| Title: | ase | 
| Moderator: | SMURF::GROSSO | 
| Created: | Thu Jul 29 1993 | 
| Last Modified: | Fri Jun 06 1997 | 
| Last Successful Update: | Fri Jun 06 1997 | 
| Number of topics: | 2114 | 
| Total number of notes: | 7347 | 
    Is there any whitepaper or detailed instructions we can give a customer
    to assist them in doing upgrades to DUNIX in a cluster? For exemple,
    since we have to de-install TRC, should we delete that system as a
    member? Once we do that, if we are running OPS, we must do a chown on
    all the drds to reset them BACK to oracle.dba.
    
    Is there any easy to follow directions that list all the issues that a
    customer may face? What is in the DUNIX release notes is too basic.
    
    Thanks,
    
    /jim
    
| T.R | Title | User | Personal Name | Date | Lines | 
|---|---|---|---|---|---|
| 2004.1 | works as documented | KYOSS1::GREEN | Thu Apr 17 1997 10:24 | 9 | |
|     	I recenly did upgrade of TCR:
    	UNIX 3.2f, TCR1.0--> UNIX 3.2g, TCR 1.0; then
    	3.2g, 1.0-->4.0a, TCR1.4--> 4.0b, TCR 1.4
    
    	Basically I just followed directions from files on the CDROMs
    In our case we were able to do "simultaneous upgrades".
    	The key is saving the ASE database.
    		dick
    
 | |||||
| 2004.2 | And the right document is... | NNTPD::"[email protected]" | Dave Cherkus | Fri Apr 18 1997 13:00 | 4 | 
| ... the TCR installation manual. Dave [Posted by WWW Notes gateway] | |||||