_____
  6.4.5  Check the spindle bearings/bushings		Completed:__DONE_____
  6.4.6  Check the spin sta. rollers/bearings/bushings	Completed:__DONE_____
  6.4.7  Check the brush sta. drive bearings/bushings	Completed:__DONE_____
  6.4.8  Check the +5 VDC power supply			Pre-Adjust: +5.00V
							Post-Adjust:__N/A____
  6.4.9  Check the -12 VDC power supply			Pre-Adjust: +11.80V
  6.4.10 Check the +12 VDC power supply			Pre-Adjust: -12.03V
  6.4.11 Check the +24 VDC power supply			Pre-Adjust: +24.06V
							Post-Adjust:__N/A____
  6.4.12 Check the +48 VDC power supply			Pre-Adjust: +48.1V
							Post-Adjust:__N/A____
  Comments:__________________________________________________________________
           __________________________________________________________________
           __________________________________________________________________
 | 
| 46.1 | Weekly PM Checksheet Template | SUBPAC::BJUBINVILLE | NFD Fire - Rescue | Wed Nov 08 1995 21:08 | 26 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:__________   SYSTEM RTC CODE:__________  TECH. NAME:__________________
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:__________
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:__________
  6.1.3  Check the Drip Pan for contamination           Completed:___________
  6.1.4  Check all tubing/fittings for leaks		Completed:___________
  6.1.5  Check all wafer transport belts		Completed:___________
  6.1.6  Clean the Send module and Scrub modules  	Completed:___________
  6.1.7  Check scrub brushes for contamination		Completed:___________
  6.1.8  Check scrub brush height in both modules	Completed:___________
  Comments:__________________________________________________________________
           __________________________________________________________________
           __________________________________________________________________
 | 
| 46.6 | weekly p.m. | FABSIX::R_GEE |  | Mon Nov 13 1995 22:07 | 23 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:  11/13/95   SYSTEM RTC CODE:  CMP-SCRUB.A1  TECH. NAME:  BG/RP
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:____50____
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:__30/20___
  6.1.3  Check the Drip Pan for contamination           Completed:____X______
  6.1.4  Check all tubing/fittings for leaks		Completed:____X______
  6.1.5  Check all wafer transport belts		Completed:____X______
  6.1.6  Clean the Send module and Scrub modules  	Completed:____X______
  6.1.7  Check scrub brushes for contamination		Completed:____X______
  6.1.8  Check scrub brush height in both modules	Completed:____X______
  Comments:  Brush heights  Out Front - 360 Rear - 370
			    In  Front - 340 Rear - 350
 | 
| 46.7 | weekly p.m. | FABSIX::R_GEE |  | Wed Nov 22 1995 02:06 | 24 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 11/22/95   SYSTEM RTC CODE: CMP-SCRUB.A1  TECH. NAME: BG
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 psi
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 30/21 psi
  6.1.3  Check the Drip Pan for contamination           Completed:____X______
  6.1.4  Check all tubing/fittings for leaks		Completed:____X______
  6.1.5  Check all wafer transport belts		Completed:____X______
  6.1.6  Clean the Send module and Scrub modules  	Completed:____X______
  6.1.7  Check scrub brushes for contamination		Completed:____X______
  6.1.8  Check scrub brush height in both modules	Completed:____X______
  Comments:  INSIDE - 340-F  350-R
             OUTSIDE - 360-F  370-R
        
 | 
| 46.8 | weekly pm | STRATA::FINN |  | Wed Nov 29 1995 18:50 | 24 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 11/29/95   SYSTEM RTC CODE: CMP-SCRUB.A1  TECH. NAME: Brendan/John p.
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 psi
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 31/20 psi
  6.1.3  Check the Drip Pan for contamination           Completed:____X______
  6.1.4  Check all tubing/fittings for leaks		Completed:____X______
  6.1.5  Check all wafer transport belts		Completed:____X______
  6.1.6  Clean the Send module and Scrub modules  	Completed:____X______
  6.1.7  Check scrub brushes for contamination		Completed:____X______
  6.1.8  Check scrub brush height in both modules	Completed:____X______
  Comments:  INSIDE - 340-F  350-R
             OUTSIDE - 360-F  370-R
        
 | 
| 46.9 | pm weekly | STRATA::FINN |  | Mon Dec 04 1995 19:08 | 25 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 12/04/95   SYSTEM RTC CODE: CMP-SCRUB.A1  TECH. NAME: Brendan/Doc
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 psi
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 30/20 psi
  6.1.3  Check the Drip Pan for contamination           Completed:____X______
  6.1.4  Check all tubing/fittings for leaks		Completed:____X______
  6.1.5  Check all wafer transport belts		Completed:____X______
  6.1.6  Clean the Send module and Scrub modules  	Completed:____X______
  6.1.7  Check scrub brushes for contamination		Completed:____X______
  6.1.8  Check scrub brush height in both modules	Completed:____X______
  Comments:  INSIDE - 340-F  350-R
             OUTSIDE - 360-F  370-R
        
	Repaired several small leaking fittings. (H2O)
 | 
| 46.10 | weekly pm ww24 | STRATA::RIDLON | Eliminate the obvious | Tue Dec 12 1995 05:02 | 25 | 
|  | 
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 12/12/95   SYSTEM RTC CODE: CMP-SCRUB.A1  TECH. NAME: B shift
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 psi
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 29/21 psi
  6.1.3  Check the Drip Pan for contamination           Completed:____X______
  6.1.4  Check all tubing/fittings for leaks		Completed:____X______
  6.1.5  Check all wafer transport belts		Completed:____X______
  6.1.6  Clean the Send module and Scrub modules  	Completed:____X______
  6.1.7  Check scrub brushes for contamination		Completed:____X______
  6.1.8  Check scrub brush height in both modules	Completed:____X______
  Comments:  INSIDE - 340-F  350-R
             OUTSIDE - 360-F  370-R
        
 | 
| 46.11 | WW25 WEEKLY PM | FABSIX::R_POIRIER |  | Tue Dec 19 1995 04:46 | 27 | 
|  | --------------------------------------------------------------------------------
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:__12-19-95 __   SYSTEM RTC CODE:_CMP-SCRUB.A1_  TECH. NAME:_GEE/POIRIER___
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:__50psi___
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:_30/25 psi_
  6.1.3  Check the Drip Pan for contamination           Completed:___Done___
  6.1.4  Check all tubing/fittings for leaks		Completed:___Done___
  6.1.5  Check all wafer transport belts		Completed:___Done____
  6.1.6  Clean the Send module and Scrub modules  	Completed:___Done____
  6.1.7  Check scrub brushes for contamination		Completed:___Done____
  6.1.8  Check scrub brush height in both modules	Completed:___Done____
  Comments:____Outside front 360  Outside rear 370
	        Inside front 340   Inside rear 350
           __________________________________________________________________
           __________________________________________________________________
 | 
| 46.12 | No PM necessary for WW26 Fy96 | SUBPAC::TOOKER |  | Thu Dec 21 1995 15:09 | 6 | 
|  | Due to the scheduled FAB6 shutdown during Work Week 26 Fiscal Year 1996, no PM will be performed
on CMP-SCRUB.A1.
     Jim Tooker
     CMP Equipment Engineer
 | 
| 46.13 | WW27 WEEKLY PM | FABSIX::R_POIRIER |  | Tue Jan 02 1996 03:58 | 30 | 
|  | --------------------------------------------------------------------------------
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 1-2-96  SYSTEM RTC CODE: CMP-SCRUB.A1   TECH. NAME:  "B" SHIFT 
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:___50PSI__
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:_25/20____
  6.1.3  Check the Drip Pan for contamination           Completed:__Done_____
  6.1.4  Check all tubing/fittings for leaks		Completed:__Done_____
  6.1.5  Check all wafer transport belts		Completed:__Done_____
  6.1.6  Clean the Send module and Scrub modules  	Completed:__Done_____
  6.1.7  Check scrub brushes for contamination		Completed:__Done_____
  6.1.8  Check scrub brush height in both modules	Completed:__Done_____
  Comments:    Outside Front 315  Outside Rear 351
	       Inside  Front 340  Inside  Rear 350
                                                                      
           __________________________________________________________________
           __________________________________________________________________
 | 
| 46.14 | WW 28 - Weekly | SUBPAC::LANDRY |  | Mon Jan 08 1996 15:13 | 23 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:  1/8/96   SYSTEM RTC CODE:  CMP-SCRUB.A1  TECH. NAME:  Landry
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:____50____
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:__29/22___
  6.1.3  Check the Drip Pan for contamination           Completed:____X______
  6.1.4  Check all tubing/fittings for leaks		Completed:____X______
  6.1.5  Check all wafer transport belts		Completed:____X______
  6.1.6  Clean the Send module and Scrub modules  	Completed:____X______
  6.1.7  Check scrub brushes for contamination		Completed:____X______
  6.1.8  Check scrub brush height in both modules	Completed:____X______
  Comments:  
 | 
| 46.15 | Weekly PM for WW29 completed | SUBPAC::BJUBINVILLE | NFD Fire - Rescue | Wed Jan 17 1996 22:12 | 29 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 1/17/96   SYSTEM RTC CODE: CMP-SCRUB.A2  TECH. NAME: LEON, BJ
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:_____X____
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:___30_____
  6.1.3  Check the Drip Pan for contamination           Completed:______X____
  6.1.4  Check all tubing/fittings for leaks		Completed:______X____
  6.1.5  Check all wafer transport belts		Completed:______X____
  6.1.6  Clean the Send module and Scrub modules  	Completed:______X____
  6.1.7  Check scrub brushes for contamination		Completed:______X____
  6.1.8  Check scrub brush height in both modules	Completed:______X____
  Comments:   Inside brush heights  - Front -  340  rear - 350           
              Outside brush heights - Front -  315  rear - 351
    
    __________________________________________________________________
           __________________________________________________________________
           __________________________________________________________________
 | 
| 46.16 | WEEKLY PM FOR A2 COMPLETED | SUBPAC::BJUBINVILLE | NFD Fire - Rescue | Thu Jan 25 1996 04:24 | 30 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 1/26/96   SYSTEM RTC CODE: CMP-SCRUB.A2  TECH. NAME: D SHIFT
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:_____X____
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:_____35___
  6.1.3  Check the Drip Pan for contamination           Completed:______X____
  6.1.4  Check all tubing/fittings for leaks		Completed:______X____
  6.1.5  Check all wafer transport belts		Completed:______X____
  6.1.6  Clean the Send module and Scrub modules  	Completed:______X____
  6.1.7  Check scrub brushes for contamination		Completed:______X____
  6.1.8  Check scrub brush height in both modules	Completed:______X____
  Comments:   Inside brush heights  - Front -  375  rear - 355           
              Outside brush heights - Front -  360  rear - 366
    
    __________________________________________________________________
           __________________________________________________________________
           __________________________________________________________________
                                                              
 | 
| 46.17 | WEEKLY PM FOR A1 COMPLETED | SUBPAC::BJUBINVILLE | NFD Fire - Rescue | Thu Jan 25 1996 04:27 | 30 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 1/26/96   SYSTEM RTC CODE: CMP-SCRUB.A1  TECH. NAME: D SHIFT
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:_____X____
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:_____35___
  6.1.3  Check the Drip Pan for contamination           Completed:______X____
  6.1.4  Check all tubing/fittings for leaks		Completed:______X____
  6.1.5  Check all wafer transport belts		Completed:______X____
  6.1.6  Clean the Send module and Scrub modules  	Completed:______X____
  6.1.7  Check scrub brushes for contamination		Completed:______X____
  6.1.8  Check scrub brush height in both modules	Completed:______X____
  Comments:   Inside brush heights  - Front -  335  rear - 350          
              Outside brush heights - Front -  315  rear - 350
    
    __________________________________________________________________
           __________________________________________________________________
           __________________________________________________________________
                                                              
 | 
| 46.18 | 1/29/96 weekly performed | STRATA::FINN |  | Mon Jan 29 1996 19:00 | 26 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 1/29/96   SYSTEM RTC CODE: CMP-SCRUB.A1  TECH. NAME: Finn/Landry
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:_____X____
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:_____35___
  6.1.3  Check the Drip Pan for contamination           Completed:______X____
  6.1.4  Check all tubing/fittings for leaks		Completed:______X____
  6.1.5  Check all wafer transport belts		Completed:______X____
  6.1.6  Clean the Send module and Scrub modules  	Completed:______X____
  6.1.7  Check scrub brushes for contamination		Completed:______X____
  6.1.8  Check scrub brush height in both modules	Completed:______X____
  Comments:   Inside brush heights  - Front -  345  rear - 350          
              Outside brush heights - Front -  315  rear - 350
    
           
                                                                         
 | 
| 46.19 | QUARTERLY PM COMPLETED FOR SCRUB.A1 | SUBPAC::BJUBINVILLE | NFD Fire - Rescue | Wed Feb 07 1996 03:30 | 27 | 
|  |            OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
             Quarterly Preventative Maintenance Check Sheet, Rev D
 DATE: 2/7/96   SYSTEM RTC CODE: CMP-SCRUB.A1  TECH. NAME: BJ
         Complete weelk PM checksheet                   Completed:_____X_____
  6.3.1  Check muffin fans for functionality		Completed:_____X_____
  6.3.2  Check motor drive belts for defects		Completed:_____X_____
  6.3.3  Check the robot knife for loose hardware	Completed:_____X_____
  6.3.4  Check the spin station grippers		Completed:_____X_____
  6.3.5  Check the motor speed output readings		Completed:_____X_____
  Comments:   Found recipe not set to correct one.
              It's suppose to be STRAS_CLEAN_BEST.
     
              Found megasonics power off
              Inside brush heights  - Front -  345  rear - 350          
              Outside brush heights - Front -  315  rear - 350
    
           
                                                                         
 | 
| 46.20 | ww33 weekly p.m. | FABSIX::R_GEE |  | Mon Feb 12 1996 00:39 | 24 | 
|  | 
 DATE: 2/12/96   SYSTEM RTC CODE: CMP-SCRUB.A1  TECH. NAME: B SHIFT
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:_____X____
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:_____35___
  6.1.3  Check the Drip Pan for contamination           Completed:______X____
  6.1.4  Check all tubing/fittings for leaks		Completed:______X____
  6.1.5  Check all wafer transport belts		Completed:______X____
  6.1.6  Clean the Send module and Scrub modules  	Completed:______X____
  6.1.7  Check scrub brushes for contamination		Completed:______X____
  6.1.8  Check scrub brush height in both modules	Completed:______X____
  Comments:   Inside brush heights  - Front -  335  rear - 350          
              Outside brush heights - Front -  315  rear - 350
    
           
                                                                         
 | 
| 46.21 | WEEKLY PM FOR WW34 COMPLETED | SUBPAC::BJUBINVILLE | NFD Fire - Rescue | Fri Feb 23 1996 06:06 | 27 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 2/23/96   SYSTEM RTC CODE: CMP-SCRUB.A1  TECH. NAME: BJ
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:_____X____
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:_____35___
  6.1.3  Check the Drip Pan for contamination           Completed:______X____
  6.1.4  Check all tubing/fittings for leaks		Completed:______X____
  6.1.5  Check all wafer transport belts		Completed:______X____
  6.1.6  Clean the Send module and Scrub modules  	Completed:______X____
  6.1.7  Check scrub brushes for contamination		Completed:______X____
  6.1.8  Check scrub brush height in both modules	Completed:______X____
  Comments:   Inside brush heights  - Front -  335  rear - 350          
              Outside brush heights - Front -  315  rear - 350
    
              Found front lower roller arm broken in the inside
              brush station
                                                                         
 | 
| 46.22 | ww35 weekly pm completed | FABSIX::L_SHKOLNIKOV |  | Thu Feb 29 1996 02:48 | 24 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 2/29/96   SYSTEM RTC CODE: CMP-SCRUB.A1   TECH. NAME: Leon
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:_ 50 psi 
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:_ 35 psi
  6.1.3  Check the Drip Pan for contamination           Completed:___x____
  6.1.4  Check all tubing/fittings for leaks		Completed:___x____
  6.1.5  Check all wafer transport belts		Completed:___x____
  6.1.6  Clean the Send module and Scrub modules  	Completed:___x____
  6.1.7  Check scrub brushes for contamination		Completed:___x____
  6.1.8  Check scrub brush height in both modules	Completed:___x____
  Comments:____Brush heights  Outside Rear 350 Outside front 315
	                       Inside rear 350  Inside front 335
                                                                       
 | 
| 46.23 | weekly pm ww36 | FABSIX::B_FINN |  | Mon Mar 04 1996 19:17 | 28 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 3/4/96   SYSTEM RTC CODE: CMP-SCRUB.A1   TECH. NAME: a shift
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:_ 50 psi 
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:_ 35 psi
  6.1.3  Check the Drip Pan for contamination           Completed:___x____
  6.1.4  Check all tubing/fittings for leaks		Completed:___x____
  6.1.5  Check all wafer transport belts		Completed:___x____
  6.1.6  Clean the Send module and Scrub modules  	Completed:___x____
  6.1.7  Check scrub brushes for contamination		Completed:___x____
  6.1.8  Check scrub brush height in both modules	Completed:___x____
  Comments:    Brush heights  Outside Rear 350 Outside front 315
	                       Inside rear 350  Inside front 335
	       Adjusted exit drips for inner and outer clean stations
	       
                                                                       
 | 
| 46.24 | WEEKLY PM COMPLETED FOR WW37 | SUBPAC::BJUBINVILLE | NFD Fire - Rescue | Mon Mar 11 1996 14:03 | 27 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 3/11/96   SYSTEM RTC CODE: CMP-SCRUB.A1   TECH. NAME: Doc & BJ
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:_ 50 psi 
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:_ 37 psi
  6.1.3  Check the Drip Pan for contamination           Completed:___x____
  6.1.4  Check all tubing/fittings for leaks		Completed:___x____
  6.1.5  Check all wafer transport belts		Completed:___x____
  6.1.6  Clean the Send module and Scrub modules  	Completed:___x____
  6.1.7  Check scrub brushes for contamination		Completed:___x____
  6.1.8  Check scrub brush height in both modules	Completed:___x____
  Comments:    Brush heights  Outside Rear 350 Outside front 315
	                       Inside rear 350  Inside front 335
	       Adjusted drips for spin station 
                                                                       
 | 
| 46.25 | weekly ww38 | STRATA::RIDLON | Eliminate the obvious | Sun Mar 17 1996 21:49 | 26 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 3/17/96   SYSTEM RTC CODE: CMP-SCRUB.A1   TECH. NAME: B shift
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:_ 50 psi 
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:_ 35 psi
  6.1.3  Check the Drip Pan for contamination           Completed:___x____
  6.1.4  Check all tubing/fittings for leaks		Completed:___x____
  6.1.5  Check all wafer transport belts		Completed:___x____
  6.1.6  Clean the Send module and Scrub modules  	Completed:___x____
  6.1.7  Check scrub brushes for contamination		Completed:___x____
  6.1.8  Check scrub brush height in both modules	Completed:___x____
  Comments:    Brush heights  Outside Rear 350 Outside front 315
	                       Inside rear 350  Inside front 335
                                                                       
 | 
| 46.26 | WW39 Weekly PM | FABSIX::R_POIRIER |  | Sun Mar 24 1996 01:11 | 26 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 3/24/96   SYSTEM RTC CODE: CMP-SCRUB.A1   TECH. NAME: B shift
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:_ 50 psi 
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:_ 35 psi
  6.1.3  Check the Drip Pan for contamination           Completed:___x____
  6.1.4  Check all tubing/fittings for leaks		Completed:___x____
  6.1.5  Check all wafer transport belts		Completed:___x____
  6.1.6  Clean the Send module and Scrub modules  	Completed:___x____
  6.1.7  Check scrub brushes for contamination		Completed:___x____
  6.1.8  Check scrub brush height in both modules	Completed:___x____
  Comments:    Brush heights  Outside Rear 350 Outside front 315
	                       Inside rear 350  Inside front 335
                                                                       
 | 
| 46.27 | WW 40 - Weekly style | SUBPAC::LANDRY |  | Tue Apr 02 1996 15:19 | 25 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:  4/2/96   SYSTEM RTC CODE:  CMP-SCRUB.A1  TECH. NAME:  A shift
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:____50____
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:__44/44___
  6.1.3  Check the Drip Pan for contamination           Completed:____TL_____
  6.1.4  Check all tubing/fittings for leaks		Completed:____TL_____
  6.1.5  Check all wafer transport belts		Completed:____TL_____
  6.1.6  Clean the Send module and Scrub modules  	Completed:____TL_____
  6.1.7  Check scrub brushes for contamination		Completed:____TL_____
  6.1.8  Check scrub brush height in both modules	Completed:____TL_____
  Comments:  BRUSH HEIGHTS: IB_F = 335    OB_F = 315
                            IB_R = 350    OB_R = 350
      				
 | 
| 46.28 | Weekly PM completed for WW41 | SUBPAC::BJUBINVILLE | NFD Fire - Rescue | Mon Apr 08 1996 18:56 | 25 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:  4/8/96   SYSTEM RTC CODE:  CMP-SCRUB.A1  TECH. NAME:  A shift
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:___50____
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:___38____
  6.1.3  Check the Drip Pan for contamination           Completed:____X_____
  6.1.4  Check all tubing/fittings for leaks		Completed:____X_____
  6.1.5  Check all wafer transport belts		Completed:____X_____
  6.1.6  Clean the Send module and Scrub modules  	Completed:____X_____
  6.1.7  Check scrub brushes for contamination		Completed:____X_____
  6.1.8  Check scrub brush height in both modules	Completed:____X_____
  Comments:  BRUSH HEIGHTS: IB_F = 335    OB_F = 315
                            IB_R = 350    OB_R = 350
      				
             Bottom rear roller arm replaced in Outside brush station
 | 
| 46.29 | WW42 WEEKLY COMPLETED | STRATA::WESTPHAL |  | Thu Apr 18 1996 19:27 | 28 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 18 APR 96 SYSTEM RTC CODE:SCRUB-CMP.A1  TECH. NAME: WESTPHAL/SWENSON
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:___50_____
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:___41_____
  6.1.3  Check the Drip Pan for contamination           Completed:____X______
  6.1.4  Check all tubing/fittings for leaks		Completed:____X______
  6.1.5  Check all wafer transport belts		Completed:____X______
  6.1.6  Clean the Send module and Scrub modules  	Completed:____X______
  6.1.7  Check scrub brushes for contamination		Completed:____X______
  6.1.8  Check scrub brush height in both modules	Completed:____X______
                                        FRONT   REAR
                  INNER BRUSH STATION    335     350
	 	  OUTER BRUSH STATION    315     350
  Comments:   Inside brush station right upper arm has a crack in it.  The part
  	      been ordered by engineering.
                                                                     
 | 
| 46.30 | ww43 pm completed | FABSIX::L_SHKOLNIKOV |  | Wed Apr 24 1996 22:07 | 29 | 
|  | --------------------------------------------------------------------------------
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 04/24/96   SYSTEM RTC CODE: CMP-SCRUB.A1   TECH. NAME: D shift
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:_ 50 psi 
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:_ 38 psi
  6.1.3  Check the Drip Pan for contamination           Completed:___x____
  6.1.4  Check all tubing/fittings for leaks		Completed:___x____
  6.1.5  Check all wafer transport belts		Completed:___x____
  6.1.6  Clean the Send module and Scrub modules  	Completed:___x____
  6.1.7  Check scrub brushes for contamination		Completed:___x____
  6.1.8  Check scrub brush height in both modules	Completed:___x____
  Comments:    Brush heights  Outside Rear 350 Outside front 315
	                       Inside rear 350  Inside front 335
            ** The water coming out from outside brush sration shaft
               assembly onto the motor that rotates the rollers.
               Will repair when manufacturing give us a time to do that.
 | 
| 46.31 | WW44 Wekly PM | FABSIX::R_POIRIER |  | Mon Apr 29 1996 00:57 | 30 | 
|  | --------------------------------------------------------------------------------
--------------------------------------------------------------------------------
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 04/28/96   SYSTEM RTC CODE: CMP-SCRUB.A1   TECH. NAME: B shift
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:_ 50 psi 
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:_    psi
  6.1.3  Check the Drip Pan for contamination           Completed:___x____
  6.1.4  Check all tubing/fittings for leaks		Completed:___x____
  6.1.5  Check all wafer transport belts		Completed:___x____
  6.1.6  Clean the Send module and Scrub modules  	Completed:___x____
  6.1.7  Check scrub brushes for contamination		Completed:___x____
  6.1.8  Check scrub brush height in both modules	Completed:___x____
  Comments:    Brush heights  Outside Rear 350 Outside front 315
	                       Inside rear 350  Inside front 335
	Found a water leak in the drain shaft of the Outside Brush station.
  	There is a hole in the shaft. A new tub will be needed. We filled
	the hole with Silicone and it is keeping the water in.
 | 
| 46.32 | ww45 S/A PM completed? | FABSIX::L_SHKOLNIKOV |  | Thu May 09 1996 05:51 | 50 | 
|  |                OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
            Semi-Annual Preventative Maintenance Check Sheet, Rev D
 DATE: 5/9/96      SYSTEM RTC CODE:cmp-scrub.A1  TECH. NAME: L.S.           
  6.1    Perform Weekly PM                              Completed:___X____
                                                        
  6.3    Perform Quarterly PM                           Completed:___x____
  6.4.1  Check all EMO's for functionality		Completed:___X____
  6.4.2  Check all interlocks for functionality  	Completed:___X____
  6.4.3  Check heat lamp housing/wiring for defects	Completed:___X____
  6.4.4  Check the robot hardware/wiring for defects	Completed:___x____
  6.4.5  Check the spindle bearings/bushings		Completed:___X____
  6.4.6  Check the spin sta. rollers/bearings/bushings	Completed:___X____
  6.4.7  Check the brush sta. drive bearings/bushings	Completed:___X____
  6.4.8  Check the +5 VDC power supply			Pre-Adjust:   4.95
							Post-Adjust:  5.00
  6.4.9  Check the -12 VDC power supply			Pre-Adjust:   -11.96
  6.4.10 Check the +12 VDC power supply			Pre-Adjust:   +12.07
  6.4.11 Check the +24 VDC power supply			Pre-Adjust:   23.94
							Post-Adjust:  24.0    
  6.4.12 Check the +48 VDC power supply			Pre-Adjust:   48.2  
							Post-Adjust:  48.0
                                    Front     Rear
  Comments: Brush heights Outside   315       350 
                          Inside    335       350
        *** Outside brush station - water leaks through the drive shaft
            of the rear arm. Bearing parts was found under the shaft
            assembly. A new shaft will be needed.
             
 | 
| 46.33 | WW46 Wekly PM | FABSIX::L_SHKOLNIKOV |  | Tue May 14 1996 23:55 | 27 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:  5/14/96   SYSTEM RTC CODE:  CMP-SCRUB.A1  TECH. NAME:  D shift
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:__50__
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:__38__
  6.1.3  Check the Drip Pan for contamination           Completed:___X___
  6.1.4  Check all tubing/fittings for leaks		Completed:___X___
  6.1.5  Check all wafer transport belts		Completed:___X___
  6.1.6  Clean the Send module and Scrub modules  	Completed:___X___
  6.1.7  Check scrub brushes for contamination		Completed:___X___
  6.1.8  Check scrub brush height in both modules	Completed:___X___
  Comments:  BRUSH HEIGHTS: IB_F = 335    OB_F = 315
                            IB_R = 350    OB_R = 350                     
      				
            * Water still leaking through the rear drive shaft of the 
              outside brush station.  
 | 
| 46.34 | WW 47 - Weekly | SUBPAC::LANDRY |  | Sun May 19 1996 12:44 | 24 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:  5/19/96   SYSTEM RTC CODE:  CMP-SCRUB.A1  TECH. NAME:  A shift
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 38/37
  6.1.3  Check the Drip Pan for contamination           Completed:___X___
  6.1.4  Check all tubing/fittings for leaks		Completed:___X___
  6.1.5  Check all wafer transport belts		Completed:___X___
  6.1.6  Clean the Send module and Scrub modules  	Completed:___X___
  6.1.7  Check scrub brushes for contamination		Completed:___X___
  6.1.8  Check scrub brush height in both modules	Completed:___X___
  Comments:  BRUSH HEIGHTS: IB_F = 335    OB_F = 315
                            IB_R = 350    OB_R = 350                     
      				
 | 
| 46.35 | SHUTDOWN CHECKSHEET | STRATA::RIDLON | Eliminate the obvious | Mon May 27 1996 06:39 | 22 | 
|  | 
                CMP-SCRUB.A1 & CMP-SRUB.A2 SHUTDOWN CHECKSHEET
                ----------------------------------------------
                                                        Tech.       Date
                                                       -------     -------
  1.  Change RTC status to SCHEDULED DOWN.             ___B___     __5/27_
  2.  Remove all PVA scrub brushes and discard.         __B____     _______
  3.  Perform a complete wipe down and dry of
      all wet surfaces.                                ___B___     _______
  4.  Close main incoming DI Water valve to each
      system and open the DI Water return valve
      (UDR).  This will allow all incoming DI Water
      to flow to UDR.                                  ___B___     _______
  5.  Power down each system.                          ___B___     _______
  6.  Enter checksheet into notesfile.
 | 
| 46.36 | Weekly PM ** note new brushes/heights | SUBPAC::LANDRY |  | Tue May 28 1996 18:39 | 25 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 5/28/96    SYSTEM RTC CODE: CMP-SCRUB.A1   TECH. NAME: A & B shift
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 39/39
  6.1.3  Check the Drip Pan for contamination           Completed:   X
  6.1.4  Check all tubing/fittings for leaks		Completed:   X
  6.1.5  Check all wafer transport belts		Completed:   X
  6.1.6  Clean the Send module and Scrub modules  	Completed:   X
  6.1.7  Check scrub brushes for contamination		Completed:   X
  6.1.8  Check scrub brush height in both modules	Completed:   X
  Comments:  New Brushes installed at this PM.  
      	     Brush Heights:    OB-front = 315          OB-rear = 350
                               IB-front = 257          IB-rear = 328
 | 
| 46.37 | Startup Checksheet | SUBPAC::LANDRY |  | Tue May 28 1996 18:55 | 20 | 
|  |                        CMP-SCRUB.A1 STARTUP CHECKSHEET
                ----------------------------------------------
                                                        Tech.       Date
                                                       -------     -------
  1.  Ensure that all necessary facilities are
      available and ready to use.                      A shift     5/28/96
  2.  Power up each system.                            A shift     5/28/96
  3.  Open incoming DI Water Valve to each
      system.                                          A shift     5/28/96  
  4.  Close UDR valve at each system.                  A shift     5/28/96
  5.  Re-install new PVA scrub brushes.                A shift     5/28/96
  6.  Change RTC status to VERIFY and notify
      Operations that the systems are ready
      for MQC.                                         A shift     5/28/96
 | 
| 46.38 | WW49 Weekly PM | FABSIX::R_POIRIER |  | Wed Jun 05 1996 06:09 | 26 | 
|  | --------------------------------------------------------------------------------
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 6-5-96  SYSTEM RTC CODE: CMP-SCRUB.A1   TECH. NAME: B shift
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 39/39
  6.1.3  Check the Drip Pan for contamination           Completed:   X
  6.1.4  Check all tubing/fittings for leaks		Completed:   X
  6.1.5  Check all wafer transport belts		Completed:   X
  6.1.6  Clean the Send module and Scrub modules  	Completed:   X
  6.1.7  Check scrub brushes for contamination		Completed:   X
  6.1.8  Check scrub brush height in both modules	Completed:   X
  Comments:  Wiped up excess water in pan
      	     Brush Heights:    OB-front = 315          OB-rear = 350
                               IB-front = 257          IB-rear = 328
 | 
| 46.2 | Quarterly PM Checksheet Template | SUBPAC::BJUBINVILLE | CMP-6 Equipment Engineering | Tue Jun 11 1996 22:50 | 36 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Quarterly Preventative Maintenance Check Sheet, Rev D
 DATE:__________   SYSTEM RTC CODE:__________  TECH. NAME:__________________
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:__________
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:__________
  6.1.3  Check the Drip Pan for contamination           Completed:___________
  6.1.4  Check all tubing/fittings for leaks		Completed:___________
  6.1.5  Check all wafer transport belts		Completed:___________
  6.1.6  Clean the Send module and Scrub modules  	Completed:___________
  6.1.7  Check scrub brushes for contamination		Completed:___________
  6.1.8  Check scrub brush height in both modules	Completed:___________
  6.3.1  Check muffin fans for functionality		Completed:___________
  6.3.2  Check motor drive belts for defects		Completed:___________
  6.3.3  Check the robot knife for loose hardware	Completed:___________
  6.3.4  Check the spin station grippers		Completed:___________
  6.3.5  Check the motor speed output readings		Completed:___________
  Comments:__________________________________________________________________
           __________________________________________________________________
           __________________________________________________________________
 | 
| 46.3 | Semi-Annual PM Checksheet Template | SUBPAC::BJUBINVILLE | CMP-6 Equipment Engineering | Tue Jun 11 1996 22:51 | 66 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
         Semi-Annual Preventative Maintenance Check Sheet, Rev D
 DATE:__________   SYSTEM RTC CODE:__________  TECH. NAME:__________________
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:__________
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:__________
  6.1.3  Check the Drip Pan for contamination           Completed:___________
  6.1.4  Check all tubing/fittings for leaks		Completed:___________
  6.1.5  Check all wafer transport belts		Completed:___________
  6.1.6  Clean the Send module and Scrub modules  	Completed:___________
  6.1.7  Check scrub brushes for contamination		Completed:___________
  6.1.8  Check scrub brush height in both modules	Completed:___________
  6.3.1  Check muffin fans for functionality		Completed:___________
  6.3.2  Check motor drive belts for defects		Completed:___________
  6.3.3  Check the robot knife for loose hardware	Completed:___________
  6.3.4  Check the spin station grippers		Completed:___________
  6.3.5  Check the motor speed output readings		Completed:___________
  6.4.1  Check all EMO's for functionality		Completed:___________
  6.4.2  Check all interlocks for functionality  	Completed:___________
  6.4.3  Check heat lamp housing/wiring for defects	Completed:___________
  6.4.4  Check the robot hardware/wiring for defects	Completed:___________
  6.4.5  Check the spindle bearings/bushings		Completed:___________
  6.4.6  Check the spin sta. rollers/bearings/bushings	Completed:___________
  6.4.7  Check the brush sta. drive bearings/bushings	Completed:___________
  6.4.8  Check the +5 VDC power supply			Pre-Adjust:__________
							Post-Adjust:_________
  6.4.9  Check the -12 VDC power supply			Pre-Adjust:__________
  6.4.10 Check the +12 VDC power supply			Pre-Adjust:__________
  6.4.11 Check the +24 VDC power supply			Pre-Adjust:__________
							Post-Adjust:_________
  6.4.12 Check the +48 VDC power supply			Pre-Adjust:__________
							Post-Adjust:_________
  Comments:__________________________________________________________________
           __________________________________________________________________
           __________________________________________________________________
 | 
| 46.39 | Weekly PM for WW50 completed | SUBPAC::BJUBINVILLE | CMP-6 Equipment Engineering | Tue Jun 11 1996 23:33 | 26 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 6/11/96  SYSTEM RTC CODE: CMP-SCRUB.A1   TECH. NAME: BJ
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  40
  6.1.3  Check the Drip Pan for contamination           Completed:   X
  6.1.4  Check all tubing/fittings for leaks		Completed:   X
  6.1.5  Check all wafer transport belts		Completed:   X
  6.1.6  Clean the Send module and Scrub modules  	Completed:   X
  6.1.7  Check scrub brushes for contamination		Completed:   X
  6.1.8  Check scrub brush height in both modules	Completed:   X
  Comments:  Found DI water in drip pan.  Source is from manifold
             area but unable to trace exact source.
      	     Brush Heights:    OB-front = 315          OB-rear = 350
                               IB-front = 257          IB-rear = 328
 | 
| 46.40 | WW 51 - Weekly | SUBPAC::LANDRY |  | Sun Jun 16 1996 16:52 | 30 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 6/11/96  SYSTEM RTC CODE: CMP-SCRUB.A1   TECH. NAME: A shift
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 38/39
  6.1.3  Check the Drip Pan for contamination           Completed:   X
  6.1.4  Check all tubing/fittings for leaks		Completed:   X
  6.1.5  Check all wafer transport belts		Completed:   X
  6.1.6  Clean the Send module and Scrub modules  	Completed:   X
  6.1.7  Check scrub brushes for contamination		Completed:   X
  6.1.8  Check scrub brush height in both modules	Completed:   X
  Comments:  Small amount of DI water found in the drip pan.  Cleaned
             up and checked for leaks.  Unable to locate cause.
             Found two drip manifolds not dripping as should.  The OB
             entrance manifold and the IB exit manifold needed to be
             turned up to allow proper drip.
      	     Brush Heights:    OB-front = 315          OB-rear = 350
                               IB-front = 257          IB-rear = 328
 | 
| 46.41 | WW52 Weekly PM | FABSIX::R_POIRIER |  | Mon Jun 24 1996 01:47 | 28 | 
|  | --------------------------------------------------------------------------------
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 6/24/96  SYSTEM RTC CODE: CMP-SCRUB.A1   TECH. NAME: B shift
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 39/39
  6.1.3  Check the Drip Pan for contamination           Completed:   X
  6.1.4  Check all tubing/fittings for leaks		Completed:   X
  6.1.5  Check all wafer transport belts		Completed:   X
  6.1.6  Clean the Send module and Scrub modules  	Completed:   X
  6.1.7  Check scrub brushes for contamination		Completed:   X
  6.1.8  Check scrub brush height in both modules	Completed:   X
  Comments:  Small amount of DI water found in the drip pan.  Cleaned
             up and checked for leaks.  
      	     Brush Heights:    OB-front = 315          OB-rear = 350
                               IB-front = 257          IB-rear = 328
 | 
| 46.42 | weekly p.m. | FABSIX::R_GEE |  | Tue Jul 02 1996 02:04 | 27 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 7/02/96  SYSTEM RTC CODE: CMP-SCRUB.A1   TECH. NAME: B shift
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 39/39
  6.1.3  Check the Drip Pan for contamination           Completed:   X
  6.1.4  Check all tubing/fittings for leaks		Completed:   X
  6.1.5  Check all wafer transport belts		Completed:   X
  6.1.6  Clean the Send module and Scrub modules  	Completed:   X
  6.1.7  Check scrub brushes for contamination		Completed:   X
  6.1.8  Check scrub brush height in both modules	Completed:   X
  Comments:  Small amount of DI water found in the drip pan.  Cleaned
             up and checked for leaks.  
      	     Brush Heights:    OB-front = 315          OB-rear = 350
                               IB-front = 313          IB-rear = 388
 | 
| 46.43 | SCRUB.A1 SHUT-DOWN COMPLETED | SUBPAC::BJUBINVILLE | CMP-6 Equipment Engineering | Thu Jul 04 1996 02:30 | 24 | 
|  | 
                CMP-SCRUB.A1 SHUTDOWN CHECKSHEET
                --------------------------------
                                                        Tech        Date
                                                       -------     -------
  1.  Change RTC status to SCHEDULED DOWN.               BJ         7/3/96
  2.  Close main incoming DI Water valve(s) to each
      system and open the DI Water return valve
      (UDR).  This will allow all incoming DI Water
      to flow to UDR.                                    BJ         7/3/96
  3.  Remove all PVA scrub brushes and submerge          BJ         7/3/96
      in DI water.
  4.  Perform a complete wipe down and dry of
      all wet surfaces.                                  BJ         7/3/96
  5.  Power down each system.                            BJ         7/3/96
  6.  Enter checksheet into notesfile.                   BJ         7/3/96
 | 
| 46.44 | Startup check sheet. | FABSIX::L_SHKOLNIKOV |  | Fri Jul 05 1996 22:45 | 24 | 
|  | 
                CMP-SCRUB.A1 STARTUP CHECKSHEET
                --------------------------------                
 DATE 7/5/96                                    TECH. NAME: Leon
  1.  Ensure that all necessary facilities are
      available and ready to use.                      ___X___
  2.  Power up system.                                 ___X___
  3.  Re-install PVA scrub brushes.                    ___X____
  4.  Open incoming DI Water Valve(s) 
      system.                                          ___X___
  5.  Close UDR valve at system.                       ___X___
  6.  Change RTC status to VERIFY and notify
      Operations that the systems are ready
      for MQC.                                         ___X___
                                      
 | 
| 46.45 | WW 2 / FY97 - Weekly | SUBPAC::LANDRY |  | Sun Jul 07 1996 16:12 | 32 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 7/7/96  SYSTEM RTC CODE: CMP-SCRUB.A1   TECH. NAME: A shift
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 32/32
  6.1.3  Check the Drip Pan for contamination           Completed:   X
  6.1.4  Check all tubing/fittings for leaks		Completed:   X
  6.1.5  Check all wafer transport belts		Completed:   X
  6.1.6  Clean the Send module and Scrub modules  	Completed:   X
  6.1.7  Check scrub brushes for contamination		Completed:   X
  6.1.8  Check scrub brush height in both modules	Completed:   X
  Comments:  Small amount of DI water found in the drip pan.  Could not 
             locate the source.  Checked flow meter fittings for tightness.
      	     Found the brush splash guards lying in the bottom of both the
             IB + OB stations.  Re-installed
      	     Found the OB Exit + IB Exit drip manifolds shut off.  Re-setup
             for proper drip.
      	     Brush Heights:    OB-front = 315          OB-rear = 350
                               IB-front = 313          IB-rear = 388
 | 
| 46.46 | ww03 weekly pm | FABSIX::R_POIRIER |  | Wed Jul 17 1996 04:20 | 26 | 
|  | --------------------------------------------------------------------------------
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 7/17/96  SYSTEM RTC CODE: CMP-SCRUB.A1   TECH. NAME: B Shift
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 38/38
  6.1.3  Check the Drip Pan for contamination           Completed:   X
  6.1.4  Check all tubing/fittings for leaks		Completed:   X
  6.1.5  Check all wafer transport belts		Completed:   X
  6.1.6  Clean the Send module and Scrub modules  	Completed:   X
  6.1.7  Check scrub brushes for contamination		Completed:   X
  6.1.8  Check scrub brush height in both modules	Completed:   X
  Comments:  Small amount of DI water found in the drip pan. 
      	     Brush Heights:    OB-front = 315          OB-rear = 350
                               IB-front = 313          IB-rear = 388
 | 
| 46.47 | ww04 weekly pm | FABSIX::L_SHKOLNIKOV |  | Fri Jul 26 1996 05:45 | 27 | 
|  |          OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 7/26/96  SYSTEM RTC CODE: CMP-SCRUB.A1   TECH. NAME: D shift
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 40/40
  6.1.3  Check the Drip Pan for contamination           Completed:   X
  6.1.4  Check all tubing/fittings for leaks		Completed:   X
  6.1.5  Check all wafer transport belts		Completed:   X
  6.1.6  Clean the Send module and Scrub modules  	Completed:   X
  6.1.7  Check scrub brushes for contamination		Completed:   X
  6.1.8  Check scrub brush height in both modules	Completed:   X
  Comments:  Small amount of DI water found in the drip pan.  Could not 
             locate the source.  Checked fittings for tightness.
             Will take a close look when manufacturing give us the time.
                                 OB      IB
      	   Brush Heights: rear   350     388
                          front  315     313
 | 
| 46.48 | WW V - Weekly variety | SUBPAC::LANDRY |  | Mon Jul 29 1996 12:56 | 27 | 
|  |          OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 7/29/96  SYSTEM RTC CODE: CMP-SCRUB.A1   TECH. NAME: A shift
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 37 / 37
  6.1.3  Check the Drip Pan for contamination           Completed:   X
  6.1.4  Check all tubing/fittings for leaks		Completed:   X
  6.1.5  Check all wafer transport belts		Completed:   X
  6.1.6  Clean the Send module and Scrub modules  	Completed:   X
  6.1.7  Check scrub brushes for contamination		Completed:   X
  6.1.8  Check scrub brush height in both modules	Completed:   X
  Comments:  Found a puddle in the drip pan.  Traced the source to the OB
             station drip regulator, where the fitting needed to be re-taped.
                                 OB      IB
      	   Brush Heights: rear   350     388
                          front  315     313
 | 
| 46.49 | QUARTERLY PM FOR WW6 COMPLETED | SUBPAC::BJUBINVILLE | CMP-6 Equipment Engineering | Wed Aug 07 1996 22:42 | 34 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Quarterly Preventative Maintenance Check Sheet, Rev D
 DATE: 8/7/96   SYSTEM RTC CODE: CMP-SCRUB.A1  TECH/SHIFT: D
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 37/35
  6.1.3  Check the Drip Pan for contamination           Completed:____X______   
  6.1.4  Check all tubing/fittings for leaks		Completed:____X______
  6.1.5  Check all wafer transport belts		Completed:____X______
  6.1.6  Clean the Send module and Scrub modules  	Completed:____X______
  6.1.7  Check scrub brushes for contamination		Completed:____X______
  6.1.8  Check scrub brush height in both modules	Completed:____X______
  6.3.1  Check muffin fans for functionality		Completed:____X______
  6.3.2  Check motor drive belts for defects		Completed:____X______
  6.3.3  Check the robot knife for loose hardware	Completed:____X______
  6.3.4  Check the spin station grippers		Completed:____X______
  6.3.5  Check the motor speed output readings		Completed:____X______
  Comments:                                                           
    
                                                                      
 | 
| 46.50 | WW VII - Weekly version | SUBPAC::LANDRY |  | Sun Aug 11 1996 17:10 | 29 | 
|  |          OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 8/11/96      SYSTEM RTC CODE: CMP-SCRUB.A1    TECH. NAME: A shift
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 38 / 37
  6.1.3  Check the Drip Pan for contamination           Completed:   X
  6.1.4  Check all tubing/fittings for leaks		Completed:   X
  6.1.5  Check all wafer transport belts		Completed:   X
  6.1.6  Clean the Send module and Scrub modules  	Completed:   X
  6.1.7  Check scrub brushes for contamination		Completed:   X
  6.1.8  Check scrub brush height in both modules	Completed:   X
  Comments:  Found a small puddle in the drip pan.
      	     Adjusted the IB spray manifold's drip flow.  It was way to
             high, flowing freely. 
                                 OB      IB
      	   Brush Heights: rear   350     388
                          front  315     313
 | 
| 46.51 | WW8 Weekly PM | FABSIX::R_POIRIER |  | Mon Aug 19 1996 23:04 | 28 | 
|  | --------------------------------------------------------------------------------
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 8/19/96      SYSTEM RTC CODE: CMP-SCRUB.A1    TECH. NAME: B shift
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 38 / 37
  6.1.3  Check the Drip Pan for contamination           Completed:   X
  6.1.4  Check all tubing/fittings for leaks		Completed:   X
  6.1.5  Check all wafer transport belts		Completed:   X
  6.1.6  Clean the Send module and Scrub modules  	Completed:   X
  6.1.7  Check scrub brushes for contamination		Completed:   X
  6.1.8  Check scrub brush height in both modules	Completed:   X
  Comments:  Found a small puddle in the drip pan.
                                 OB      IB
      	   Brush Heights: rear   350     388
                          front  315     313
 | 
| 46.52 | WW IX - Weekly version | SUBPAC::LANDRY |  | Sun Aug 25 1996 13:28 | 25 | 
|  |          OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 8/25/96      SYSTEM RTC CODE: CMP-SCRUB.A1    TECH. NAME: A shift
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  52
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 38 / 38
  6.1.3  Check the Drip Pan for contamination           Completed:   X
  6.1.4  Check all tubing/fittings for leaks		Completed:   X
  6.1.5  Check all wafer transport belts		Completed:   X
  6.1.6  Clean the Send module and Scrub modules  	Completed:   X
  6.1.7  Check scrub brushes for contamination		Completed:   X
  6.1.8  Check scrub brush height in both modules	Completed:   X
  Comments:  
                                 OB      IB
      	   Brush Heights: Front  315     313
                          Rear   350     388
 | 
| 46.53 | WW X - Weekly version | SUBPAC::LANDRY |  | Sun Sep 01 1996 13:41 | 28 | 
|  |          OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 9/1/96      SYSTEM RTC CODE: CMP-SCRUB.A1    TECH. NAME: A shift
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 38 / 38
  6.1.3  Check the Drip Pan for contamination           Completed:   X
  6.1.4  Check all tubing/fittings for leaks		Completed:   X
  6.1.5  Check all wafer transport belts		Completed:   X
  6.1.6  Clean the Send module and Scrub modules  	Completed:   X
  6.1.7  Check scrub brushes for contamination		Completed:   X
  6.1.8  Check scrub brush height in both modules	Completed:   X
  Comments:  Found fluid in the drip pan.  Wiped up.  Could not locate
             the source of the fluid.  Re-tightened fluid manifold
             fittings.
                                 OB      IB
      	   Brush Heights: Front  315     313
                          Rear   350     388
 | 
| 46.54 | CMP-SCRUB.A1 SHUTDOWN CHECKSHEET | FABSIX::R_POIRIER |  | Mon Sep 02 1996 01:55 | 20 | 
|  | 
                CMP-SCRUB.A1/.A1/.A3/.C1-7 SHUTDOWN CHECKSHEET
                ----------------------------------------------
                                                        Tech.       Date
                                                       -------     -------
  1.  Close main incoming DI Water valve to each
      system and open the DI Water return valve
      (UDR).  This will allow all incoming DI Water
      to flow to UDR.                                  ___B___     _9/1/96_
  2.  Remove all PVA scrub brushes and submerge
      in DI water. Label each brush with the
      tool name.                                       ___B___     _9/1/96_
  3.  Perform a complete wipe down and dry of
      all wet surfaces.                                ___B___     _9/1/96_
  4.  Power down each system.                          ___B___     _9/1/96_
  5.  Enter checksheet into notesfile.                 ___B___     _9/1/96_
 | 
| 46.55 | start up | FABSIX::B_FINN |  | Tue Sep 03 1996 19:16 | 24 | 
|  | 
                CMP-SCRUB.A1 STARTUP CHECKSHEET
                --------------------------------                
 DATE 9/3/96                                    TECH. NAME: A shift
  1.  Ensure that all necessary facilities are
      available and ready to use.                      ___X___
  2.  Power up system.                                 ___X___
  3.  Re-install PVA scrub brushes.                    ___X____
  4.  Open incoming DI Water Valve(s) 
      system.                                          ___X___
  5.  Close UDR valve at system.                       ___X___
  6.  Change RTC status to VERIFY and notify
      Operations that the systems are ready
      for MQC.                                         ___X___
                                      
 | 
| 46.56 | WW XI - Weekly | SUBPAC::LANDRY |  | Sun Sep 08 1996 17:18 | 27 | 
|  |          OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 9/8/96      SYSTEM RTC CODE: CMP-SCRUB.A1    TECH. NAME: A shift
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 37 / 36
  6.1.3  Check the Drip Pan for contamination           Completed:   X
  6.1.4  Check all tubing/fittings for leaks		Completed:   X
  6.1.5  Check all wafer transport belts		Completed:   X
  6.1.6  Clean the Send module and Scrub modules  	Completed:   X
  6.1.7  Check scrub brushes for contamination		Completed:   X
  6.1.8  Check scrub brush height in both modules	Completed:   X
  Comments:  Found excessive drip (actually a small flow) in the IB exit 
             spray manifold.  Re-setup for proper drip.
 
                                 OB      IB
      	   Brush Heights: Front  315     313
                          Rear   350     388
 | 
| 46.57 | WW XII - Weekly | SUBPAC::LANDRY |  | Sun Sep 15 1996 17:50 | 33 | 
|  |          OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 9/15/96      SYSTEM RTC CODE: CMP-SCRUB.A1    TECH. NAME: A shift
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 38 / 37
  6.1.3  Check the Drip Pan for contamination           Completed:   X
  6.1.4  Check all tubing/fittings for leaks		Completed:   X
  6.1.5  Check all wafer transport belts		Completed:   X
  6.1.6  Clean the Send module and Scrub modules  	Completed:   X
  6.1.7  Check scrub brushes for contamination		Completed:   X
  6.1.8  Check scrub brush height in both modules	Completed:   X
  Comments:  Found a small puddle of DI water in the catch pan.  The source
             was identified as the teflon valve for the IB entrance rinse.
             The fittings were tightened.  No leaks have re-appeared at this
             time.
             Also rebuilt the rollers for the wafer transport belt in the OB
      	     station.  The bearings were replaced and the rod + roller were
             cleaned up.
 
                                 OB      IB
      	   Brush Heights: Front  315     313
                          Rear   350     388
 | 
| 46.58 | WW13 Weekly PM | FABSIX::R_POIRIER |  | Sun Sep 22 1996 06:06 | 29 | 
|  | --------------------------------------------------------------------------------
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 9/22/96      SYSTEM RTC CODE: CMP-SCRUB.A1    TECH. NAME: B shift
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 39 / 39
  6.1.3  Check the Drip Pan for contamination           Completed:   X
  6.1.4  Check all tubing/fittings for leaks		Completed:   X
  6.1.5  Check all wafer transport belts		Completed:   X
  6.1.6  Clean the Send module and Scrub modules  	Completed:   X
  6.1.7  Check scrub brushes for contamination		Completed:   X
  6.1.8  Check scrub brush height in both modules	Completed:   X
  Comments:  Found and wiped up a small puddle in the catch pan.  
	     Not sure of source.
                                 OB      IB
      	   Brush Heights: Front  315     348
                          Rear   350     388
 | 
| 46.59 | WEEKLY PM FOR WW14 COMPLETED | FABSIX::B_JUBINVILLE |  | Fri Oct 04 1996 05:14 | 30 | 
|  |     
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 10/4/96      SYSTEM RTC CODE: CMP-SCRUB.A1    TECH. NAME: D shift
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 38 / 38
  6.1.3  Check the Drip Pan for contamination           Completed:   X
  6.1.4  Check all tubing/fittings for leaks		Completed:   X
  6.1.5  Check all wafer transport belts		Completed:   X
  6.1.6  Clean the Send module and Scrub modules  	Completed:   X
  6.1.7  Check scrub brushes for contamination		Completed:   X
  6.1.8  Check scrub brush height in both modules	Completed:   X
  Comments:  IB-F height was found at 347, not note as to why it was 
             changed so it was moved backed to 313 and the height was   
             checked which was still ok.
	    
                                  OB      IB
      	   Brush Heights: Front  315     313    
                          Rear   350     388
                                        
 | 
| 46.60 | WW XV - Weekly completed | SUBPAC::LANDRY |  | Wed Oct 09 1996 10:59 | 27 | 
|  |     
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 10/9/96      SYSTEM RTC CODE: CMP-SCRUB.A1    TECH. NAME: A shift
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  38
  6.1.3  Check the Drip Pan for contamination           Completed:   X
  6.1.4  Check all tubing/fittings for leaks		Completed:   X
  6.1.5  Check all wafer transport belts		Completed:   X
  6.1.6  Clean the Send module and Scrub modules  	Completed:   X
  6.1.7  Check scrub brushes for contamination		Completed:   X
  6.1.8  Check scrub brush height in both modules	Completed:   X
  Comments:	    
                                  OB      IB
      	   Brush Heights: Front  315     313    
                          Rear   350     388
                                        
 | 
| 46.61 | WW 16 weekly p.m. completed | FABSIX::R_GEE |  | Mon Oct 14 1996 17:03 | 30 | 
|  |     
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 10/14/96      SYSTEM RTC CODE: CMP-SCRUB.A1    TECH. NAME: A shift
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  38
  6.1.3  Check the Drip Pan for contamination           Completed:   X
  6.1.4  Check all tubing/fittings for leaks		Completed:   X
  6.1.5  Check all wafer transport belts		Completed:   X
  6.1.6  Clean the Send module and Scrub modules  	Completed:   X
  6.1.7  Check scrub brushes for contamination		Completed:   X
  6.1.8  Check scrub brush height in both modules	Completed:   X
  Comments:	    
                                  OB      IB
      	   Brush Heights: Front  315     313    
                          Rear   350     388
           ----------------------------------
	   IB station bottom brush wasn't rotating properly, replaced the
	   bearings and slightly repositioned the motor for smooth rotation.
 | 
| 46.62 | WW XVII - Weekly completed | SUBPAC::LANDRY |  | Sun Oct 20 1996 17:17 | 28 | 
|  |     
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 10/20/96   SYSTEM RTC CODE: CMP-SCRUB.A1   TECH. NAME: Gee / Landry
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  39
  6.1.3  Check the Drip Pan for contamination           Completed:   X
  6.1.4  Check all tubing/fittings for leaks		Completed:   X
  6.1.5  Check all wafer transport belts		Completed:   X
  6.1.6  Clean the Send module and Scrub modules  	Completed:   X
  6.1.7  Check scrub brushes for contamination		Completed:   X
  6.1.8  Check scrub brush height in both modules	Completed:   X
  Comments:	    
                                  OB      IB
      	   Brush Heights: Front  315     313    
                          Rear   350     387
           ----------------------------------
 | 
| 46.63 | weekly pm 10/27/96 ww18 | STRATA::RIDLON | Eliminate the oblivious | Sun Oct 27 1996 01:41 | 31 | 
|  | 
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 10/27/96   SYSTEM RTC CODE: CMP-SCRUB.A1   TECH. NAME: Ridlon
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  39
  6.1.3  Check the Drip Pan for contamination           Completed:   X
  6.1.4  Check all tubing/fittings for leaks		Completed:   X
  6.1.5  Check all wafer transport belts		Completed:   X
  6.1.6  Clean the Send module and Scrub modules  	Completed:   X
  6.1.7  Check scrub brushes for contamination		Completed:   X
  6.1.8  Check scrub brush height in both modules	Completed:   X
  Comments:	    
                                  OB      IB
      	   Brush Heights: Front  270     345    
                          Rear   310     345
     BRUSHES CHANGED ON 10/21 HENCE THE DIFFERENCE IN BRUSH
     HEIGHTS FROM LAST WEEKS WEEKLY PM. 
           ----------------------------------
 | 
| 46.64 | ww19 Semi Annual PM | ASDG::POIRIER |  | Fri Nov 08 1996 18:34 | 109 | 
|  |                     -< SEMI-ANNUAL PM CHECKSHEET >-
           OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
            Semi-Annual Preventative Maintenance Check Sheet, Rev D
 DATE: 10/7/96   SYSTEM RTC CODE: CMP-SCRUB.A1  TECH NAME/S: Brad Westphal
                                                             John Poirier
  6.1    Perform Weekly PM                              Completed:___X_______
                                                        
  6.3    Perform Quarterly PM                           Completed:___X_______
  6.4.1  Check all EMO's for functionality		Completed:___X_______
  6.4.2  Check all interlocks for functionality  	Completed:___X_______
  6.4.3  Check heat lamp housing/wiring for defects	Completed:___X_______
  6.4.4  Check the robot hardware/wiring for defects	Completed:___X_______
  6.4.5  Check the spindle bearings/bushings		Completed:___X_______
  6.4.6  Check the spin sta. rollers/bearings/bushings	Completed:___X_______
  6.4.7  Check the brush sta. drive bearings/bushings	Completed:___X_______
  6.4.8  Check the +5 VDC power supply			Pre-Adjust:__5v______
							Post-Adjust:_N/A_____
  6.4.9  Check the -12 VDC power supply			Pre-Adjust:__12v_____
  6.4.10 Check the +12 VDC power supply			Pre-Adjust:__N/A_____
  6.4.11 Check the +24 VDC power supply			Pre-Adjust:__23.99v__
							Post-Adjust:_N/A_____
  6.4.12 Check the +48 VDC power supply			Pre-Adjust:__48.1v___
							Post-Adjust:_N/A_____
  COMMENTS:
            Note:  N/A = No adjustment necessary.
       
--------------------------------------------------------------------------------
                     -< QUARTERLY PM CHECKSHEET >-
           OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
             Quarterly Preventative Maintenance Check Sheet, Rev D
 DATE: 10/7/96   SYSTEM RTC CODE: CMP-SCRUB.A1  TECH NANE/S: Brad Westphal
                                                             John Poirier
  6.1    Perform Weekly PM                              Completed:____X______
  6.3.1  Check muffin fans for functionality		Completed:____X______
  6.3.2  Check motor drive belts for defects		Completed:____X______
  6.3.3  Check the robot knife for loose hardware	Completed:____X______
  6.3.4  Check the spin station grippers		Completed:____X______
  6.3.5  Check the motor speed output readings		Completed:____X______
  Comments:__________________________________________________________________
           __________________________________________________________________
           __________________________________________________________________
--------------------------------------------------------------------------------
                       -< WEEKLY PM CHECKSHEET >--
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 10/7/96   SYSTEM RTC CODE: CMP-SCRUB.A1  TECH NAME/S: Brad Westphal
                                                             John Poirier
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:___50_____
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:___40_____
  6.1.3  Check the Drip Pan for contamination           Completed:____X______*
  6.1.4  Check all tubing/fittings for leaks		Completed:____X______
  6.1.5  Check all wafer transport belts		Completed:____X______
  6.1.6  Clean the Send module and Scrub modules  	Completed:____X______
  6.1.7  Check scrub brushes for contamination		Completed:____X______
  6.1.8  Check scrub brush height in both modules	Completed:____X______
  Comments: Found small D.I. water leak around Outside Brush Station Roller
            Arm Shaft(Front). The water had leaked onto the support plate under
            the Outside Brush Station and into Drip Pan. Sealed bottom of tank
            with RTV.
        
           __________________________________________________________________
 | 
| 46.65 | WEEKLY PM FOR WW20 COMPLETED | SUBPAC::BJUBINVILLE | CMP-6 Equipment Engineering | Tue Nov 12 1996 21:20 | 31 | 
|  | 
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 11/12/96   SYSTEM RTC CODE: CMP-SCRUB.A1   TECH. NAME: Jubinville (BJ)
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50 BJ
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  37/37 BJ
  6.1.3  Check the Drip Pan for contamination           Completed:   BJ
  6.1.4  Check all tubing/fittings for leaks		Completed:   BJ
  6.1.5  Check all wafer transport belts		Completed:   BJ
  6.1.6  Clean the Send module and Scrub modules  	Completed:   BJ
  6.1.7  Check scrub brushes for contamination		Completed:   BJ
  6.1.8  Check scrub brush height in both modules	Completed:   BJ
  Comments:	    
                                  OB      IB
      	   Brush Heights: Front  270     345    
                          Rear   310     345
     BRUSHES CHANGED ON 10/21 HENCE THE DIFFERENCE IN BRUSH
     HEIGHTS FROM LAST WEEKS WEEKLY PM. 
           ----------------------------------
 | 
| 46.66 | WW 21 weekly p.m. completed | FABSIX::R_GEE |  | Mon Nov 18 1996 18:51 | 28 | 
|  | 
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 11/18/96   SYSTEM RTC CODE: CMP-SCRUB.A1   TECH. NAME: BG 
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  38/38 
  6.1.3  Check the Drip Pan for contamination           Completed:   BG
  6.1.4  Check all tubing/fittings for leaks		Completed:   BG
  6.1.5  Check all wafer transport belts		Completed:   BG
  6.1.6  Clean the Send module and Scrub modules  	Completed:   BG
  6.1.7  Check scrub brushes for contamination		Completed:   BG
  6.1.8  Check scrub brush height in both modules	Completed:   BG
  Comments:	    
                                  OB      IB
      	   Brush Heights: Front  270     345    
                          Rear   310     345
  
 | 
| 46.67 | ww22 pm completed | FABSIX::B_FINN |  | Sun Nov 24 1996 13:49 | 28 | 
|  | 
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 11/24/96   SYSTEM RTC CODE: CMP-SCRUB.A1   TECH. NAME:Landry,Finn
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:  50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  39/39
  6.1.3  Check the Drip Pan for contamination           Completed:   TL/BF
  6.1.4  Check all tubing/fittings for leaks		Completed:   TL/BF
  6.1.5  Check all wafer transport belts		Completed:   TL/BF
  6.1.6  Clean the Send module and Scrub modules  	Completed:   TL/BF
  6.1.7  Check scrub brushes for contamination		Completed:   TL/BF
  6.1.8  Check scrub brush height in both modules	Completed:   TL/BF
  Comments:	    
                                  OB      IB
      	   Brush Heights: Front  270     345    
                          Rear   310     345
  
 | 
| 46.68 | WW 23 - Weekly completed | SUBPAC::LANDRY |  | Sun Dec 01 1996 18:34 | 28 | 
|  | 
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 12/1/96   SYSTEM RTC CODE: CMP-SCRUB.A1   TECH. NAME: Landry/Finn/Gee
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:   50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  39/38
  6.1.3  Check the Drip Pan for contamination           Completed:     X
  6.1.4  Check all tubing/fittings for leaks		Completed:     X
  6.1.5  Check all wafer transport belts		Completed:     X
  6.1.6  Clean the Send module and Scrub modules  	Completed:     X
  6.1.7  Check scrub brushes for contamination		Completed:     X
  6.1.8  Check scrub brush height in both modules	Completed:     X
  Comments:	    
                                  OB      IB
      	   Brush Heights: Front  270     345    
                          Rear   310     345
  
 | 
| 46.69 | WW 24 - Weekly completed | SUBPAC::LANDRY |  | Sun Dec 08 1996 13:40 | 28 | 
|  | 
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 12/8/96   SYSTEM RTC CODE: CMP-SCRUB.A1   TECH. NAME: Landry / Gee
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:   50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  39/38
  6.1.3  Check the Drip Pan for contamination           Completed:     X
  6.1.4  Check all tubing/fittings for leaks		Completed:     X
  6.1.5  Check all wafer transport belts		Completed:     X
  6.1.6  Clean the Send module and Scrub modules  	Completed:     X
  6.1.7  Check scrub brushes for contamination		Completed:     X
  6.1.8  Check scrub brush height in both modules	Completed:     X
  Comments:	    
                                  OB      IB
      	   Brush Heights: Front  270     345    
                          Rear   310     345
  
 | 
| 46.70 | WW XXV - Weekly completed | SUBPAC::LANDRY |  | Sun Dec 15 1996 14:43 | 31 | 
|  | 
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 12/15/96   SYSTEM RTC CODE: CMP-SCRUB.A1   TECH. NAME: Landry / Gee
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:   50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  38/37
  6.1.3  Check the Drip Pan for contamination           Completed:     X
  6.1.4  Check all tubing/fittings for leaks		Completed:     X
  6.1.5  Check all wafer transport belts		Completed:     X
  6.1.6  Clean the Send module and Scrub modules  	Completed:     X
  6.1.7  Check scrub brushes for contamination		Completed:     X
  6.1.8  Check scrub brush height in both modules	Completed:     X
  Comments:   Found water on back side of the send station.  Water is dripping
              from the send station where the cover and tank meet.
                                 OB      IB
                                ----    ----
      	   Brush Heights: Front  270     345    
                          Rear   310     345
  
 | 
| 46.71 | weekly ww26 | FABSIX::M_RIDLON | Eliminate the oblivious | Mon Dec 23 1996 02:05 | 30 | 
|  | 
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 12/23/96   SYSTEM RTC CODE: CMP-SCRUB.A1   TECH. NAME: Ridlon
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:   50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  38/37
  6.1.3  Check the Drip Pan for contamination           Completed:     X
  6.1.4  Check all tubing/fittings for leaks		Completed:     X
  6.1.5  Check all wafer transport belts		Completed:     X
  6.1.6  Clean the Send module and Scrub modules  	Completed:     X
  6.1.7  Check scrub brushes for contamination		Completed:     X
  6.1.8  Check scrub brush height in both modules	Completed:     X
                                 OB      IB
                                ----    ----
      	   Brush Heights: Front  270     345    
                          Rear   310     345
  Comments:   Found water on back side of the send station.  Water is dripping
              from the send station where the cover and tank meet.
  
 | 
| 46.72 | cmp-scrub.a1 shutdown checksheet completed | FABSIX::R_GEE |  | Tue Dec 31 1996 15:56 | 23 | 
|  | 
                CMP-SCRUB.A1/.A2/.A3/.C1-7 SHUTDOWN CHECKSHEET  Tech: Tim Landry
                ----------------------------------------------        Bob Gee
                                                        Tech.       Date
                                                       -------     -------
  1.  Close main incoming DI Water valve(s) to each
      system and open the DI Water return valve
      (UDR).  This will allow all incoming DI Water
      to flow to UDR.                                  Tim Landry  12/31/96
  2.  Remove all PVA scrub brushes and submerge        Bob Gee     12/31/96
      in a mixture of DI water and H2O2.  Label 
      each brush with the tool name and brush box
      location.
  3.  Perform a complete wipe down and dry of
      all wet surfaces.                                Tim Landry  12/31/96
  4.  Power down each system.                          Tim Landry  12/31/96
  5.  Enter checksheet into notesfile.                 Bob Gee     12/31/96
 | 
| 46.73 | WEEKLY PM  COMPLETED FOR WW27 | SUBPAC::BJUBINVILLE | CMP-6 Equipment Engineering | Thu Jan 02 1997 07:39 | 29 | 
|  | 
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 1/2/97   SYSTEM RTC CODE: CMP-SCRUB.A1   TECH. NAME: Olin Whitford (OW)
                                                         Brian Jubinville (BJ)
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:   50/OW
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  40/38/BJ
  6.1.3  Check the Drip Pan for contamination           Completed:     BJ
  6.1.4  Check all tubing/fittings for leaks		Completed:     BJ
  6.1.5  Check all wafer transport belts		Completed:     BJ
  6.1.6  Clean the Send module and Scrub modules  	Completed:     BJ
  6.1.7  Check scrub brushes for contamination		Completed:     BJ
  6.1.8  Check scrub brush height in both modules	Completed:     OW
                                 OB      IB
                                ----    ----
      	   Brush Heights: Front  270     345    
                          Rear   310     345
  Comments:  
 | 
| 46.74 | WEEKLY PM COMPLETED FOR WW28 | SUBPAC::BJUBINVILLE | CMP-6 Equipment Engineering | Wed Jan 08 1997 06:06 | 29 | 
|  | 
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 1/8/97   SYSTEM RTC CODE: CMP-SCRUB.A1   TECH. NAME: Olin Whitford (OW)
                                                        
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:   50 OW
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: * 38 OW
  6.1.3  Check the Drip Pan for contamination           Completed: OW    
  6.1.4  Check all tubing/fittings for leaks		Completed: OW
  6.1.5  Check all wafer transport belts		Completed: OW
                                                                      
  6.1.6  Clean the Send module and Scrub modules  	Completed: OW
  6.1.7  Check scrub brushes for contamination		Completed: OW
  6.1.8  Check scrub brush height in both modules	Completed: OW
                                 OB      IB
                                ----    ----
      	   Brush Heights: Front  270     345    
                          Rear   310     345
  Comments:  6.1.2 - Engineer notified..
 | 
| 46.75 | WW29 Weekly PM | FABSIX::R_POIRIER |  | Mon Jan 13 1997 04:40 | 31 | 
|  | --------------------------------------------------------------------------------
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 01/13/97   SYSTEM RTC CODE: CMP-SCRUB.A1  TECH. NAMES: ROGER POIRIER
                                                              MITCH RIDLON
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:   50 RP
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: * 35 RP
  6.1.3  Check the Drip Pan for contamination           Completed: MR/RP
  6.1.4  Check all tubing/fittings for leaks		Completed: MR/RP
  6.1.5  Check all wafer transport belts		Completed: RP
                                                                      
  6.1.6  Clean the Send module and Scrub modules  	Completed: RP
  6.1.7  Check scrub brushes for contamination		Completed: RP
  6.1.8  Check scrub brush height in both modules	Completed: RP
                                 OB      IB
                                ----    ----
      	   Brush Heights: Front  270     345    
                          Rear   310     345
  Comments:  * 6.1.2 - Engineer notified..
 | 
| 46.76 | WW30 Weekly PM Completed | FABSIX::R_POIRIER |  | Sun Jan 19 1997 22:34 | 31 | 
|  | 
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 01/19/97   SYSTEM RTC CODE: CMP-SCRUB.A1  TECH. NAMES: ROGER POIRIER (RP)
                                                              
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:   50 RP
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:   35 RP *
  6.1.3  Check the Drip Pan for contamination           Completed: RP
  6.1.4  Check all tubing/fittings for leaks		Completed: RP
  6.1.5  Check all wafer transport belts		Completed: RP
                                                                      
  6.1.6  Clean the Send module and Scrub modules  	Completed: RP
  6.1.7  Check scrub brushes for contamination		Completed: RP
  6.1.8  Check scrub brush height in both modules	Completed: RP
                                 OB      IB
                                ----    ----
      	   Brush Heights: Front  270     345    
                          Rear   310     345
  Comments:  * 6.1.2 - Low D.I. Water pressure
		E.E. notified..
 | 
| 46.77 | WW31 Weekly PM | FABSIX::R_POIRIER |  | Mon Jan 27 1997 21:59 | 31 | 
|  | 
         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 01/27/97   SYSTEM RTC CODE: CMP-SCRUB.A1  TECH. NAMES: ROGER POIRIER (RP)
                                                              
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:   50 RP
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:   35 RP *
  6.1.3  Check the Drip Pan for contamination           Completed: RP
  6.1.4  Check all tubing/fittings for leaks		Completed: RP
  6.1.5  Check all wafer transport belts		Completed: RP
                                                                      
  6.1.6  Clean the Send module and Scrub modules  	Completed: RP
  6.1.7  Check scrub brushes for contamination		Completed: RP
  6.1.8  Check scrub brush height in both modules	Completed: RP
                                 OB      IB
                                ----    ----
      	   Brush Heights: Front  270     345    
                          Rear   310     345
  Comments:  * 6.1.2 - Low D.I. Water pressure
		E.E. notified..
 | 
| 46.78 | QUARTERLY PM COMPLETED FOR WW32 | SUBPAC::BJUBINVILLE | CMP-6 Equipment Engineering | Wed Feb 05 1997 08:36 | 48 | 
|  |            OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
             Quarterly Preventative Maintenance Check Sheet, Rev D
 DATE: 02.05.97  SYSTEM RTC CODE: CMP-SCRUB.A1 TECH NAME: Leon Shkolnikov - LS
  6.1    Perform Weekly PM                              Completed: ls
  6.3.1  Check muffin fans for functionality		Completed: ls
  6.3.2  Check motor drive belts for defects		Completed: ls
  6.3.3  Check the robot knife for loose hardware	Completed: ls
  6.3.4  Check the spin station grippers		Completed: ls 
  6.3.5  Check the motor speed output readings		Completed: ls
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 psi LS  
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 37 psi* LS
  6.1.3  Check the Drip Pan for contamination           Completed:  ls       
  6.1.4  Check all tubing/fittings for leaks		Completed:  ls
  6.1.5  Check all wafer transport belts		Completed:  ls
  6.1.6  Clean the Send module and Scrub modules  	Completed:  ls
  6.1.7  Check scrub brushes for contamination		Completed:  ls
  6.1.8  Check scrub brush height in both modules	Completed:  ls
 
 Comments: Brush heights
                           OB    IB
                   Rear    310   345
                   Front   270   345
* 6.1.2 Low DI water pressure - EE notified.
                                                                          
                                                                          
 | 
| 46.79 | WW #33 Weekly PM | FABSIX::O_WHITFORD | Lead, follow or step aside. | Thu Feb 13 1997 05:57 | 34 | 
|  |                                                                        
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 2/13/97   SYSTEM RTC CODE: CMP-SCRUB.A1  TECH. NAME: Dave Whitford
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 DW
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 38* DW
  6.1.3  Check the Drip Pan for contamination           Completed: DW
  6.1.4  Check all tubing/fittings for leaks		Completed: DW
  6.1.5  Check all wafer transport belts		Completed: DW
  6.1.6  Clean the Send module and Scrub modules  	Completed: DW
  6.1.7  Check scrub brushes for contamination		Completed: DW
  6.1.8  Check scrub brush height in both modules	Completed: DW
  Comments: Brush heights
            Outer station
                  Inside = .270
                  Outside= .310
            Inner station
                  Inside = .345
                  Outside= .345
* Equipment engineering has been notified that DI Water pressure cannot
be adjusted up to the specified 40 PSI.
 | 
| 46.80 | WW 34 - Weekly completed | SUBPAC::LANDRY |  | Tue Feb 18 1997 13:52 | 35 | 
|  |                                                                        
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 2/18/97   SYSTEM RTC CODE: CMP-SCRUB.A1  TECH. NAME: Brendan Finn  (BF)
                                                            Tim Landry    (TL)
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 BF
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 37/37 BF
  6.1.3  Check the Drip Pan for contamination           Completed: TL
  6.1.4  Check all tubing/fittings for leaks		Completed: BF
  6.1.5  Check all wafer transport belts		Completed: BF
  6.1.6  Clean the Send module and Scrub modules  	Completed: TL
  6.1.7  Check scrub brushes for contamination		Completed: TL
  6.1.8  Check scrub brush height in both modules	Completed: BF
  Comments: Brush heights
            Outer station
                  Inside = 270
                  Outside= 310
            Inner station
                  Inside = 345
                  Outside= 345
* Equipment engineering has been notified that DI Water pressure cannot
be adjusted up to the specified 40 PSI.
 | 
| 46.81 | WW 35 - Weekly completed | FABSIX::J_SADIN | Freedom isn't free. | Tue Feb 25 1997 13:20 | 38 | 
|  |                                                                        
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 2/25/97   SYSTEM RTC CODE: CMP-SCRUB.A1  TECH. NAME: Jim Sadin     (JS)
                                                            Brendan Finn  (BF)
                                                            Bob Gee       (BG)
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 JS
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 37/37 JS
  6.1.3  Check the Drip Pan for contamination           Completed: BG
  6.1.4  Check all tubing/fittings for leaks		Completed: BF
  6.1.5  Check all wafer transport belts		Completed: JS
  6.1.6  Clean the Send module and Scrub modules  	Completed: JS/BG
                                                                     
  6.1.7  Check scrub brushes for contamination		Completed: BF
  6.1.8  Check scrub brush height in both modules	Completed: JS
  Comments: Brush heights
            Outer station
                  Inside = 270
                  Outside= 310
            Inner station
                  Inside = 345
                  Outside= 345
* Equipment engineering has been notified that DI Water pressure cannot
be adjusted up to the specified 40 PSI.
* Replaced burnt out door latch bulb.
 | 
| 46.82 | ww36 weekly pm. | FABSIX::L_SHKOLNIKOV | No more experiments with freedom | Wed Mar 05 1997 01:37 | 31 | 
|  | 
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:03/05/97   SYSTEM RTC CODE: CMP-SCRUB.A1 TECH: Leon shkolnikov  (LS)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:    50 psi
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  * 38 psi
  6.1.3  Check the Drip Pan for contamination           Completed:     LS
  6.1.4  Check all tubing/fittings for leaks		Completed:     LS
  6.1.5  Check all wafer transport belts		Completed:     LS
  6.1.6  Clean the Send module and Scrub modules  	Completed:     LS
  6.1.7  Check scrub brushes for contamination		Completed:     LS
  6.1.8  Check scrub brush height in both modules	Completed:     LS
                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 310      345
                          Rear  270      345
  Comments: *EE has been notified that DI water pressure can't be 
             adjusted up to 40 psi.
                                                                        
 | 
| 46.83 | WEEKLY PM FOR WW37 COMPLETED | SUBPAC::BJUBINVILLE | CMP Equipment Engineering | Thu Mar 13 1997 21:27 | 31 | 
|  | 
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:03/13/97   SYSTEM RTC CODE: CMP-SCRUB.A1 TECH: Brian Jubinville  (BJ)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 BJ
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  * 38 BJ
  6.1.3  Check the Drip Pan for contamination           Completed: BJ
  6.1.4  Check all tubing/fittings for leaks		Completed: BJ
  6.1.5  Check all wafer transport belts		Completed: BJ
  6.1.6  Clean the Send module and Scrub modules  	Completed: BJ
  6.1.7  Check scrub brushes for contamination		Completed: BJ
  6.1.8  Check scrub brush height in both modules	Completed: BJ
                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 310      345
                          Rear  270      345
  Comments: 6.1.2 * EE has been notified that DI water pressure can't be 
            adjusted up to 40 psi.
                                                                        
 | 
| 46.84 | WW38 weekly pm completed. | FABSIX::J_SADIN | Freedom isn't free. | Sun Mar 16 1997 13:17 | 32 | 
|  | 
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:03/16/97   SYSTEM RTC CODE: CMP-SCRUB.A1 TECH: Timothy Landry (TL)
                                                     James Sadin    (JS)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 JS
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  * 38 JS
  6.1.3  Check the Drip Pan for contamination           Completed: TL
  6.1.4  Check all tubing/fittings for leaks		Completed: TL
  6.1.5  Check all wafer transport belts		Completed: JS
  6.1.6  Clean the Send module and Scrub modules  	Completed: TL/JS
  6.1.7  Check scrub brushes for contamination		Completed: TL
  6.1.8  Check scrub brush height in both modules	Completed: JS
                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 270      345
                          Rear  310      345
  Comments: 6.1.2 * EE has been notified that DI water pressure can't be 
            adjusted up to 40 psi.
                                                                        
 | 
| 46.85 | WW39 weekly pm completed. | FABSIX::J_SADIN | Freedom isn't free. | Tue Mar 25 1997 12:55 | 32 | 
|  | 
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:03/25/97   SYSTEM RTC CODE: CMP-SCRUB.A1 TECH: Timothy Landry (TL)
                                                     James Sadin    (JS)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 JS
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  * 37 JS
  6.1.3  Check the Drip Pan for contamination           Completed: TL
  6.1.4  Check all tubing/fittings for leaks		Completed: TL
  6.1.5  Check all wafer transport belts		Completed: JS
  6.1.6  Clean the Send module and Scrub modules  	Completed: TL/JS
  6.1.7  Check scrub brushes for contamination		Completed: TL
  6.1.8  Check scrub brush height in both modules	Completed: JS
                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 339      345
                          Rear  350      345
  Comments: 6.1.2 * EE has been notified that DI water pressure can't be 
            adjusted up to 40 psi.
                                                                        
 | 
| 46.86 | ww40 weekly pm completed. | FABSIX::J_SADIN | Freedom isn't free. | Mon Mar 31 1997 09:58 | 35 | 
|  |                                                              
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:03/31/97   SYSTEM RTC CODE: CMP-SCRUB.A1 TECH: Timothy Landry (TL)
                                                     James Sadin    (JS)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 JS
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  * 37 JS
  6.1.3  Check the Drip Pan for contamination           Completed: TL
  6.1.4  Check all tubing/fittings for leaks		Completed: TL
  6.1.5  Check all wafer transport belts		Completed: JS
  6.1.6  Clean the Send module and Scrub modules  	Completed: TL/JS
  6.1.7  Check scrub brushes for contamination		Completed: TL
  6.1.8  Check scrub brush height in both modules	Completed: JS
                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 349      345
                          Rear  349      345
  Comments: 6.1.2 * EE has been notified that DI water pressure can't be 
            adjusted up to 40 psi.
                                                                        
            found small puddle of water under machine. could not determine
source. cleaned up water. 
 | 
| 46.87 | WW41 weekly pm completed | FABSIX::J_SADIN | Freedom isn't free. | Wed Apr 09 1997 09:54 | 36 | 
|  |                                                              
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:04/09/97   SYSTEM RTC CODE: CMP-SCRUB.A1 TECH: Timothy Landry (TL)
                                                     James Sadin    (JS)
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 JS
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  * 37 JS
  6.1.3  Check the Drip Pan for contamination           Completed: TL
  6.1.4  Check all tubing/fittings for leaks		Completed: TL
  6.1.5  Check all wafer transport belts		Completed: JS
  6.1.6  Clean the Send module and Scrub modules  	Completed: TL/JS
  6.1.7  Check scrub brushes for contamination		Completed: TL
  6.1.8  Check scrub brush height in both modules	Completed: JS
                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 350      345
                          Rear  350      345
  Comments: 6.1.2 * EE has been notified that DI water pressure can't be 
            adjusted up to 40 psi.
                                                                        
            found small puddle of water under machine. could not determine
source. cleaned up water. 
           
 | 
| 46.88 | WEEKLY PM FOR WW42 COMPLETED | SUBPAC::BJUBINVILLE | CMP Equipment Engineering | Fri Apr 18 1997 06:03 | 34 | 
|  |                                                              
             OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:04/18/97   SYSTEM RTC CODE: CMP-SCRUB.A1 TECH: Brian Jubinville (BJ)
                                                
                                                      
                                                      
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 BJ
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:  * 37 BJ
  6.1.3  Check the Drip Pan for contamination           Completed: BJ
  6.1.4  Check all tubing/fittings for leaks		Completed: BJ
  6.1.5  Check all wafer transport belts		Completed: BJ
  6.1.6  Clean the Send module and Scrub modules  	Completed: BJ
  6.1.7  Check scrub brushes for contamination		Completed: BJ
  6.1.8  Check scrub brush height in both modules	Completed: BJ
                                 OB      IB
                                ----    ----
      	   Brush Heights: Front 350      345
                          Rear  350      345
  Comments: 6.1.2 * EE has been notified that DI water pressure can't be 
            adjusted up to 40 psi.
                                                                        
           
 | 
| 46.89 | WW 43 weekly PM complete | FABSIX::O_WHITFORD | Lead, follow or step aside. | Wed Apr 23 1997 13:52 | 31 | 
|  | 
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 4/23/97   SYSTEM RTC CODE:CMP-SCRUB.A1  TECH NAME:  Dave Whitford  (DW)
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 38*
  6.1.3  Check the Drip Pan for contamination           Completed:  DW
  6.1.4  Check all tubing/fittings for leaks		Completed:  DW
  6.1.5  Check all wafer transport belts		Completed:  DW
  6.1.6  Clean the Send module and Scrub modules  	Completed:  DW
  6.1.7  Check scrub brushes for contamination		Completed:  DW
  6.1.8  Check scrub brush height in both modules	Completed:  DW
      	Outer Brush station  Front .373
                             Rear  .349
        Inner Brust Station  Front .345
                             Rear  .345
                             
  Comments: *Notified EE if 2 psi variation in DI water pressure
                                                           
 | 
| 46.90 | WEEKLY PM COMPLETED FOR WW44 | FABSIX::B_JUBINVILLE |  | Wed Apr 30 1997 00:05 | 32 | 
|  | 
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 4/29/97   SYSTEM RTC CODE:CMP-SCRUB.A1  TECH NAME: Brian Jubinville (BJ)
                                                          Dave Morin (DM)
    
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 BJ/DM 
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 38* BJ/DM 
  6.1.3  Check the Drip Pan for contamination           Completed:  BJ/DM 
  6.1.4  Check all tubing/fittings for leaks		Completed:  BJ/DM 
  6.1.5  Check all wafer transport belts		Completed:  BJ/DM 
  6.1.6  Clean the Send module and Scrub modules  	Completed:  BJ/DM 
  6.1.7  Check scrub brushes for contamination		Completed:  BJ/DM 
  6.1.8  Check scrub brush height in both modules	Completed:  BJ/DM 
      	Outer Brush station  Front .350
                             Rear  .350
        Inner Brush Station  Front .345
                             Rear  .345
                             
  Comments: 6.1.2 DI out of spec. E.E. notified
                                                           
 | 
| 46.90 | WW44 weekly pm completed | FABSIX::B_JUBINVILLE |  | Wed Apr 30 1997 05:29 | 32 | 
|  | 
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE: 4/29/97   SYSTEM RTC CODE:CMP-SCRUB.A1  TECH NAME: Brian Jubinville (BJ)
                                                          Dave Morin (DM)
    
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 BJ/DM 
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust: 38 BJ/DM * 
  6.1.3  Check the Drip Pan for contamination           Completed:  BJ/DM 
  6.1.4  Check all tubing/fittings for leaks		Completed:  BJ/DM 
  6.1.5  Check all wafer transport belts		Completed:  BJ/DM 
  6.1.6  Clean the Send module and Scrub modules  	Completed:  BJ/DM 
  6.1.7  Check scrub brushes for contamination		Completed:  BJ/DM 
  6.1.8  Check scrub brush height in both modules	Completed:  BJ/DM 
      	Outer Brush station  Front .350
                             Rear  .350
        Inner Brush Station  Front .345
                             Rear  .345
                             
  Comments: 6.1.2 DI out of spec. E.E. notified
                                                           
 | 
| 46.91 | WW45 SEMI-ANNUAL COMPLETED | FABSIX::R_POIRIER |  | Sat May 10 1997 23:45 | 100 | 
|  | 
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:5/10/97  SYSTEM RTC CODE: CMP-SCRUB.A1  TECH. NAME: JOHN POIRIER (JP)
                                                          MIKE STANDING (MS)
							  ROGER POIRIER (RP)
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust:50PSI_JP____
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:38PSI JP *
  6.1.3  Check the Drip Pan for contamination           Completed:DRY_JP_____
  6.1.4  Check all tubing/fittings for leaks		Completed:DRY_JP_____
  6.1.5  Check all wafer transport belts		Completed:___RP______
  6.1.6  Clean the Send module and Scrub modules  	Completed:DONE__JP___
  6.1.7  Check scrub brushes for contamination		Completed:CLEAN_JP___
  6.1.8  Check scrub brush height in both modules	Completed:__RP_________
  Comments:____OUTSIDE FRONT 350    OUTSIDE REAR 350   
	        INSIDE FRONT 345     INSIDE REAR 345
  *  6.1.2 DI WATER PRESSURE AT 40 PSI 
	WATER PRESSURE AT 38 PSI E.E. NOTIFIED.
--------------------------------------------------------------------------------
           OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
             Quarterly Preventative Maintenance Check Sheet, Rev D
 DATE:5-10-97    SYSTEM RTC CODE:CMP-SCRUB.A1  TECH. NAME: Roger Poirier (RP)
							   Brad Westphal (BW)
							   John Poirier (JP)
  6.1    Perform Weekly PM                              Completed:___RP______
  6.3.1  Check muffin fans for functionality		Completed:GOOD JP____
  6.3.2  Check motor drive belts for defects		Completed:__BW_______
  6.3.3  Check the robot knife for loose hardware	Completed:GOOD JP____
  6.3.4  Check the spin station grippers		Completed:GOOD JP____
  6.3.5  Check the motor speed output readings		Completed:___RP______
  Comments:__ROBOT ROTATION BELT WAS REPLACED AND MOTOR POSITION ADJUSTED.___
             E.E. NOTIFIED
          
-------------------------------------------------------------------------------
           OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
            Semi-Annual Preventative Maintenance Check Sheet, Rev D
 DATE:_5-10-97    SYSTEM RTC CODE:CMP-SCRUB.A1  TECH. NAME:Roger Poirier (RP)
							   Mike Standing (MS) 
  6.1    Perform Weekly PM                              Completed:___RP______
                                                        
  6.3    Perform Quarterly PM                           Completed:___RP______
  6.4.1  Check all EMO's for functionality		Completed:GOOD MS____
  6.4.2  Check all interlocks for functionality  	Completed:GOOD MS____
  6.4.3  Check heat lamp housing/wiring for defects	Completed:GOOD MS____
  6.4.4  Check the robot hardware/wiring for defects	Completed:___RP______
  6.4.5  Check the spindle bearings/bushings		Completed:___RP____
  6.4.6  Check the spin sta. rollers/bearings/bushings	Completed:___RP______
  6.4.7  Check the brush sta. drive bearings/bushings	Completed:___RP______
  6.4.8  Check the +5 VDC power supply			Pre-Adjust:+5.00V RP
							Post-Adjust: +5.00V RP
  6.4.9  Check the -12 VDC power supply			Pre-Adjust:-12.01V RP
  6.4.10 Check the +12 VDC power supply			Pre-Adjust:+12.01V RP
  6.4.11 Check the +24 VDC power supply			Pre-Adjust:+24.OV RP
							Post-Adjust:+24.0V RP
  6.4.12 Check the +48 VDC power supply			Pre-Adjust:+48.01V RP
							Post-Adjust:+48.01V RP
  Comments:__________________________________________________________________
           __________________________________________________________________
           __________________________________________________________________
 | 
| 46.92 | WW 46 - Weekly completed | SUBPAC::LANDRY |  | Sun May 11 1997 19:05 | 28 | 
|  | 
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:5/11/97  SYSTEM RTC CODE: CMP-SCRUB.A1  TECH. NAME: Jim Sadin (JS)
                                                          Tim Landry (TL)
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 PSI  JS
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:37/37 PSI JS
  6.1.3  Check the Drip Pan for contamination           Completed:   TL
  6.1.4  Check all tubing/fittings for leaks		Completed:   TL
  6.1.5  Check all wafer transport belts		Completed:   JS
  6.1.6  Clean the Send module and Scrub modules  	Completed:   JS/TL
  6.1.7  Check scrub brushes for contamination		Completed:   JS/TL
  6.1.8  Check scrub brush height in both modules	Completed:   JS/TL
  Comments:____OUTSIDE FRONT 350    OUTSIDE REAR 350   
	        INSIDE FRONT 345     INSIDE REAR 345
  *  6.1.2 DI WATER PRESSURE AT 40 PSI 
	WATER PRESSURE AT 38 PSI E.E. NOTIFIED.
 | 
| 46.93 | WW47 Weekly PM completed | FABSIX::R_POIRIER |  | Tue May 20 1997 04:46 | 32 | 
|  | 
        OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:5/20/97  SYSTEM RTC CODE: CMP-SCRUB.A1  TECH. NAME: Roger Poirier (RP)
                                                          
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 PSI RP
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:37/37 PSI RP*
  6.1.3  Check the Drip Pan for contamination           Completed:   RP *
  6.1.4  Check all tubing/fittings for leaks		Completed:   RP
  6.1.5  Check all wafer transport belts		Completed:   RP
  6.1.6  Clean the Send module and Scrub modules  	Completed:   RP
  6.1.7  Check scrub brushes for contamination		Completed:   RP
  6.1.8  Check scrub brush height in both modules	Completed:   RP
  Comments:____OUTSIDE FRONT 350    OUTSIDE REAR 350   
	        INSIDE FRONT 345     INSIDE REAR 345
  *  6.1.2 DI WATER PRESSURE AT 40 PSI 
	Water pressure at 37 PSI E.E. Notified.
  *  6.1.3  Found small puddle in drip pan. Traced back to Outside
	    Brush Lower feed. Put new teflon tape on threads.
	    E.E. Notified.
 | 
| 46.94 | CMP-SCRUB.A1 SHUTDOWN AND STARTUP CHECKSHEETS | FABSIX::J_SADIN | Freedom isn't free. | Tue May 27 1997 10:10 | 57 | 
|  | 
				Scrub.A1
          CMP-SCRUB.A1/.A2/.A3/.C1 SHUTDOWN CHECKSHEET FOR 5/26/97
          --------------------------------------------------------
                                                        Tech.       Date
                                                       -------     -------
  1.  Change Workstream tool status to NON_SCHEDULED  
      DOWN.  If Workstream will not let the tools go
      to NON-SCHEDULED, leave the tools at UP IDLE.
      DO NO put any tools to SCHEDULED or UNSCHEDULED     RP        5-26-97
       DOWN.                                            _______     _______
  2.  Close main incoming DI Water valve(s) to each
      system and open the DI Water return valve
      (UDR).  This will allow all incoming DI Water       RP        5-26-97
      to flow to UDR.                                  _______     _______
  3.  Remove all PVA scrub brushes and submerge
      in a mixture of DI water and H2O2.  Label 
      each brush with the tool name and brush box         RP        5-26-97
      location.                                        _______     _______
  4.  Perform a complete wipe down and dry of             RP       5-26-97
      all wet surfaces.                                _______     _______
              						  RP       5-26-97
  5.  Power down each system.                          _______     _______
  6.  Enter checksheet into notesfile.
           CMP-SCRUB.A1/.A2/.A3/.C1-7 STARTUP CHECKSHEET FOR 5/27/97
           ---------------------------------------------------------
                                                        Tech.       Date
                                                       -------     -------
  1.  Ensure that all necessary facilities are           tl        5/27
      available and ready to use.                      _______     _______
                                                         tl        5/27
  2.  Power up each system.                            _______     _______
                                                         tl        5/27
  3.  Re-install PVA scrub brushes.                    _______     _______
  4.  Open incoming DI Water Valve(s) to each            tl        5/27
      system.                                          _______     _______  
                                                         tl        5/27
  5.  Close UDR valve at each system.                  _______     _______
  6.  Cycle a minimum of 25 wafers through each          tl        5/27
      tool to verify proper operation.                 _______     _______
  7.  Notify Operations that the systems are ready       tl        5/27
      for MQC.                                         _______     _______
  8.  Enter checksheet into notesfile.                   tl        5/27
 | 
| 46.95 | WW 48 - Weekly completed | SUBPAC::LANDRY |  | Tue May 27 1997 14:47 | 28 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:5/25/97  SYSTEM RTC CODE: CMP-SCRUB.A1  TECH. NAME: Tim Landry   (TL)
                                                          Brendan Finn (BF)
                                                          
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 PSI 
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:37/37 PSI 
  6.1.3  Check the Drip Pan for contamination           Completed:   TL 
  6.1.4  Check all tubing/fittings for leaks		Completed:   BF
  6.1.5  Check all wafer transport belts		Completed:   TL
  6.1.6  Clean the Send module and Scrub modules  	Completed:   BF
  6.1.7  Check scrub brushes for contamination		Completed:   BF/TL
  6.1.8  Check scrub brush height in both modules	Completed:   BF
  Comments:____OUTSIDE FRONT 350    OUTSIDE REAR 350   
	        INSIDE FRONT 345     INSIDE REAR 345
  *  6.1.2 DI WATER PRESSURE AT 40 PSI 
	Water pressure at 37 PSI E.E. Notified.
 | 
| 46.96 | WW 49 - Weekly completed | SUBPAC::LANDRY |  | Sun Jun 01 1997 19:18 | 29 | 
|  |         OnTrak DSS-200 Scrubber Maintenance Procedures HF6O-0170
           Weekly Preventative Maintenance Check Sheet, Rev D
 DATE:6/1/97  SYSTEM RTC CODE: CMP-SCRUB.A1  TECH. NAME:  Bob Gee      (BG)
                                                          Brendan Finn (BF)
                                                          Tim Landry   (TL)
                                                          Jim Sadin    (JS)
  6.1.1  Check the CDA pressure for 50 PSI		Pre-Adjust: 50 PSI 
  6.1.2  Check the D.I. Water pressure for 40 PSI       Pre-Adjust:39/39 PSI 
  6.1.3  Check the Drip Pan for contamination           Completed:   BF 
  6.1.4  Check all tubing/fittings for leaks		Completed:   TL
  6.1.5  Check all wafer transport belts		Completed:   JS
  6.1.6  Clean the Send module and Scrub modules  	Completed:   BG
  6.1.7  Check scrub brushes for contamination		Completed:   BF/TL
  6.1.8  Check scrub brush height in both modules	Completed:   BF
  Comments:____OUTSIDE FRONT 350    OUTSIDE REAR 350   
	        INSIDE FRONT 345     INSIDE REAR 345
  *  6.1.2 DI WATER PRESSURE AT 40 PSI 
	Water pressure at 39 PSI E.E. Notified.
 |