| Title: | DECmcc user notes file. Does not replace IPMT. |
| Notice: | Use IPMT for problems. Newsletter location in note 6187 |
| Moderator: | TAEC::BEROUD |
| Created: | Mon Aug 21 1989 |
| Last Modified: | Wed Jun 04 1997 |
| Last Successful Update: | Fri Jun 06 1997 |
| Number of topics: | 6497 |
| Total number of notes: | 27359 |
Is it possible to configure the SIZE of the events passed
thru the Event Manager?
For example I have an event which contains a set of FullEntityNames.
When this set becomes >= 100 FullEntityNames (event size 7622)
then I get the following error from my Getevent directive:
%MCC-F-EVENTINTERNERR, Event Manager internal error
So is it possible to configure the Event Manager to pass larger events?
Carol
| T.R | Title | User | Personal Name | Date | Lines |
|---|---|---|---|---|---|
| 2311.1 | No, CVR is misleading, IPC is the limitation | DORIOT::T_HUPPER | The rest, as they say, is history. | Tue Feb 11 1992 14:02 | 21 |
I assume Ultrix and DECmcc T1.2.4.
There are no tunings in the Event Manager for size of event data, as it
depends on the buffer given to it (the out_p buffer from the mcc_call
routine).
I find, in the code, that the Event Manager may be returning a bad CVR. The
real problem seems to be that our IPC limits us to out_p buffers (at the
mcc_call with the Getevent (or any other) directive) of 4K bytes. The Event
Manager should be returning MCC_S_INSUFBUFFER because of this limitation.
This CVR needs to be fixed.
Do you get any events of larger than 4K (event_data) to succeed? If so,
then there is something here that I don't understand.
If the 4K byte out_p limitation is inadequate, then a QAR should be filed
against the EXEC component. V1.2 development is rapidly coming to a close.
Without a QAR in-hand, we will not be able to make any change here (no
guarantee we can make it with a QAR, either).
Ted
| |||||
| 2311.2 | TOOK::MINTZ | Erik Mintz, DECmcc Development, dtn 226-5033 | Fri Feb 21 1992 10:38 | 2 | |
This problem will be addressed before SSB | |||||