159.0. "Shuttle SRB Modifications" by VIKING::FLEISCHER (Bob Fleischer) Fri Mar 07 1986 13:22
from USENET:
-----------
Subj: Re: Redesign booster seals?
Newsgroups: net.space
Path: decwrl!pyramid!hplabs!tektronix!reed!omen!caf
Posted: 5 Mar 86 12:27:54 GMT
Organization: Omen Technology, Portland
 
According to Mar 3 AW&ST, the following changes may be made to the SRBs:
 
Add high strength bolts in the area of the 177 pins joining the segments
 
Catches similar to joints on the new composite SRB's
 
Changes in insulation putty
 
Improved O-ring seals, possible the .291 in diameter seals used in the
composite SRB's, permanently sealed.
 
External band heaters
 
 
According to Mulloy, there are 829 Criticality 1 items on the shuttle,
including 213 on the SRB system.
 
Could somebody from NASA post some of that list?
--------------< end of USENET note >------------
These make sense.  I would not want to see a totally re-designed SRB seal
or casing.  That would require going back to square 1 as far as testing
is concerned.
Bob
| T.R | Title | User | Personal Name
 | Date | Lines | 
|---|
| 159.1 | <<two steps back instead of three... | APOLLO::RUDMAN | RICK | Fri Mar 07 1986 19:18 | 4 | 
|  | They may not be going back to square one as far as testing is concerned, but
I'll bet they're going back to exhaustive testing/demonstration at square two!
									Rick
 |